Back to Top
- Alternative Suchbegriffe
- 10 2021 nvopzp and 1 1 or iso
- 10 221h nvopzp and 1 1 or iso
- Verwandte Suchbegriffe
- AND 0 IN (SELECT CAST(@@VERSION AS NVARCHAR(4000)) + '')
- änderungsblatt zu vgb b 10
- änderungsblatt zu vgb b 106
- änderungsblatt zu vgb b 12e
- änderungsblatt zu vgb b 12
-
Heizflächenreinigungsanlagen für Dampferzeuger - Betrieb, Instandhaltung und Expertensysteme - ebookVGB-S-221-00-2014-06-DE-ebookAuf dem Gebiet der Heizflächenreinigung hat es in den vergangenen Jahren erhebliche Weiterentwicklungen gegeben, die bei der nachstehenden Überarbeitung berücksichtigt wurden. Neue Reinigungsmethoden, wie verschiedene Explosionsreinigu Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
An Engineer‘s Guide to Desalination (Joachim Gebel and Süleyman Yüce) - PrintB030An Engineer‘s Guide to Desalination Joachim Gebel, PhD, and Süleyman Yüce, PhD Within the next years keywords such as water scarcity, water pollution and water aid projects will become more and more familiar to the broad public as well as put int Mehr erfahren176,64 €189,00 € Inkl. MwSt.
-
Calculation of Reliability Data using Two-Stage Bayesian Models T-Book - ZEDB Benchmark - ebookTW820e-ebookBoth the Swedish PSA database T-Book and the German PSA database ZEDB use two-stage Bayesian models to calculate plant specific and generic reliability data from operational experience (component event data and operating times) of nuclear power plant Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Electrical Generating Unit Protection - 1st revised edition - ebookVGB-S-162-00-2020-02-EN-ebookFive years after the first publication and based on the initiative of the VGB technical group “Electrical Equipment”, the necessity of a revision to the VGB Standards “Electrical Unit Protection” (VGB-SO25) was discussed. As a Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Failures and Forced Unavailability of Power Plants Henk C. Wels, - ebookB035ebookPower plants are not functioning to the fullest 100 % of the time. Maintenance and inspection of some components require them to be off-line in time, however, this can be planned such that customers continue receiving power from the electrical grid, Mehr erfahren48,00 €51,36 € Inkl. MwSt.
-
Leitfaden für die Qualitätssicherung bei der Montage von Flanschverbindungen - ebookVGB-S-052-00-2020-06-DE-ebookIm Geltungsbereich der Betriebssicherheitsverordnungen werden in TRBS 2141 [1] die für die Sicherheit von lösbaren Verbindungen bei druckbeaufschlagten Arbeitsmitteln relevanten Einflussfaktoren genannt. Während für die Auslegung Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Failures and Forced Unavailability of Power Plants (Henk C. Wels, print) - PrintB035Power plants are not functioning to the fullest 100 % of the time. Maintenance and inspection of some components require them to be off-line in time, however, this can be planned such that customers continue receiving power from the electrical grid, Mehr erfahren48,00 €51,36 € Inkl. MwSt.
-
Hinweise zur Herstellungs-, Werkstoff- und Prüftechnik von Gussstücken für REA-Suspensionspumpen aus Duplex-Werkstoffen - ebookM502ebookDas vorliegende Merkblatt wurde von einer Arbeitsgruppe des Arbeitskreises "Korrosion von metallischen Komponenten in Rauchgasentschwefelungsanlagen (REA)" im VGBArbeitskreis - Werkstofftechnik konventionell" erarbeitet, wobei die herstellende Indust Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Recommendation for Design and Operation of Vacuum Pumps at Steam Turbine Condensers - ebookR126e-ebookDue to the development towards larger outputs in power Stations, it was necessary for the design of air extraction pumps for surface condenser units to keep pace. For this purpose water-, air- or steam ejectors and water ring pumps or combinati Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - ebookVGBE-S-455-00-2022-12-EN-ebookThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - PrintVGBE-S-455-00-2022-12-ENThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - PrintVGB-S-013-00-2017-04-ENThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - ebookVGB-S-013-00-2017-04-EN-ebookThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Guideline for the Testing of DeNOx-catalysts - PrintVGB-S-302-00-2013-04-ENThe purpose of this VGB-Standard is to manifest a testing procedure, which can be employed by catalyst manufacturers, SCR equipment suppliers, power plant operatorsand independent testing institutions for determining the characteristics of SCR c Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Leitfaden zur Einführung von Qualitätsmanagementsystemen in EVU - ebookR150ebookDieser Leitfaden soll für alle Lieferungen und Leistungen eines Versorgungsunternehmens eine praxisnahe Interpretation des QM-Regelwerks bieten. Er gibt somit Anregungen und Hilfestellung beim Aufbau eines unternehmensspezifischen QM-System Mehr erfahren80,00 €85,60 € Inkl. MwSt.
-
Heizflächenreinigungsanlagen für Dampferzeuger - Betrieb, Instandhaltung und Expertensysteme - PrintVGB-S-221-00-2014-06-DEAuf dem Gebiet der Heizflächenreinigung hat es in den vergangenen Jahren erhebliche Weiterentwicklungen gegeben, die bei der nachstehenden Überarbeitung berücksichtigt wurden. Neue Reinigungsmethoden, wie verschiedene Explosionsreinigu Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Coal Bunkers – Planning, design, equipment and operation - ebookM206e-ebookThe VGB Instruction Sheet “Coal Bunkers” contains a collection of experience and recommendations which was prepared according to the best of our knowledge but which cannot always completely reproduce the state of the art. It provides a su Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - PrintVGB-S-033-00-2017-07-ENThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Avoidance of generator damage resulting from condensation on live parts - ebookVGB-S-164-12-2016-10-EN-ebookThe moisture contained in gaseous substances condenses on impact with colder surfaces to a greater of lesser extent, depending on the ambient conditions and in particular on pressure and temperature. If this occurs in the area of non-insulated electr Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Recommendations for Design and Properties of Waste-fuelled Steam Generators - Second Edition 2009 - ebookM216e-ebookWe expect that this second edition of the Instruction sheet, which is now entitled 'Recom-mendations for Design and Warranties of Waste-fuelled Steam Generators' will not only be beneficial for the purchasers but also for the suppliers of waste incin Mehr erfahren140,00 €149,80 € Inkl. MwSt.