Back to Top
- Alternative Suchbegriffe
- ordering of pipes systems in thermal po
- ordering of process systems in thermal po
- Verwandte Suchbegriffe
- ordering and exception of fittings in thermal power plant
- ordering and erection of fittings in thermal power plant
- prices fur de mann kauf
- prices for de mann kauf
- prices fur matt ☉
-
Part A: In-service monitoring of turbine oils in steam and gas turbines / Part B: In-service monitoring of fire-resistant fluids for steam and gas turbines - PrintVGB-S-416-00-2014-08-ENPart A describes effective in-service monitoring of oils in turbines. Due to thermal, chemical, physical and mechanical impacts, turbine oils are subject to change during operation. These changes normally lead to a deterioration in the oil characteri Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - PrintVGB-S-121-00-2016-04-ENMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
KKS Identification System for Power Stations - 8th revised edition 2018 (ENGLISH) - PrintVGB-S-811-01-2018-01-ENOwing to the national and international standardization process, the KKS Identification System for Power Stations (hereinafter referred to as “KKS”) is being replaced by the RDS-PP® Reference Designation System for Power Plants based Mehr erfahren680,00 €727,60 € Inkl. MwSt.
-
KKS Identification System for Power Stations - 8th revised edition 2018 (ENGLISH) - ebookVGB-S-811-01-2018-01-EN-ebookOwing to the national and international standardization process, the KKS Identification System for Power Stations (hereinafter referred to as “KKS”) is being replaced by the RDS-PP® Reference Designation System for Power Plants based Mehr erfahren680,00 €727,60 € Inkl. MwSt.
-
Technical and Commercial Key Indicators for Power Plants - 9th edition 2019, free of charge - ebookVGB-S-002-03-2019-10-EN-ebookThis VGB-Standard allows the user to make a technical and economic assessment of power plants. In addition, the effect of price effects and the legal requirements on the power plant operation can be analyzed using the VGB-Standard. In detail, the use Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Measurement Systems - PrintVGB-S-170-43-2015-07-ENMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Measurement Systems - ebookVGB-S-170-43-2015-07-EN-ebookMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Recommendations for Control and Lubrication Systems of Steam and Gas Turbine Installations - ebookM109e-ebookThe present recommendations are primarily concerned with the technical requirements to be fulfilled by the control and lubrication Systems of steam and gas turbine installations. Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - PrintVGB-S-014-2011-ENAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - ebookVGB-S-014-2011-EN-ebookAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Refractory Lining in Fluidised Bed Combustion Plant - PrintVGB-S-219-00-2015-03-ENAdvice for Ordering, Design, Construction and Operation of Refractory Lining in Fluidised Bed Combustion Plant Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Refractory Lining in Fluidised Bed Combustion Plant - ebookVGB-S-219-00-2015-03-EN-eBookAdvice for Ordering, Design, Construction and Operation of Refractory Lining in Fluidised Bed Combustion Plant Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Type, Operation and Maintenance of Flue Gas Desulphurisation Plants (FGD) - PrintVGB-S-015-2011-ENThis VGB-Standard deals with flue gas desulphurisation (FGD) in large combustion plants. At this point, no additive processes, which can be employed in combustion, are considered. Here, only plants downstream of combustion are considered. The aim of Mehr erfahren160,00 €171,20 € Inkl. MwSt.
-
Type, Operation and Maintenance of Flue Gas Desulphurisation Plants (FGD) - ebookVGB-S-015-2011-EN-ebookThis VGB-Standard deals with flue gas desulphurisation (FGD) in large combustion plants. At this point, no additive processes, which can be employed in combustion, are considered. Here, only plants downstream of combustion are considered. The aim of Mehr erfahren160,00 €171,20 € Inkl. MwSt.
-
Tubes for Condensers and Other Heat Exchangers (Part C “Titanium”) - ebookR114e-ebookThe guidelines are intended to provide information to the operating company of combined heat and thermal power plants so that they can order the correct piping for condensers and heat exchangers and also to help them prevent faults and damage. To all Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Tubes for Condensers and Other Heat Exchangers (Part B "Stainless Steels") - ebookR113e-ebookThe "Tubes for condensers and other heat exchangers for the operation of steam turbine plants" guidelines are currently split into three material groups (VGB-R 106 "Copper Alloys", VGB-R 113 "Stainless Steels" and VGB-R 114 "Titanium"). The guideline Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
RDS-PP® Reference Designation System for Power Plants - Letter Code for Power Plant Systems (System Key) - Excel-table (English edition)RDS-PP-EXCEL-ENThe basic international standards for reference designation provide users with gen-erally applicable general rules and letter codes for main classes for the designation of technical objects and their documentation. The standard for power plants esta Mehr erfahren2.950,00 €3.156,50 € Inkl. MwSt.
-
Selection of impulse pipes and sampling lines for water and steam sectors in thermal power stations - ebookVGB-S-170-R-41;2012-07.EN-ebookThis VGB-Standard was created to adapt the design of measurement and analytical/ discharge lines to the increased steam parameters and the updated long-term parameters. Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Assessment of fatigue loaded components in hydro power plants - ebookVGB-S-034-00-2014-10-EN-ebookThe VGB-Standard VGB-S-034-00-2014-10-EN deals with mechanical components and steel hydraulic structures for hydro power plants. The VGB-Standard deals solely with the impact of mechanical and/or thermal loads on the fatigue life of the plant pa Mehr erfahren280,00 €299,60 € Inkl. MwSt.