Back to Top
- Verwandte Suchbegriffe
- heat 3 grundlagen und systematik der verfügbarkeitsermittlung fur wärmekraftwerke
- heat 3 grundlagen und systematik der verfügbarkeitsermittlung fur warmekraftwerken
- heat 3 grundlagen und systematik de verfügbarkeitsermittlung for warmekraftwerk
- heat 3 grundlagen und systematik de verfügbarkeitsermittlung fur warmekraftwerk
- heat 3 grundlagen und systematik de verfügbarkeitsermittlung fur wärmekraftwerke
-
Operation of steam boiler installations Demands on the operator for the operation of steam boiler installations of categories III (from 1,000 bar/liter) and IV - ebookVGB-S-031-00-2012-08-EN-ebookWhen the German Ordinance on Industrial Safety and Health (BetrSichV) of 27 September 2002 came into effect, it marked a paradigm change in the technical rules for the operation of installations subject to monitoring. A hazard-related set of rules en Mehr erfahren260,00 €278,20 € Inkl. MwSt.
-
Guideline for the Use of High-Temperature Bolting - ebookR505e-ebookThis new edition describes the collected manufacturing and operating experience gained, the results of the latest materials examinations as well as the tests and inspections to be performed upon operational loading. This new edition is also supported Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - PrintVGB-S-042-00-2018-01-ENThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - ebookVGB-S-042-00-2018-01-EN-ebookThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - PrintVGB-S-504-00-2015-12-ENSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - ebookVGB-S-504-00-2015-12-EN-ebookSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - PrintVGB-S-013-00-2017-04-ENThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - ebookVGB-S-013-00-2017-04-EN-ebookThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - PrintVGB-S-115-00-2016-01-ENThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - ebookVGB-S-115-00-2016-01-EN-ebookThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
IT Security for Generating Plants - PrintVGB-S-175-00-2014-04-ENThe present VGB Standard S-175 explains fundamental concepts and compiles the threats and the security requirements derived from them in a structured and clear manner. In addition, recommendations for actions regarding the individual requirements hav Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
IT Security for Generating Plants - ebookVGB-S-175-00-2014-04-EN-ebookThe present VGB Standard S-175 explains fundamental concepts and compiles the threats and the security requirements derived from them in a structured and clear manner. In addition, recommendations for actions regarding the individual requirements hav Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Guide for the Procurement of Steam Turbine Plants - PrintVGB-S-145-00-2015-11-ENThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Guide for the Procurement of Steam Turbine Plants - ebookVGB-S-145-00-2015-11-EN-ebookThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Coal Bunkers – Planning, design, equipment and operation - ebookM206e-ebookThe VGB Instruction Sheet “Coal Bunkers” contains a collection of experience and recommendations which was prepared according to the best of our knowledge but which cannot always completely reproduce the state of the art. It provides a su Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
VGB-Standard for the Water in Nuclear Power Plants with Light-Water Reactors Part 1: PWR Part 2: BWR - ebookVGB-S-401-00-2020-05-EN-ebookAlmost half a century after publication of the first edition of a VGB-Guideline for the Water in Nuclear Power Plants with Light-Water Reactors and approx. 13 years after the third edition in 2006, the task of a renewed adaptation of the Guideline fo Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
VGB-Standard for the Water in Nuclear Power Plants with Light-Water Reactors Part 1: PWR Part 2: BWR - PrintVGB-S-401-00-2020-05-ENAlmost half a century after publication of the first edition of a VGB-Guideline for the Water in Nuclear Power Plants with Light-Water Reactors and approx. 13 years after the third edition in 2006, the task of a renewed adaptation of the Guideline fo Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Basic Terms of the Electric Utility Industry, 11th edition, free of charge - ebookVGB-S-002-01-2019-05-EN-ebookAs a result of the now almost global energy transition and the associated requirements for the ever-increasing regulation of the markets while securing competition, the number of terms used and their definitions continues to increase. In&nb Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Recommendations for thermal/mechanical generator protection - PrintVGB-S-164-11-2016-08-ENTo detect incipient damage to generators in power plants, protective equipment is installed. For electrical protection, in 2012 VGB published recommendations in the VGB-Standard VGB-S-025 “Electrical Generating Unit Protection”. The VGBSt Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Recommendations for thermal/mechanical generator protection - ebookVGB-S-164-11-2016-08-EN-ebookTo detect incipient damage to generators in power plants, protective equipment is installed. For electrical protection, in 2012 VGB published recommendations in the VGB-Standard VGB-S-025 “Electrical Generating Unit Protection”. The VGBSt Mehr erfahren280,00 €299,60 € Inkl. MwSt.