Back to Top
- Alternative Suchbegriffe
- de en 62271 20 vdew 01 2012 2023 08
- de en 62271 20 vdew 01 2012 2024 08
- Verwandte Suchbegriffe
- vdew 009e 3 2010 03
- vdew 06 3 2010 03
- vdew 09 3 2010 03
- vdew 00 3 2010 03
- vdew 07 3 2010 03
-
Indication and Application of Actions on Buildings in Power Plants - ebookVGB-S-602-00-2016-04-EN-ebookThe aim of this VGB standard is to provide a consistent procedure for the definition, classification and processing of actions on load-bearing structures for the construc-tion of power plants. It is also intended to cover significant influences of op Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guideline for the Testing of DeNOx-catalysts - PrintVGB-S-302-00-2013-04-ENThe purpose of this VGB-Standard is to manifest a testing procedure, which can be employed by catalyst manufacturers, SCR equipment suppliers, power plant operatorsand independent testing institutions for determining the characteristics of SCR c Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - PrintVGB-S-026-00-2013-04-ENThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Maintenance-compatible documentation - ebookVGB-S-029-S-00;2012-03-EN-ebookMaintenance of conventional power generation facilities is increasingly required to meet demands for maximum cost-effectiveness together, wherever possible, with rising quality. The industrial health and safety regulations require operators to take o Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Oil system cleaning for gas and steam turbine plants - ebookVGB-S-030-00-2013-06-EN-ebookBy collecting and evaluating the vast experience gained during the operation, installation, modification and revision of gas and steam turbine oil plants and incorporating them into this VGB-Standard, the intention is to contribute to the operational Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Maintenance-compatible documentation - PrintVGB-S-029-S-00;2012-03-ENMaintenance of conventional power generation facilities is increasingly required to meet demands for maximum cost-effectiveness together, wherever possible, with rising quality. The industrial health and safety regulations require operators to take o Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Oil system cleaning for gas and steam turbine plants - PrintVGB-S-030-00-2013-06-ENBy collecting and evaluating the vast experience gained during the operation, installation, modification and revision of gas and steam turbine oil plants and incorporating them into this VGB-Standard, the intention is to contribute to the operational Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Guideline for the Testing of DeNOx-catalysts - ebookVGB-S-302-00-2013-04-EN-ebookThe purpose of this VGB-Standard is to manifest a testing procedure, which can be employed by catalyst manufacturers, SCR equipment suppliers, power plant operatorsand independent testing institutions for determining the characteristics of SCR c Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - PrintVGB-S-169-11-2015-11-ENThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - ebookVGB-S-169-11-2015-11-EN-ebookThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Exclusion of foreign material ingress into opened systems/components of nuclear power plants - ebookVGB-S-120-00-2016-02-EN-ebookThe VGB-Standard VGB-S-120 lists measures which are conducive to maintaining cleanliness in the plant (in mechanical, electrical and chemical regards) during maintenance and modification work. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - PrintVGB-S-131-00-2017-07-ENThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - ebookVGB-S-131-00-2017-07-EN-ebookThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Characterisation of Power Plant Coal - PrintVGB-S-210-00-2015-07-ENThe precursor of this Standard the VGB-Bulletin “Charakterisierung von Kraftwerkskohlen” (VGB-R 210; Characterisation of Power Plant Coals) appeared 12 years ago (2003). Some new developments, but, in particular, changed operating conditi Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Characterisation of Power Plant Coal - ebookVGB-S-210-00-2015-07-EN-ebookThe precursor of this Standard the VGB-Bulletin “Charakterisierung von Kraftwerkskohlen” (VGB-R 210; Characterisation of Power Plant Coals) appeared 12 years ago (2003). Some new developments, but, in particular, changed operating conditi Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Preservation of Power Plants - PrintS-116-00-2016-04-ENThe VGB-Standard VGB-S116 shall apply to plants for firing fossil fuels and plants for firing substitute fuels. This standard comprises all essential process systems which are to be considered during plant outage or shutdown and have to be preserved. Mehr erfahren450,00 €481,50 € Inkl. MwSt.
-
Avoidance of generator damage resulting from condensation on live parts - PrintVGB-S-164-12-2016-10-ENThe moisture contained in gaseous substances condenses on impact with colder surfaces to a greater of lesser extent, depending on the ambient conditions and in particular on pressure and temperature. If this occurs in the area of non-insulated electr Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Avoidance of generator damage resulting from condensation on live parts - ebookVGB-S-164-12-2016-10-EN-ebookThe moisture contained in gaseous substances condenses on impact with colder surfaces to a greater of lesser extent, depending on the ambient conditions and in particular on pressure and temperature. If this occurs in the area of non-insulated electr Mehr erfahren280,00 €299,60 € Inkl. MwSt.