Back to Top
- Verwandte Suchbegriffe
- AND 0 IN (SELECT CAST(@@VERSION AS NVARCHAR(4000)) + '')
- änderungsblatt zu vgb b 10
- änderungsblatt zu vgb b 10e
- änderungsblatt zu vgb b 106
- for anlagen de energieversorgung
-
Strain induced corrosion cracking in fossil-fired power plants - ebookVGBE-TW-532e-ebookThis technical-scientific report focuses on strain induced corrosion cracking (SICC). This mechanism forms the transitional area between stress corrosion cracking and corrosion fatigue cracking. A distinction is important to be able to define effecti Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Strain induced corrosion cracking in fossil-fired power plants - PrintVGBE-TW-532eThis technical-scientific report focuses on strain induced corrosion cracking (SICC). This mechanism forms the transitional area between stress corrosion cracking and corrosion fatigue cracking. A distinction is important to be able to define effecti Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Particularities of Fire Protection of Waste to Energy Plants - PrintVGB-S-217-00-2012-11-ENWith this VGB-Standard options are demonstrated to reduce fire hazards by constructional means and to respond to them by appropriate procedures, to detect a fire that has already started as soon as possible, and to fight the fire effectively taking i Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Particularities of Fire Protection of Waste to Energy Plants - ebookVGB-S-217-00-2012-11-EN-ebookWith this VGB-Standard options are demonstrated to reduce fire hazards by constructional means and to respond to them by appropriate procedures, to detect a fire that has already started as soon as possible, and to fight the fire effectively taking i Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Availability of Power Plants 2013 – 2022, Edition 2023 (KISSY database evaluation) - ebookVGBE-TW-103Ve-2023-ebookSince 1970 vgbe/VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2023) presents the analysis about availability and u Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Availability of Power Plants 2014 – 2023, Edition 2024 (KISSY database evaluation) - ebookVGBE-TW-103Ve-2024-ebookSince 1970 vgbe/VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2024) presents the analysis about availability and u Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Zentrale Zuverlässigkeits- und Ereignisdatenbank - Mathematical Review of ZEDB Two-Stage Bayesian Model - ebookVGB-TW802e-ebookVorwort des Herausgebers VGB PowerTech hat eine zentrale Zuverlässigkeits- und Ereignisdatenbank (ZEDB) eingerichtet, in der die Betriebserfahrungen der deutschen Kernkraftwerke, der niederländischen Anlage Borssele und des Kernkraftwerks Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Failures and Forced Unavailability of Power Plants (Henk C. Wels, print) - PrintB035Power plants are not functioning to the fullest 100 % of the time. Maintenance and inspection of some components require them to be off-line in time, however, this can be planned such that customers continue receiving power from the electrical grid, Mehr erfahren48,00 €51,36 € Inkl. MwSt.
-
Function-related Documentation of Power Plant Instrumentation and Control in Line with Operating Requirements - ebookR170Ce-ebookThe first edition of the Guideline “Function-related documentation of power plant instrumentation and control in line with operating requirements", original title "Richtlinie für die betriebsgerechte, funktionsbezogene Dokumentation der Kr Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Exclusion of foreign material ingress into opened systems/components of nuclear power plants - ebookVGB-S-120-00-2016-02-EN-ebookThe VGB-Standard VGB-S-120 lists measures which are conducive to maintaining cleanliness in the plant (in mechanical, electrical and chemical regards) during maintenance and modification work. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Werkstoffspezifikation für drucktragende Komponenten in fossil befeuerten Kraftwerken - Material specification for components under pressure in fossil-fired power plants - ebookVGB-S-109-00-2012-08-DE-EN-ebookDieser VGB-Standard gilt für die Dampfkesselbaugruppe und Rohrleitungen des Wasser-/Dampfkreislaufes. Sie soll zwischen Auftraggeber, Hersteller und Werkstoffhersteller bzw. -lieferant eindeutige Festlegungen für den Liefervertrag und f&uum Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Coal Handling in Power Plants - ebookM211e-ebookThe VGB Instruction Sheet “Coal Handling in Power Plants” contains a collection of experience and recommendations which was prepared to the best of our knowledge but cannot always completely reproduce the state of the art. It provides a s Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Fire Protection in Onshore Wind Turbines - ebookVGB-S-017-00-2018-09-EN-ebookFire-fighting operations by fire brigades in onshore wind turbines are almost impossible because of their height and resulting difficulty of accessing them. For this reason, fire prevention, early detection and early fighting of a fire, and the self- Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Fire Protection in Onshore Wind Turbines - PrintVGB-S-017-00-2018-09-ENFire-fighting operations by fire brigades in onshore wind turbines are almost impossible because of their height and resulting difficulty of accessing them. For this reason, fire prevention, early detection and early fighting of a fire, and the self- Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Fire and Explosion Protection in Biomass Power Plants - PrintVGB-S-018-00-2013-12-ENThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Fire and Explosion Protection in Biomass Power Plants - ebookVGB-S-018-00-2013-12-EN-ebookThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Process Quality in Power Engineering - PrintVGB-S-012-00-2016-02-ENIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Process Quality in Power Engineering - ebookVGB-S-012-00-2016-02-EN-ebookIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.