Determination of Measurement Uncertainty upon Acceptance and Control Measurements - ebookVGB-S-020-00-2017-12-EN-ebookThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Empfehlungen zur Verbesserung der H2-Sicherheit wasserstoffgekühlter Generatoren - PrintVGB-S-165-00-2014-07-DEDer VGB-Standard "Empfehlungen zur Verbesserung der H2-Sicherheit wasserstoffgekühlter Generatoren" hat das Ziel, Hinweise für das Planen, Errichten, Modernisieren und Betreiben von wasserstoffgekühlten Generatoren in Kraftwerksanlagen Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Empfehlungen zur Verbesserung der H2-Sicherheit wasserstoffgekühlter Generatoren - ebookVGB-S-165-00-2014-07-DE-ebookDer VGB-Standard "Empfehlungen zur Verbesserung der H2-Sicherheit wasserstoffgekühlter Generatoren" hat das Ziel, Hinweise für das Planen, Errichten, Modernisieren und Betreiben von wasserstoffgekühlten Generatoren in Kraftwerksanlagen Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Zentrale Zuverlässigkeits- und Ereignisdatenbank - Zuverlässigkeitskenngrößen für Kernkraftwerkskomponenten (2015, Stand: 2014-12) - ebookTW805-15-ebookDie Zentrale Zuverlässigkeits- und Ereignisdatenbank (ZEDB) stellt Zuverlässigkeitsdaten für die probabilistischen Sicherheitsanalysen (PSA) bereit, die die Betreiber von Kernkraftwerke durchführen bzw. fortschreiben. In dieser Da Mehr erfahren999,00 €1.068,93 € Inkl. MwSt.
-
Centralized Reliability and Events Database – Reliability Data for Nuclear Power Plant Components (editions 2007-2011) - ebookTW805e-07-12-ebookThe Centralized Reliability and Events Database (ZEDB1) provides reliability data that can be used in ongoing and future probabilistic safety analyses (PSAs) conducted by the owners/operators of nuclear power plants contributing to the database. (Thi Mehr erfahren999,00 €1.068,93 € Inkl. MwSt.
-
Umsetzung des Alterungsmanagements in der Bautechnik nach KTA 1403 - PrintVGB-S-024-00-2014-01-DEDie Regel KTA 1403 „Alterungsmanagement in Kernkraftwerken“ in der Fassung von November 2010 regelt grundlegend, wie die Betreiber ein Alterungsmanagement durchzuführen haben. Dieser VGB-Standard ermöglicht ein einheitliches Vor Mehr erfahren65,00 €69,55 € Inkl. MwSt.
-
Umsetzung des Alterungsmanagements in der Bautechnik nach KTA 1403 - ebookVGB-S-024-00-2014-01-DE-ebookDie Regel KTA 1403 „Alterungsmanagement in Kernkraftwerken“ in der Fassung von November 2010 regelt grundlegend, wie die Betreiber ein Alterungsmanagement durchzuführen haben. Dieser VGB-Standard ermöglicht ein einheitliches Vor Mehr erfahren65,00 €69,55 € Inkl. MwSt.
-
Empfehlungen zum Management der funktionalen Sicherheit in Dampfkesselanlagen und Anlagen des Wasser-Dampf-Kreislaufs - 2. überarbeitete Ausgabe 2020 - ebookVGB-S-008-00-2020-11-DE-ebookDer VGB-Standard wendet sich sowohl an Betreiber von thermischen Kraftwerken wie auch an Hersteller und soll eine Hilfestellung zur Anwendung der Normen zur funktionalen Sicherheit geben. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
9 % to 12 % Cr Steels - Design, Manufacture, Fabrication and Safety Concepts - PrintVGBE-TW-531eThe aim of this report is to summarize the current state of knowledge in Germany on the quality-compliant production, processing, and design of the now established 9 % to 12 % Cr steel grades used in the energy and process industry and their applicat Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
9 % to 12 % Cr Steels - Design, Manufacture, Fabrication and Safety Concepts - ebookVGBE-TW-531e-ebookThe aim of this report is to summarize the current state of knowledge in Germany on the quality-compliant production, processing, and design of the now established 9 % to 12 % Cr steel grades used in the energy and process industry and their applicat Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an luftgekühlten Kondensatoren unter Vakuum - PrintVGB-S-131-00-2017-07-DEDer VGB-Standard VGB-S-131 stellt einheitliche Grundlagen für die Durchführung von Abnahme und Betriebsversuchen an luftgekühlten Kondensatoren für Wasserdampf dar. Sie beschränkt sich auf den Kondensator und schließt d Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an luftgekühlten Kondensatoren unter Vakuum - ebookVGB-S-131-00-2017-07-DE-ebookDer VGB-Standard VGB-S-131 stellt einheitliche Grundlagen für die Durchführung von Abnahme und Betriebsversuchen an luftgekühlten Kondensatoren für Wasserdampf dar. Sie beschränkt sich auf den Kondensator und schließt d Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - PrintVGB-S-131-00-2017-07-ENThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - ebookVGB-S-131-00-2017-07-EN-ebookThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Leitfaden zum Thema „Pre-Job Briefing“ und „Post-Job Debriefing“ - PrintVGB-S-123-00-2017-06-DEDas Pre-Job-Briefing und das Post-Job-Debriefing sind gezielt auf eine jeweilige Tätigkeit bezogene Besprechungen. Das Pre-Job Briefing (PJB) wird unmittelbar vor der Durchführung von komplexen oder nicht routinemäßigen Täti Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Leitfaden zum Thema „Pre-Job Briefing“ und „Post-Job Debriefing“ - ebookVGB-S-123-00-2017-06-DE-ebookDas Pre-Job-Briefing und das Post-Job-Debriefing sind gezielt auf eine jeweilige Tätigkeit bezogene Besprechungen. Das Pre-Job Briefing (PJB) wird unmittelbar vor der Durchführung von komplexen oder nicht routinemäßigen Täti Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Konformitätsbewertung im Kraftwerksbau - ebookVGB-S-035-00-2014-12-DE-ebookZiel des VGB-Standards VGB-S-035-00-2014-12-DE "Konformitätsbewertung im Kraftwerksbau" ist es, den Arbeitgebern bei der Bereitstellung von sicheren Arbeitsmitteln einen Orientierungsrahmen zu geben, welche konkreten gesetzlichen Vorgaben einzuh Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Konformitätsbewertung im Kraftwerksbau - PrintVGB-S-035-00-2014-12-DEZiel des VGB-Standards VGB-S-035-00-2014-12-DE "Konformitätsbewertung im Kraftwerksbau" ist es, den Arbeitgebern bei der Bereitstellung von sicheren Arbeitsmitteln einen Orientierungsrahmen zu geben, welche konkreten gesetzlichen Vorgaben einzuh Mehr erfahren200,00 €214,00 € Inkl. MwSt.