Back to Top
- Verwandte Suchbegriffe
- for de planung von kühltürmen
- for kraftwerke
- formelsammlung fur de kraftwerksmeister
- for anlagen de energieversorgung
- for de betriebsgerechte funktionsbezogene dokumentation
-
Quality Assurance in the Manufacture of Generators - PrintVGB-S-166-00-2014-02-ENThis VGB-Standard is intended to assist purchasers and operators of generators to assure the quality of the generator and its auxiliary systems and components during the manufacturing phase. It sets out the VGB requirements for quality. Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Quality Assurance in the Manufacture of Generators - ebookVGB-S-166-00-2014-02-EN-ebookThis VGB-Standard is intended to assist purchasers and operators of generators to assure the quality of the generator and its auxiliary systems and components during the manufacturing phase. It sets out the VGB requirements for quality. Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Process Quality in Power Engineering - PrintVGB-S-012-00-2016-02-ENIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - PrintVGB-S-042-00-2018-01-ENThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - ebookVGB-S-042-00-2018-01-EN-ebookThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Process Quality in Power Engineering - ebookVGB-S-012-00-2016-02-EN-ebookIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Prequalification of Partner Companies for High-Quality Maintenance - PrintVGB-S-040-00-2017-03-ENThis VGB-Standard for the prequalification of external/partner companies serves to ensure the quality expected or demanded by the client. The market situation forces the contractors (manufacturers and fabricators) to offer their products and service Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Werkstoffspezifikation für drucktragende Komponenten in fossil befeuerten Kraftwerken - Material specification for components under pressure in fossil-fired power plants - ebookVGB-S-109-00-2012-08-DE-EN-ebookDieser VGB-Standard gilt für die Dampfkesselbaugruppe und Rohrleitungen des Wasser-/Dampfkreislaufes. Sie soll zwischen Auftraggeber, Hersteller und Werkstoffhersteller bzw. -lieferant eindeutige Festlegungen für den Liefervertrag und f&uum Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Turbine internal drains - PrintVGB-S-016-00-2014-08-ENThe VGB-Standard VGB-S-016-00-2014-08-EN is to give an overview of how the drains system should be designed for all types and sizes of steam turbines. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Fire Protection in Power Plants - ebookR108e-ebookThe VGB-Guideline R108e aim to form a foundation that operators can use to compile their own fire protection strategies, tailored to suit the particular plant in question. For this reason, a number of suitable steps are given as examples. Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Recommendations for the improvement of H2 safety at hydrogen-cooled generators - PrintVGB-S-165-00-2014-07-ENThe aim of these recommendations for improving H2 safety is to provide information for designing, constructing, modernising/refurbishing and operating hydrogen-cooled generators in power plants. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - PrintVGB-S-133-00-2018-07-ENServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - ebookVGB-S-133-00-2018-07-EN-ebookServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - ebookVGB-S-026-00-2013-04-EN-ebookThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - PrintVGB-S-026-00-2013-04-ENThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Recommendations for Design and Properties of Waste-fuelled Steam Generators - Second Edition 2009 - ebookM216e-ebookWe expect that this second edition of the Instruction sheet, which is now entitled 'Recom-mendations for Design and Warranties of Waste-fuelled Steam Generators' will not only be beneficial for the purchasers but also for the suppliers of waste incin Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 41: Power to Gas - Application Guideline Part 41: Power to Gas - PrintVGB-S-823-41-2018-07-EN-DEDiese RDS-PP®-Anwendungsrichtlinie für Power to Gas Anlagen wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. This RD Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 41: Power to Gas - Application Guideline Part 41: Power to Gas - ebookVGB-S-823-41-2018-07-EN-DE-ebookDiese RDS-PP®-Anwendungsrichtlinie für Power to Gas Anlagen wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. This RD Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - PrintVGB-S-044-00-2019-05-ENThe VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these re Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - ebookVGB-S-044-00-2019-05-EN-ebookThe VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these re Mehr erfahren240,00 €256,80 € Inkl. MwSt.