Civil Engineering in Nuclear Power Plants - ebookVGB-S-026-00-2013-04-EN-ebookThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - PrintVGB-S-026-00-2013-04-ENThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Guide for the Procurement of Steam Turbine Plants - PrintVGB-S-145-00-2015-11-ENThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Guide for the Procurement of Steam Turbine Plants - ebookVGB-S-145-00-2015-11-EN-ebookThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Guideline for the Inspection and Evaluation of In-Service Rotors and Casings of Steam and Gas Turbine Generator Sets - ebookR512e-ebookThe necessity of uniformly representing the inspection and evaluation of inservice components in due consideration of damage reported as well as the improvement of manufacturing technology and examination techniques led to the establishment of this g Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - ebookVGBE-S-455-00-2022-12-EN-ebookThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Application, design and quality assurance criteria for the use of fibre-reinforced plastics in power plant construction - PrintVGB-S-609-00-2016-03-ENThis VGB-Standard replaces the former VGB guideline VGB-R 609e, which had the same title and dates from 2003. Mehr erfahren220,00 €235,40 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - PrintVGBE-S-455-00-2022-12-ENThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Structural Design of Cooling Towers - PrintVGB-S-610-00-2019-10-ENThis VGB-Standard VGB-S-610, “Structural Design of Cooling Towers” constitutes the joint basis – together with VGB-R 135e and VGB-R 612e – for the civil engineering-related planning including design, construction and approval Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Structural Design of Cooling Towers - ebookVGB-S-610-00-2019-10-EN-ebookThis VGB-Standard VGB-S-610, “Structural Design of Cooling Towers” constitutes the joint basis – together with VGB-R 135e and VGB-R 612e – for the civil engineering-related planning including design, construction and approval Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - PrintVGB-S-033-00-2017-07-ENThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - ebookVGB-S-033-00-2017-07-EN-ebookThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Characterisation of Power Plant Coal - PrintVGB-S-210-00-2015-07-ENThe precursor of this Standard the VGB-Bulletin “Charakterisierung von Kraftwerkskohlen” (VGB-R 210; Characterisation of Power Plant Coals) appeared 12 years ago (2003). Some new developments, but, in particular, changed operating conditi Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - PrintVGB-S-169-11-2015-11-ENThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - ebookVGB-S-169-11-2015-11-EN-ebookThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Standard für die internen Rohrleitungen von Turbinenanlagen - ebookVGB-S-503-00-2017-06-DE-ebookMit der VGB-Richtlinie VGB-R-503 sind über eine längere Zeit Erfahrungen gesammelt worden, die in der vorliegenden Ausgabe des VGB-Standards VGB-S-503-00- 2017-06-DE Berücksichtigung gefunden haben. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Standard für die internen Rohrleitungen von Turbinenanlagen - PrintVGB-S-503-00-2017-06-DEMit der VGB-Richtlinie VGB-R-503 sind über eine längere Zeit Erfahrungen gesammelt worden, die in der vorliegenden Ausgabe des VGB-Standards VGB-S-503-00- 2017-06-DE Berücksichtigung gefunden haben. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Preservation of Power Plants - ebookVGB-S-116-00-2016-04-EN-ebookThe VGB-Standard VGB-S116 shall apply to plants for firing fossil fuels and plants for firing substitute fuels. This standard comprises all essential process systems which are to be considered during plant outage or shutdown and have to be preserved. Mehr erfahren450,00 €481,50 € Inkl. MwSt.
-
Preservation of Power Plants - PrintS-116-00-2016-04-ENThe VGB-Standard VGB-S116 shall apply to plants for firing fossil fuels and plants for firing substitute fuels. This standard comprises all essential process systems which are to be considered during plant outage or shutdown and have to be preserved. Mehr erfahren450,00 €481,50 € Inkl. MwSt.
-
Application of data reconciliation in accordance with VDI 2048 - PrintVGB-S-009-S-00;2012-03.ENData reconciliation is frequently discussed in connection with IT systems for optimization of technical processes in industry. Data reconciliation as set out in VDI 2048 is indeed an interesting and technically complex process with which the quality Mehr erfahren190,00 €203,30 € Inkl. MwSt.