Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - PrintVGB-S-131-00-2017-07-ENThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - ebookVGB-S-131-00-2017-07-EN-ebookThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Chimneys for Operation without Flue Gas Reheating after FGD - ebookM643e-ebookThe enactment of the amended version of the 13th Ordinance for the Implementation of the Federal Immission Control Act (13. BImSchV; Ordinance on Large Combustion and Gas Turbine Plants, [1]) in July 2004 effectively aligned the German ambient pollut Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Code of Practice for Lifecycle Management of Reinforced Concrete Cooling Towers in Power Plants - ebookR613e-ebookThis Guideline addresses the lifecycle management of reinforced concrete cooling towers. Lifecycle management comprises maintenance of the structure and measures to ensure the safety of a cooling tower. Effective lifecycle management must be preventi Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Equipment for Cleaning of Heat Transfer Surfaces in Steam Raising Plants - Operation, Maintenance and Expert Systems - PrintVGB-S-221-00-2014-06-ENVery substantial advances have been made over the last couple of years in the field of heat transfer surface cleaning which are included in the present revision of the Standard (cf. first edition). New methods like explosion cleaning are now included Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Preservation of Power Plants - PrintS-116-00-2016-04-ENThe VGB-Standard VGB-S116 shall apply to plants for firing fossil fuels and plants for firing substitute fuels. This standard comprises all essential process systems which are to be considered during plant outage or shutdown and have to be preserved. Mehr erfahren450,00 €481,50 € Inkl. MwSt.
-
Preservation of Power Plants - ebookVGB-S-116-00-2016-04-EN-ebookThe VGB-Standard VGB-S116 shall apply to plants for firing fossil fuels and plants for firing substitute fuels. This standard comprises all essential process systems which are to be considered during plant outage or shutdown and have to be preserved. Mehr erfahren450,00 €481,50 € Inkl. MwSt.
-
Refractory Lining in Fluidised Bed Combustion Plant - PrintVGB-S-219-00-2015-03-ENAdvice for Ordering, Design, Construction and Operation of Refractory Lining in Fluidised Bed Combustion Plant Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Measurement Systems - PrintVGB-S-170-43-2015-07-ENMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Measurement Systems - ebookVGB-S-170-43-2015-07-EN-ebookMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Type, Operation and Maintenance of Flue Gas Desulphurisation Plants (FGD) - PrintVGB-S-015-2011-ENThis VGB-Standard deals with flue gas desulphurisation (FGD) in large combustion plants. At this point, no additive processes, which can be employed in combustion, are considered. Here, only plants downstream of combustion are considered. The aim of Mehr erfahren160,00 €171,20 € Inkl. MwSt.
-
Type, Operation and Maintenance of Flue Gas Desulphurisation Plants (FGD) - ebookVGB-S-015-2011-EN-ebookThis VGB-Standard deals with flue gas desulphurisation (FGD) in large combustion plants. At this point, no additive processes, which can be employed in combustion, are considered. Here, only plants downstream of combustion are considered. The aim of Mehr erfahren160,00 €171,20 € Inkl. MwSt.
-
Guideline for the Testing of DeNOx-catalysts - ebookVGB-S-302-00-2013-04-EN-ebookThe purpose of this VGB-Standard is to manifest a testing procedure, which can be employed by catalyst manufacturers, SCR equipment suppliers, power plant operatorsand independent testing institutions for determining the characteristics of SCR c Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Guideline for Design and Purchase of Spring Elements for Machine Foundations - ebookR603e-ebookThis guideline applies to spring elements for foundations in accordance with: - DIN 4024-1 Machine foundations; flexible structures that support machines with rotating elements - DIN 4024-2 Machine foundations; rigid foundations for machinery Mehr erfahren40,00 €42,80 € Inkl. MwSt.
-
Electrical Generating Unit Protection - 1st revised edition - PrintVGB-S-162-00-2020-02-ENFive years after the first publication and based on the initiative of the VGB technical group “Electrical Equipment”, the necessity of a revision to the VGB Standards “Electrical Unit Protection” (VGB-SO25) was discussed. As a Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Electrical Generating Unit Protection - 1st revised edition - ebookVGB-S-162-00-2020-02-EN-ebookFive years after the first publication and based on the initiative of the VGB technical group “Electrical Equipment”, the necessity of a revision to the VGB Standards “Electrical Unit Protection” (VGB-SO25) was discussed. As a Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
RDS-PP® Reference Designation System for Power Plants - Letter Code for Power Plant Systems (System Key / ENGLISH) - PrintVGB-S-821-00-2016-06-ENThe basic international standards for reference designation provide users with generally applicable general rules and letter codes for main classes for the designation of technical objects and their documentation. The standard for power plants estab Mehr erfahren680,00 €727,60 € Inkl. MwSt.
-
RDS-PP® Reference Designation System for Power Plants - Letter Code for Power Plant Systems (System Key) - Excel-table (English edition)RDS-PP-EXCEL-ENThe basic international standards for reference designation provide users with gen-erally applicable general rules and letter codes for main classes for the designation of technical objects and their documentation. The standard for power plants esta Mehr erfahren2.950,00 €3.156,50 € Inkl. MwSt.
-
IT Security for Generating Plants - PrintVGB-S-175-00-2014-04-ENThe present VGB Standard S-175 explains fundamental concepts and compiles the threats and the security requirements derived from them in a structured and clear manner. In addition, recommendations for actions regarding the individual requirements hav Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
IT Security for Generating Plants - ebookVGB-S-175-00-2014-04-EN-ebookThe present VGB Standard S-175 explains fundamental concepts and compiles the threats and the security requirements derived from them in a structured and clear manner. In addition, recommendations for actions regarding the individual requirements hav Mehr erfahren280,00 €299,60 € Inkl. MwSt.