Back to Top
- Verwandte Suchbegriffe
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2:
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2
- VGB-R 108e Fire Protection in Power Plants %E2%80%93 2011 978-3-86875-544-2
- vgb r 10 anhang 3
- vgb r 10 anlag 3
-
Part A: In-service monitoring of turbine oils in steam and gas turbines / Part B: In-service monitoring of fire-resistant fluids for steam and gas turbines - PrintVGB-S-416-00-2014-08-ENPart A describes effective in-service monitoring of oils in turbines. Due to thermal, chemical, physical and mechanical impacts, turbine oils are subject to change during operation. These changes normally lead to a deterioration in the oil characteri Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - PrintVGB-S-033-00-2017-07-ENThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Indication and Application of Actions on Buildings in Power Plants - PrintVGB-S-602-00-2016-04-ENThe aim of this VGB standard is to provide a consistent procedure for the definition, classification and processing of actions on load-bearing structures for the construc-tion of power plants. It is also intended to cover significant influences of op Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Equipment for Cleaning of Heat Transfer Surfaces in Steam Raising Plants - Operation, Maintenance and Expert Systems - PrintVGB-S-221-00-2014-06-ENVery substantial advances have been made over the last couple of years in the field of heat transfer surface cleaning which are included in the present revision of the Standard (cf. first edition). New methods like explosion cleaning are now included Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Maintenance-compatible documentation - PrintVGB-S-029-S-00;2012-03-ENMaintenance of conventional power generation facilities is increasingly required to meet demands for maximum cost-effectiveness together, wherever possible, with rising quality. The industrial health and safety regulations require operators to take o Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Condition Monitoring and Inspection of Components of Steam Boiler Plants, Pressure Vessel Installations and Water- or Steam-Pipes in Thermal Power Plants - 3rd edition 2019 - PrintVGB-S-506-00-2019-02-ENThis VGB Standard describes possibilities and methods for condition monitoring and performance of tests and inspections in due consideration of hazards especially arising from steam and pressure in components of steam boiler plants, pressure vessel i Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - PrintVGB-S-131-00-2017-07-ENThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Guideline for the Testing of DeNOx-catalysts - PrintVGB-S-302-00-2013-04-ENThe purpose of this VGB-Standard is to manifest a testing procedure, which can be employed by catalyst manufacturers, SCR equipment suppliers, power plant operatorsand independent testing institutions for determining the characteristics of SCR c Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - PrintVGB-S-130-00-2017-07-ENMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Prequalification of Partner Companies for High-Quality Maintenance - PrintVGB-S-040-00-2017-03-ENThis VGB-Standard for the prequalification of external/partner companies serves to ensure the quality expected or demanded by the client. The market situation forces the contractors (manufacturers and fabricators) to offer their products and service Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - PrintVGB-S-014-2011-ENAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Process Quality in Power Engineering - PrintVGB-S-012-00-2016-02-ENIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - PrintVGB-S-133-00-2018-07-ENServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Fire Protection in Onshore Wind Turbines - PrintVGB-S-017-00-2018-09-ENFire-fighting operations by fire brigades in onshore wind turbines are almost impossible because of their height and resulting difficulty of accessing them. For this reason, fire prevention, early detection and early fighting of a fire, and the self- Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - PrintVGB-S-121-00-2016-04-ENMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.