Back to Top
- Verwandte Suchbegriffe
- Sammlung von VGB-Richtlinien und VGB-Empfehlungen für die Leittechnik - Abnahme- und Kontrolluntersuchungen - An- und Abfahrverl
- VGB-Empfehlungen für die Leittechnik - Band I.2 Abnahme- und Kontrolluntersuchungen
- Sammlung von VGB-Richtlinien und VGB-Empfehlungen für die Leittechnik - Band I.1: Meßtechnik - eBook
- Sammlung von VGB Richtlinien und VGB Empfehlungen für die Leittechnik
- die en 12 3
-
RDS-PP® Pocketbook, English, 2nd edition - PrintVGBE-S-821-91-2021-12-ENThe 2nd edition of the RDS-PP Pocketbook for conventional, nuclear, renewable energy plants, storage and power-2-x has been published as update VGBE-S-821-91-2021-09-EN.The 2019/11 additions to the system key are taken into account. The RDS-PP Pocket Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Industrial Chimneys - Evaluation of the Construction Methods, Notes on Design and Commissioning - ebookM642e-ebookThe VGB Instruction Sheet titled "Chimneys - Evaluation of the Construction Methods, Notes on Design and Commissioning", first edition, 1990, has assisted operators, designers and suppliers in the field of processes and design by conveying a wide ran Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Recommendations for the improvement of H2 safety at hydrogen-cooled generators - PrintVGB-S-165-00-2014-07-ENThe aim of these recommendations for improving H2 safety is to provide information for designing, constructing, modernising/refurbishing and operating hydrogen-cooled generators in power plants. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Code of Practice for Lifecycle Management of Reinforced Concrete Cooling Towers in Power Plants - ebookR613e-ebookThis Guideline addresses the lifecycle management of reinforced concrete cooling towers. Lifecycle management comprises maintenance of the structure and measures to ensure the safety of a cooling tower. Effective lifecycle management must be preventi Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Tubes for Condensers and Other Heat Exchangers (Part C “Titanium”) - ebookR114e-ebookThe guidelines are intended to provide information to the operating company of combined heat and thermal power plants so that they can order the correct piping for condensers and heat exchangers and also to help them prevent faults and damage. To all Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Prequalification of Partner Companies for High-Quality Maintenance - PrintVGB-S-040-00-2017-03-ENThis VGB-Standard for the prequalification of external/partner companies serves to ensure the quality expected or demanded by the client. The market situation forces the contractors (manufacturers and fabricators) to offer their products and service Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Refractory Lining in Fluidised Bed Combustion Plant - PrintVGB-S-219-00-2015-03-ENAdvice for Ordering, Design, Construction and Operation of Refractory Lining in Fluidised Bed Combustion Plant Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Basic Terms of the Electric Utility Industry, 11th edition, free of charge - ebookVGB-S-002-01-2019-05-EN-ebookAs a result of the now almost global energy transition and the associated requirements for the ever-increasing regulation of the markets while securing competition, the number of terms used and their definitions continues to increase. In&nb Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Corrosion Protection for Offshore Wind Structures - Part 1 to Part 3 (2023), and Part 4 (2018) [free of charge] - ebookVGBE-S-021-XX-YYYY-MM-EN-ebookCorrosion Protection for Offshore Wind Structures - Part 1: General. Part 2: Requirements for Corrosion Protection Systems. Part 3: Application of Coating Systems. Part 4: Cathodic Protection (CP) Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Fire Protection in Onshore Wind Turbines - PrintVGB-S-017-00-2018-09-ENFire-fighting operations by fire brigades in onshore wind turbines are almost impossible because of their height and resulting difficulty of accessing them. For this reason, fire prevention, early detection and early fighting of a fire, and the self- Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Gas distributor plates in fluidized bed systems - ebookM218e-ebookSince about 1985, fluidized bed combustion (FBC) has greatly extended the possibilities for operating power plants on the basis of solid fuels economically and in an environmentally acceptable manner. In addition to the system-inherent possibilities Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - PrintVGB-S-014-2011-ENAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - ebookVGB-S-014-2011-EN-ebookAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Application of data reconciliation in accordance with VDI 2048 - PrintVGB-S-009-S-00;2012-03.ENData reconciliation is frequently discussed in connection with IT systems for optimization of technical processes in industry. Data reconciliation as set out in VDI 2048 is indeed an interesting and technically complex process with which the quality Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Application of data reconciliation in accordance with VDI 2048 - ebookVGB-S-009-S-00;2012-03.EN-ebookData reconciliation is frequently discussed in connection with IT systems for optimization of technical processes in industry. Data reconciliation as set out in VDI 2048 is indeed an interesting and technically complex process with which the quality Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - PrintVGB-S-020-00-2017-12-ENThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - ebookVGB-S-020-00-2017-12-EN-ebookThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - ebookVGB-S-026-00-2013-04-EN-ebookThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - PrintVGB-S-026-00-2013-04-ENThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.