Back to Top
- Alternative Suchbegriffe
- vgb s 12 00 2023 04 de ebook
- vgb s 12 00 2012 04 de ebook
- Verwandte Suchbegriffe
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2 englisch
- vgb r 10 anhang 3
- vgb r 11e anhang 3
- vgb r 12e anlag 3
- vgb r 135 anlag 3
-
Fire and Explosion Protection in Biomass Power Plants - PrintVGB-S-018-00-2013-12-ENThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - PrintVGB-S-042-00-2018-01-ENThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Refractory Lining in Fluidised Bed Combustion Plant - PrintVGB-S-219-00-2015-03-ENAdvice for Ordering, Design, Construction and Operation of Refractory Lining in Fluidised Bed Combustion Plant Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Implementation guideline for motors and variable-speed power drive systems - PrintVGB-S-168-00-2013-12-ENThe aim of this VGB Standard is to provide an effective aid to the parties involved in the planning and specification of motors and variable-speed power drive systems (especially design engineers, operators and manufacturers) by means of extensive ha Mehr erfahren250,00 €267,50 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - PrintVGB-S-504-00-2015-12-ENSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Feuerfeste Auskleidung von Wirbelschichtanlagen - PrintVGB-S-219-00-2015-03-DEHinweise zur Bestellung, Planung, Bau und Betrieb feuerfester Auskleidungen in Wirbelschichtfeuerungen Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Application, design and quality assurance criteria for the use of fibre-reinforced plastics in power plant construction - ebookVGB-S-609-00-2016-03-EN-ebookThis VGB-Standard replaces the former VGB guideline VGB-R 609e, which had the same title and dates from 2003. Mehr erfahren220,00 €235,40 € Inkl. MwSt.
-
Heat exchangers and boilers in the steam-water cycle of thermal power plants - ebookVGB-S-110-R-00;2012-07.EN-ebookThis VGB standard is intended to enhance the service performance (equipment availability) of heat exchangers and boilers in the water/steam cycle of thermal power stations. The VGB standard consists of a general section for the order and a technical Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Process Quality in Power Engineering - ebookVGB-S-012-00-2016-02-EN-ebookIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - ebookVGB-S-130-00-2017-07-EN-ebookMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Application of data reconciliation in accordance with VDI 2048 - ebookVGB-S-009-S-00;2012-03.EN-ebookData reconciliation is frequently discussed in connection with IT systems for optimization of technical processes in industry. Data reconciliation as set out in VDI 2048 is indeed an interesting and technically complex process with which the quality Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Type, Operation and Maintenance of Flue Gas Desulphurisation Plants (FGD) - ebookVGB-S-015-2011-EN-ebookThis VGB-Standard deals with flue gas desulphurisation (FGD) in large combustion plants. At this point, no additive processes, which can be employed in combustion, are considered. Here, only plants downstream of combustion are considered. The aim of Mehr erfahren160,00 €171,20 € Inkl. MwSt.
-
Überwachungs-, Begrenzungs- und Schutzeinrichtungen an Dampfturbinenanlagen - PrintVGB-S-103-00-2020-02-DEDieser Standard richtet sich an Hersteller, Service-Dienstleister und Betreiber von Dampfturbinenanlagen und soll insbesondere dem Betreiber als Hilfsmittel zur Ausstattung seiner Dampfturbinenanlagen dienen. Der sichere Betrieb von Dampfturbinen st Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Lehrgangsempfehlung für die Weiterbildung zum/zur Geprüften Kraftwerker/Kraftwerkerin - PrintVGB-S-037-00-2015-09-DEIn der heutigen Zeit erwarten wir von dem Kraftwerker Fähigkeiten und Fertigkeiten in einem sehr breiten und heterogenen Handlungsspektrum. Der Rahmenstoffplan beinhaltet nicht nur die altbekannten „harten" technischen Kenntnisse sondern a Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Maintenance-compatible documentation - ebookVGB-S-029-S-00;2012-03-EN-ebookMaintenance of conventional power generation facilities is increasingly required to meet demands for maximum cost-effectiveness together, wherever possible, with rising quality. The industrial health and safety regulations require operators to take o Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
BTR - Bautechnik bei Kühltürmen - PrintVGB-S-610-00-2019-10-DEDer vorliegende VGB-Standard stellt – gemeinsam mit der VGB-R 135 und der VGB-R 612 – eine vereinheitlichende Grundlage für die bautechnische Entwurfs-, Genehmigungs- und Ausführungsplanung sowie für die Bauausführung Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Umsetzung des Alterungsmanagements in der Bautechnik nach KTA 1403 - PrintVGB-S-024-00-2014-01-DEDie Regel KTA 1403 „Alterungsmanagement in Kernkraftwerken“ in der Fassung von November 2010 regelt grundlegend, wie die Betreiber ein Alterungsmanagement durchzuführen haben. Dieser VGB-Standard ermöglicht ein einheitliches Vor Mehr erfahren65,00 €69,55 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - ebookVGB-S-115-00-2016-01-EN-ebookThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Basic Terms of the Electric Utility Industry, 11th edition, free of charge - ebookVGB-S-002-01-2019-05-EN-ebookAs a result of the now almost global energy transition and the associated requirements for the ever-increasing regulation of the markets while securing competition, the number of terms used and their definitions continues to increase. In&nb Mehr erfahren0,00 €0,00 € Inkl. MwSt.