Back to Top
- Alternative Suchbegriffe
- ausleg inhalt und formatvorgaben for de vgb standards
- Verwandte Suchbegriffe
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2:
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2
- VGB-R 108e Fire Protection in Power Plants %E2%80%93 2011 978-3-86875-544-2
- vgb r 10 anhang 3
- vgb r 10 anlag 3
-
Part A: In-service monitoring of turbine oils in steam and gas turbines / Part B: In-service monitoring of fire-resistant fluids for steam and gas turbines - PrintVGB-S-416-00-2014-08-ENPart A describes effective in-service monitoring of oils in turbines. Due to thermal, chemical, physical and mechanical impacts, turbine oils are subject to change during operation. These changes normally lead to a deterioration in the oil characteri Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Gas distributor plates in fluidized bed systems - ebookM218e-ebookSince about 1985, fluidized bed combustion (FBC) has greatly extended the possibilities for operating power plants on the basis of solid fuels economically and in an environmentally acceptable manner. In addition to the system-inherent possibilities Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - PrintVGB-S-131-00-2017-07-ENThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - ebookVGB-S-131-00-2017-07-EN-ebookThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - PrintVGB-S-020-00-2017-12-ENThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - ebookVGB-S-020-00-2017-12-EN-ebookThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - PrintVGB-S-130-00-2017-07-ENMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - ebookVGB-S-130-00-2017-07-EN-ebookMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Fire Protection in Onshore Wind Turbines - ebookVGB-S-017-00-2018-09-EN-ebookFire-fighting operations by fire brigades in onshore wind turbines are almost impossible because of their height and resulting difficulty of accessing them. For this reason, fire prevention, early detection and early fighting of a fire, and the self- Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Organic Matter and Dissolved Carbon Dioxide in the Steam Water Circuit of Power Plant - ebookM418e-ebookAlthough no overwhelming evidence exists, organic acids and carbon dioxide have nevertheless been implicated as contributors to corrosion problems within the steam-water circuit. A dedicated group of international scientists, power plant chemists and Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Fire Protection in Onshore Wind Turbines - PrintVGB-S-017-00-2018-09-ENFire-fighting operations by fire brigades in onshore wind turbines are almost impossible because of their height and resulting difficulty of accessing them. For this reason, fire prevention, early detection and early fighting of a fire, and the self- Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Particularities of Fire Protection of Waste to Energy Plants - PrintVGB-S-217-00-2012-11-ENWith this VGB-Standard options are demonstrated to reduce fire hazards by constructional means and to respond to them by appropriate procedures, to detect a fire that has already started as soon as possible, and to fight the fire effectively taking i Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Particularities of Fire Protection of Waste to Energy Plants - ebookVGB-S-217-00-2012-11-EN-ebookWith this VGB-Standard options are demonstrated to reduce fire hazards by constructional means and to respond to them by appropriate procedures, to detect a fire that has already started as soon as possible, and to fight the fire effectively taking i Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Messstellenliste für Abnahmeuntersuchungen mit Datenerfassungsanlagen - PrintVGB-S-150-22-2020-10-DEDer vorliegende VGB-Standard VGB-S-150-22 „Messstellenliste für Abnahmeuntersuchungen mit Datenerfassungsanlagen“ wurde durch ein Team der VGBFachgruppe „Abnahmetests und Kontrolluntersuchen“ bearbeitet. Er stellt die Wei Mehr erfahren90,00 €96,30 € Inkl. MwSt.
-
Messstellenliste für Abnahmeuntersuchungen mit Datenerfassungsanlagen - ebookVGB-S-150-22-2020-10-DE-ebookDer vorliegende VGB-Standard VGB-S-150-22 „Messstellenliste für Abnahmeuntersuchungen mit Datenerfassungsanlagen“ wurde durch ein Team der VGBFachgruppe „Abnahmetests und Kontrolluntersuchen“ bearbeitet. Er stellt die Wei Mehr erfahren90,00 €96,30 € Inkl. MwSt.
-
Analysis of FGD Gypsum - ebookM701e-ebookThe first edition of the instruction sheet “Analysis of FGD gypsum” was elaborated and published by the joint Working Group of the "Bundesverbandes der Gipsindustrie e.V." and VGB PowerTech e.V. to assure a high quality of FDG gypsum in c Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Kühlwassersysteme und Kühlwasserbehandlung - ebookVGBE-S-455-00-2022-12-DE-ebookDer vorliegende vgbe-Standard „Kühlwassersysteme und Kühlwasserbehandlung“, VGBE-S-455-00-2022-12-DE, ersetzt die bisherige VGB-Kühlwasserrichtlinie VGB-R 455, die in der zweiten Ausgabe im Januar 2000 erschienen war. Dies Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Elektrischer Blockschutz - PrintVGB-S-162-00-2020-02-DE5 Jahre nach der Erstveröffentlichung wurde auf Initiative der VGB-Fachgruppe „Elektrische Maschinen und Anlagen“ in einem Fachgespräch der Überarbeitungsbedarf des VGB-Standards „Elektrischer Blockschutz“ (VGB- Mehr erfahren270,00 €288,90 € Inkl. MwSt.