Back to Top
- Verwandte Suchbegriffe
- powertech guideline vgb b003
- powertech guideline vgb b105
- plants fur de mann kauf
- plant fur de mann kaufer
- plants fur de matt kaufer
-
Recommendations for the Inspection and Overhaul of Steam Turbines - PrintVGB-S-115-00-2016-01-ENThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - ebookVGB-S-115-00-2016-01-EN-ebookThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the improvement of H2 safety at hydrogen-cooled generators - PrintVGB-S-165-00-2014-07-ENThe aim of these recommendations for improving H2 safety is to provide information for designing, constructing, modernising/refurbishing and operating hydrogen-cooled generators in power plants. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - PrintVGB-S-020-00-2017-12-ENThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - ebookVGB-S-020-00-2017-12-EN-ebookThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - PrintVGB-S-033-00-2017-07-ENThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - ebookVGB-S-033-00-2017-07-EN-ebookThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Measures for the avoidance and handling of instrumentation and control equipment failures - ebookVGB-S-170-12-2018-08-EN-ebookThe former VGB Guideline VGB-R 170 A1e “Measures for the avoidance and handling of instrumentation and control equipment failures” was used since 2005 for the support during the specification and assessment of control and instrumentation Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - PrintVGB-S-133-00-2018-07-ENServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - ebookVGB-S-133-00-2018-07-EN-ebookServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Structural Design of Cooling Towers - PrintVGB-S-610-00-2019-10-ENThis VGB-Standard VGB-S-610, “Structural Design of Cooling Towers” constitutes the joint basis – together with VGB-R 135e and VGB-R 612e – for the civil engineering-related planning including design, construction and approval Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Structural Design of Cooling Towers - ebookVGB-S-610-00-2019-10-EN-ebookThis VGB-Standard VGB-S-610, “Structural Design of Cooling Towers” constitutes the joint basis – together with VGB-R 135e and VGB-R 612e – for the civil engineering-related planning including design, construction and approval Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
KKS Pocketbook, Deutsch, 4. Auflage - PrintVGBE-S-811-91-2021-12-DE - VGB-B-105-007.4Das KKS-Pocketbook (KKS - Kraftwerk-Kennzeichensystem) für konventionelle, nukleare und erneuerbare Energieanlagen sowie Speicher und Power-2-X ist in 4. Auflage als Aktualisierung VGBE-S-811-91-2021-12-DE erschienen. Berücksichtigt sind di Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
RDS-PP® Pocketbook, Deutsch, 2. Auflage - PrintVGBE-S-821-91-2021-12-DEDas RDS-PP® Pocketbook für konventionelle, nukleare und erneuerbare Energieanlagen sowie Speicher und Power-2-X ist in 2. Auflage als Aktualisierung VGBE-S-821-91-2021-12-DE erschienen.Berücksichtigt sind die Ergänzungen 2019/11 zu Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Basic Terms of the Electric Utility Industry, 11th edition, free of charge - ebookVGB-S-002-01-2019-05-EN-ebookAs a result of the now almost global energy transition and the associated requirements for the ever-increasing regulation of the markets while securing competition, the number of terms used and their definitions continues to increase. In&nb Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Lieferung der Technischen Dokumentation (Technische Anlagendaten, Dokumente) für Anlagen der Energieversorgung - ebookVGB-S-831-00-2015-05-DE-ebookErsetzt durch mehrteilige Serie VGBE-S-831; weiterhin lieferbar für Bestandspflge. Der VGB-Standard gilt für die gesamte Technische Dokumentation (Technische Anlagendaten, Dokumente), die bei der Abwicklung von Projekten (Planung, Errichtung und I Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Lieferung der Technischen Dokumentation (Technische Anlagendaten, Dokumente) für Anlagen der Energieversorgung - PrintVGB-S-831-00-2015-05-DEErsetzt durch mehrteilige Serie VGBE-S-831; weiterhin lieferbar für Bestandspflge. Der VGB-Standard gilt für die gesamte Technische Dokumentation (Technische Anlagendaten, Dokumente), die bei der Abwicklung von Projekten (Planung, Errichtung und I Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Technische und kommerzielle Kennzahlen für Kraftwerksanlagen - 9. Ausgabe 2019, kostenlos - ebookVGB-S-002-03-2019-10-DE-ebookDer VGB-Standard ermöglicht dem Anwender eine technische und wirtschaftliche Beurteilung von Kraftwerksanlagen. Zudem kann mithilfe des VGB-Standards die Wirkung von Preiseffekten und den gesetzlichen Vorgaben auf den Kraftwerksbetrieb analysier Mehr erfahren0,00 €0,00 € Inkl. MwSt.