Back to Top
- Alternative Suchbegriffe
- heat 3 grundlagen und systematik de verfügbarkeitsermittlung for warmekraftwerken
- heat 3 grundlagen und systematik de verfügbarkeitsermittlung for warmekraftwerk
- Verwandte Suchbegriffe
- heat 3 grundlagen und systematik der verfügbarkeitsermittlung for wärmekraftwerke
- heat 3 grundlagen und systematik der verfügbarkeitsermittlung for warmekraftwerk
- heat 3 grundlagen und systematik der verfügbarkeitsermittlung for warmekraftwerken
- heat 3 grundlagen und systematik der verfügbarkeitsermittlung fur warmekraftwerken
- heat 3 grundlagen und systematik de verfügbarkeitsermittlung for warmekraftwerk
-
Prequalification of Partner Companies for High-Quality Maintenance - PrintVGB-S-040-00-2017-03-ENThis VGB-Standard for the prequalification of external/partner companies serves to ensure the quality expected or demanded by the client. The market situation forces the contractors (manufacturers and fabricators) to offer their products and service Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - PrintVGB-S-133-00-2018-07-ENServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - ebookVGB-S-133-00-2018-07-EN-ebookServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Concept of (recurrent) training for performance of non-routine activities in German NPPs - ebookVGB-S-043-00-2016-06-EN-ebookOn the basis of the established practices in German nuclear power plants, and making allowance from the VGB “Concept for the Implementation of Tools for Professional Conduct”, the WG has worked out the principles for such training (target Mehr erfahren150,00 €160,50 € Inkl. MwSt.
-
Measures for the avoidance and handling of instrumentation and control equipment failures - ebookVGB-S-170-12-2018-08-EN-ebookThe former VGB Guideline VGB-R 170 A1e “Measures for the avoidance and handling of instrumentation and control equipment failures” was used since 2005 for the support during the specification and assessment of control and instrumentation Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Speisewasser-, Kesselwasser- und Dampfqualität für Kraftwerke/Industriekraftwerke - PrintVGBE-S-010-00-2023-08-DEvgbe energy e.V. legt mit dem vgbe-Standard VGBE-S-010-00-2023-08-DE "Speisewasser-, Kesselwasser- und Dampfqualität für Kraftwerke/Industriekraftwerke" eine überarbeitete Fassung des vorherigen VGB-Standards VGB-S-010 (2011) vor. Er e Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
Speisewasser-, Kesselwasser- und Dampfqualität für Kraftwerke/Industriekraftwerke - ebookVGBE-S-010-00-2023-08-DE-ebookvgbe energy e.V. legt mit dem vgbe-Standard VGBE-S-010-00-2023-08-DE "Speisewasser-, Kesselwasser- und Dampfqualität für Kraftwerke/Industriekraftwerke" eine überarbeitete Fassung des vorherigen VGB-Standards VGB-S-010 (2011) vor. Er e Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
Guideline for the Testing of DeNOx-catalysts - PrintVGB-S-302-00-2013-04-ENThe purpose of this VGB-Standard is to manifest a testing procedure, which can be employed by catalyst manufacturers, SCR equipment suppliers, power plant operatorsand independent testing institutions for determining the characteristics of SCR c Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Implementation guideline for motors and variable-speed power drive systems - PrintVGB-S-168-00-2013-12-ENThe aim of this VGB Standard is to provide an effective aid to the parties involved in the planning and specification of motors and variable-speed power drive systems (especially design engineers, operators and manufacturers) by means of extensive ha Mehr erfahren250,00 €267,50 € Inkl. MwSt.
-
Implementation guideline for motors and variable-speed power drive systems - ebookVGB-S-168-00-2013-12-EN-ebookThe aim of this VGB Standard is to provide an effective aid to the parties involved in the planning and specification of motors and variable-speed power drive systems (especially design engineers, operators and manufacturers) by means of extensive ha Mehr erfahren250,00 €267,50 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - PrintVGB-S-115-00-2016-01-ENThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - ebookVGB-S-115-00-2016-01-EN-ebookThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
RDS-PP® Referenzkennzeichensystem für Kraftwerke - Kennbuchstaben für Kraftwerkssysteme (Systemschlüssel / DEUTSCH) - PrintVGB-S-821-00-2016-06-DEDie internationalen Grundnormen zur Referenzkennzeichnung bieten den Anwendern allgemeingültige Grundregeln und Kennbuchstaben für Hauptklassen zur Kennzeichnung von technischen Objekten und deren Dokumentation. Die Fachnorm für Kraft Mehr erfahren680,00 €727,60 € Inkl. MwSt.
-
RDS-PP® Referenzkennzeichensystem für Kraftwerke - Kennbuchstaben für Kraftwerkssysteme (Systemschlüssel / DEUTSCH) - ebookVGB-S-821-00-2016-06-DE-ebookDie internationalen Grundnormen zur Referenzkennzeichnung bieten den Anwendern allgemeingültige Grundregeln und Kennbuchstaben für Hauptklassen zur Kennzeichnung von technischen Objekten und deren Dokumentation. Die Fachnorm für Kraft Mehr erfahren680,00 €727,60 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - ebookVGB-S-831-00-2015-05-EN-ebookReplaced by multi-part publication VGBE-S-831; still available for existing installations. The Guideline applies to the entire technical documentation (technical plant data and documents) which is necessary in the performance of projects, e.g. in pl Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - PrintVGB-S-831-00-2015-05-ENReplaced by multi-part publication VGBE-S-831; still available for existing installations. The Guideline applies to the entire technical documentation (technical plant data and documents) which is necessary in the performance of projects, e.g. in pl Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Brennstoffmahlanlagen - PrintVGBE-S-213-00-2024-04-DEBesondere Beachtung bei der Planung einer Kesselanlage verdient die Brennstoffmahlanlage. Sie ist für die Betriebssicherheit entscheidend und bedarf sorgfältiger Wartung und laufender Instandhaltung. Der Standard VGBE-S-213-00-2024-04-DE ist eine A Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Brennstoffmahlanlagen - ebookVGBE-S-213-00-2024-04-DE-ebookBesondere Beachtung bei der Planung einer Kesselanlage verdient die Brennstoffmahlanlage. Sie ist für die Betriebssicherheit entscheidend und bedarf sorgfältiger Wartung und laufender Instandhaltung. Der Standard VGBE-S-213-00-2024-04-DE ist eine A Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
VGB-Standard for the Water in Nuclear Power Plants with Light-Water Reactors Part 1: PWR Part 2: BWR - ebookVGB-S-401-00-2020-05-EN-ebookAlmost half a century after publication of the first edition of a VGB-Guideline for the Water in Nuclear Power Plants with Light-Water Reactors and approx. 13 years after the third edition in 2006, the task of a renewed adaptation of the Guideline fo Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
VGB-Standard for the Water in Nuclear Power Plants with Light-Water Reactors Part 1: PWR Part 2: BWR - PrintVGB-S-401-00-2020-05-ENAlmost half a century after publication of the first edition of a VGB-Guideline for the Water in Nuclear Power Plants with Light-Water Reactors and approx. 13 years after the third edition in 2006, the task of a renewed adaptation of the Guideline fo Mehr erfahren270,00 €288,90 € Inkl. MwSt.