Back to Top
- Alternative Suchbegriffe
- de en 62271 2023 vdew 07 2021 2010 08
- de en 62271 2012 vdew 07 2021 2010 08
- Verwandte Suchbegriffe
- vdew 04 3 2010 03
- vdew 002 3 2012 03
- vdew 00 3 272 03
- vdew 00 3 22 03
- vdew 007 3 2012 03
-
RDS-PP® Reference Designation System for Power Plants - Letter Code for Power Plant Systems (System Key) - Excel-table (English edition)RDS-PP-EXCEL-ENThe basic international standards for reference designation provide users with gen-erally applicable general rules and letter codes for main classes for the designation of technical objects and their documentation. The standard for power plants esta Mehr erfahren2.950,00 €3.156,50 € Inkl. MwSt.
-
Structural Design of Cooling Towers - PrintVGB-S-610-00-2019-10-ENThis VGB-Standard VGB-S-610, “Structural Design of Cooling Towers” constitutes the joint basis – together with VGB-R 135e and VGB-R 612e – for the civil engineering-related planning including design, construction and approval Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Instandhaltungsempfehlungen für Transformatoren und Drosselspulen - PrintVGB-S-169-12-2021-01-DEAuf Initiative der VGB-Projektgruppe „Transformatoren“ wurde in einem Fachgespräch der Bedarf eines VGB-Standards „Instandhaltungsempfehlungen für Transformatoren und Drosselspulen“ diskutiert. Mehr erfahren195,00 €208,65 € Inkl. MwSt.
-
Instandhaltungsempfehlungen für Transformatoren und Drosselspulen - ebookVGB-S-169-12-2021-01-DE-ebookAuf Initiative der VGB-Projektgruppe „Transformatoren“ wurde in einem Fachgespräch der Bedarf eines VGB-Standards „Instandhaltungsempfehlungen für Transformatoren und Drosselspulen“ diskutiert. Mehr erfahren195,00 €208,65 € Inkl. MwSt.
-
Structural Design of Cooling Towers - ebookVGB-S-610-00-2019-10-EN-ebookThis VGB-Standard VGB-S-610, “Structural Design of Cooling Towers” constitutes the joint basis – together with VGB-R 135e and VGB-R 612e – for the civil engineering-related planning including design, construction and approval Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Kühlwassersysteme und Kühlwasserbehandlung - PrintVGBE-S-455-00-2022-12-DEDer vorliegende vgbe-Standard „Kühlwassersysteme und Kühlwasserbehandlung“, VGBE-S-455-00-2022-12-DE, ersetzt die bisherige VGB-Kühlwasserrichtlinie VGB-R 455, die in der zweiten Ausgabe im Januar 2000 erschienen war. Dies Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
BTR - Bautechnik bei Kühltürmen - PrintVGB-S-610-00-2019-10-DEDer vorliegende VGB-Standard stellt – gemeinsam mit der VGB-R 135 und der VGB-R 612 – eine vereinheitlichende Grundlage für die bautechnische Entwurfs-, Genehmigungs- und Ausführungsplanung sowie für die Bauausführung Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
BTR - Bautechnik bei Kühltürmen - ebookVGB-S-610-00-2019-10-DE-ebookDer vorliegende VGB-Standard stellt – gemeinsam mit der VGB-R 135 und der VGB-R 612 – eine vereinheitlichende Grundlage für die bautechnische Entwurfs-, Genehmigungs- und Ausführungsplanung sowie für die Bauausführung Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Sampling and Physico-Chemical Monitoring of Water and Steam Cycles - PrintVGB-S-006-00-2012-09-ENThis Standard VGB-S-006-00-2012-09-EN is intended to supplement VGB-S-010-T-00;2011-12.EN Standard for Feed Water, Boiler Water and Steam Quality for Power Plants / Industrial Plants (formerly VGB Standard VGB-R-450-Le) and to give recommendations fo Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Sampling and Physico-Chemical Monitoring of Water and Steam Cycles - ebookVGB-S-006-00-2012-09-EN-ebookThis Standard VGB-S-006-00-2012-09-EN is intended to supplement VGB-S-010-T-00;2011-12.EN Standard for Feed Water, Boiler Water and Steam Quality for Power Plants / Industrial Plants (formerly VGB Standard VGB-R-450-Le) and to give recommendations fo Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Einphasig gekapselte Generatorableitung - PrintVGB-S-164-13-2021-03-DEDie in der VGB-Fachgruppe „Elektrische Maschinen und Anlagen“ vertretenen Betreiber veranlassten die Bildung einer Projektgruppe „Generatorableitung“, um konkrete Vorgaben für Auslegung, Errichtung, Modifizierung, Betrieb Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - PrintVGB-S-133-00-2018-07-ENServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - ebookVGB-S-133-00-2018-07-EN-ebookServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Einphasig gekapselte Generatorableitung - ebookVGB-S-164-13-2021-03-DE-ebookDie in der VGB-Fachgruppe „Elektrische Maschinen und Anlagen“ vertretenen Betreiber veranlassten die Bildung einer Projektgruppe „Generatorableitung“, um konkrete Vorgaben für Auslegung, Errichtung, Modifizierung, Betrieb Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Anleitung zur Beschaffung von Dampfturbinenanlagen - PrintVGB-S-145-00-2015-11-DEDie VGB-S-145-00 dient als Rahmengerüst zur Erstellung allgemeiner und technischer Vertragsbedingungen zur Beschaffung von Dampfturbinenanlagen für den Einsatz in Anlagen zur Energieerzeugung (Kraftwerke). Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Kohlenstaubmessung mit der Nulldruck-Pendelsonde und/oder adaptierbaren Onlinemesstechniken - PrintVGB-S-150-29-2021-10-DEFeuerungseinstellungen tragen sowohl zur Wirkungsgradverbesserung von Dampferzeugern und somit zur CO2-Minderung als auch zur schadstoffarmen Verbrennung bei. Eine der Brennstoffqualität angepasste Ausmahlung und die gleichmäßige Bren Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Kohlenstaubmessung mit der Nulldruck-Pendelsonde und/oder adaptierbaren Onlinemesstechniken - ebookVGB-S-150-29-2021-10-DE-ebookFeuerungseinstellungen tragen sowohl zur Wirkungsgradverbesserung von Dampferzeugern und somit zur CO2-Minderung als auch zur schadstoffarmen Verbrennung bei. Eine der Brennstoffqualität angepasste Ausmahlung und die gleichmäßige Bren Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Assessment of fatigue loaded components in hydro power plants - PrintVGB-S-034-00-2014-10-ENThe VGB-Standard VGB-S-034-00-2014-10-EN deals with mechanical components and steel hydraulic structures for hydro power plants. The VGB-Standard deals solely with the impact of mechanical and/or thermal loads on the fatigue life of the plant pa Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Probenahme und physikochemische Überwachung von Wasser- und Dampfkreisläufen - PrintVGB-S-006-00-2012-09-DEDer hier vorliegende VGB-Standard VGB-S-006-00-2012-09-DE soll, ergänzend zum VGB-Standard VGB-S-010-T-00;2011-12.DE „Speisewasser-, Kesselwasser- und Dampfqualität für Kraftwerke/Industriekraftwerke“ (früher VGB-Richt Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Probenahme und physikochemische Überwachung von Wasser- und Dampfkreisläufen - ebookVGB-S-006-00-2012-09-DE-ebookDer hier vorliegende VGB-Standard VGB-S-006-00-2012-09-DE soll, ergänzend zum VGB-Standard VGB-S-010-T-00;2011-12.DE „Speisewasser-, Kesselwasser- und Dampfqualität für Kraftwerke/Industriekraftwerke“ (früher VGB-Richt Mehr erfahren190,00 €203,30 € Inkl. MwSt.