Back to Top
- Alternative Suchbegriffe
- analysis of fgd gypsum vgb m 701e 2024
- analysis of fgd gypsum vgb m 701e 201
- Verwandte Suchbegriffe
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2:
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2
- VGB-R 108e Fire Protection in Power Plants %E2%80%93 2011 978-3-86875-544-2
- VGB/BAW-Standard "Korrosionsschutz von Offshore-Bauwerken zur Nutzung der Windenergie - Teil 3: Applikation von Beschichtungssy
- vgb r 10 anhang 3
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - PrintVGB-S-831-00-2015-05-ENReplaced by multi-part publication VGBE-S-831; still available for existing installations. (https://shop.vgbe.energy/vgbe-s-831-01-2025-04-de-en-ebook.html) The Guideline applies to the entire technical documentation (technical plant data and docume Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - ebookVGB-S-831-00-2015-05-EN-ebookReplaced by multi-part publication VGBE-S-831; still available for existing installations. (https://shop.vgbe.energy/vgbe-s-831-01-2025-04-de-en-ebook.html) The Guideline applies to the entire technical documentation (technical plant data and docume Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Recommendations for the improvement of H2 safety at hydrogen-cooled generators - PrintVGB-S-165-00-2014-07-ENThe aim of these recommendations for improving H2 safety is to provide information for designing, constructing, modernising/refurbishing and operating hydrogen-cooled generators in power plants. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the improvement of H2 safety at hydrogen-cooled generators - ebookVGB-S-165-00-2014-07-EN-eBookThe aim of these recommendations for improving H2 safety is to provide information for designing, constructing, modernising/refurbishing and operating hydrogen-cooled generators in power plants. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Thermal Behaviour of Steam Turbines - ebookR105e-ebooklt should always be remembered that placing excessive requirements on the start-up and loading behaviour of turbines will reduce the serve life of certain components . Mention is also made of the gentle mode of operation nowadays possible when suitab Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - PrintVGB-S-013-00-2017-04-ENThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - ebookVGB-S-013-00-2017-04-EN-ebookThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Guideline for the Inspection and Evaluation of In-Service Rotors and Casings of Steam and Gas Turbine Generator Sets - ebookR512e-ebookThe necessity of uniformly representing the inspection and evaluation of inservice components in due consideration of damage reported as well as the improvement of manufacturing technology and examination techniques led to the establishment of this g Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Selection of impulse pipes and sampling lines for water and steam sectors in thermal power stations - ebookVGB-S-170-R-41;2012-07.EN-ebookThis VGB-Standard was created to adapt the design of measurement and analytical/ discharge lines to the increased steam parameters and the updated long-term parameters. Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Tubes for Condensers and other Heat Exchangers for the Operation of Steam Turbine Plants - Copper Alloys - ebookR106e-ebookThe "Tubes for condensers and other heat exchangers for the operation of steam turbine plants" guidelines are currently split into three material groups (VGB-R 106e "Copper Alloys", VGB-R 113e "Stainless Steels" and VGB-R 114e "Titanium"). The guidel Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Function-related Documentation of Power Plant Instrumentation and Control in Line with Operating Requirements - ebookR170Ce-ebookThe first edition of the Guideline “Function-related documentation of power plant instrumentation and control in line with operating requirements", original title "Richtlinie für die betriebsgerechte, funktionsbezogene Dokumentation der Kr Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Application of data reconciliation in accordance with VDI 2048 - PrintVGB-S-009-S-00;2012-03.ENData reconciliation is frequently discussed in connection with IT systems for optimization of technical processes in industry. Data reconciliation as set out in VDI 2048 is indeed an interesting and technically complex process with which the quality Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Application of data reconciliation in accordance with VDI 2048 - ebookVGB-S-009-S-00;2012-03.EN-ebookData reconciliation is frequently discussed in connection with IT systems for optimization of technical processes in industry. Data reconciliation as set out in VDI 2048 is indeed an interesting and technically complex process with which the quality Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Guideline for the Construction and Operation of Ash Handling Plants - ebookR201e-ebookThis Guideline applies to ash handling facilities for steam boilers, extending from the collection points of the combustion residues up to the places of dispatch from the delineated power station area. Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - PrintVGB-S-020-00-2017-12-ENThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - ebookVGB-S-020-00-2017-12-EN-ebookThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Kraftwerksbekohlung - ebookM211ebookSeit der ersten Auflage des VGB-Merkblattes „Kraftwerksbekohlung“ im Jahre 1980 hat sich der Steinkohleanteil zur Stromerzeugung in Deutschland überwiegend von heimi-scher auf Importkohle verlagert. Gegenüber dem annähernd Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - PrintVGB-S-115-00-2016-01-ENThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - ebookVGB-S-115-00-2016-01-EN-ebookThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the operation and monitoring of boiler circulating pumps - Based on extensive follow-up examinations relating to the damage event in 2014 - ebookTW530e-ebookOn 12th May 2014 the pressure casing of a boiler circulating pump (BCP) in the hard coal-fired supercritical power station Staudinger, unit 5, failed which led to considerable damage in the power plant [1/1]. As is customary following such severe dam Mehr erfahren270,00 €288,90 € Inkl. MwSt.