Back to Top
- Alternative Suchbegriffe
- guideline for acceptance tests on water electrolysis plants plant
- guideline for acceptance tests on water electrolysis plants point
- Verwandte Suchbegriffe
- Guideline da VGB PowerTech Alemã VBG-B 107 “Abbreviation Catalogue for Power Plant Engineering
- Acceptance Test Measurements and Operation Monitoring of Air-Cooled Condensers under Vacuum
- Guideline Acceptance Test Measurements and Operation Monitoring of Air-Cooled Condensers under Vacuum
- plants fur de mann kauf
- plants fur de matt kaufer
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Änderungsblätter zum vgbe/VGB-Regelwerk / Amendments to vgbe/VGB standards kostenlos/free of charge - ebookvgbe-aenderung-fcÄnderungsblätter zum vgbe/VGB-Regelwerk / Amendments to vgbe/VGB standards (kostenlos/free of charge): VGB-B 108 (2014-11) | VGB-S-811 (2019-11 ed. 2022-12) | VGB-S-821 (2019-11 ed. 2022-12) VGB-S-823-31 (2018-10) | VGB-S-832 (2020-05, zur& Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - ebookVGB-S-026-00-2013-04-EN-ebookThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Recommendations for the operation and monitoring of boiler circulating pumps - Based on extensive follow-up examinations relating to the damage event in 2014 - ebookTW530e-ebookOn 12th May 2014 the pressure casing of a boiler circulating pump (BCP) in the hard coal-fired supercritical power station Staudinger, unit 5, failed which led to considerable damage in the power plant [1/1]. As is customary following such severe dam Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Oil system cleaning for gas and steam turbine plants - ebookVGB-S-030-00-2013-06-EN-ebookBy collecting and evaluating the vast experience gained during the operation, installation, modification and revision of gas and steam turbine oil plants and incorporating them into this VGB-Standard, the intention is to contribute to the operational Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Design Standards for Instrumentation and Control Equipment (B0 to B6) - ebookR170(B0-B6)e-ebookSections B1 to B6, present as a collection of data in VGB guideline VGB R 170 B, are to be understood as a catalogue of requirements for the specification of and/or the terms of reference for instrumentation and control equipment projects. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - PrintVGB-S-044-00-2019-05-ENThe VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these re Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Availability of Power Plants 2012 – 2021, Edition 2022 (KISSY database evaluation) - ebookVGB-TW-103Ve-2022-ebookSince 1970 VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2022) presents the analysis about availability and utiliz Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Recommendations for thermal/mechanical generator protection - PrintVGB-S-164-11-2016-08-ENTo detect incipient damage to generators in power plants, protective equipment is installed. For electrical protection, in 2012 VGB published recommendations in the VGB-Standard VGB-S-025 “Electrical Generating Unit Protection”. The VGBSt Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Rating charts for rating the microstructural composition and creep rupture damage of creep-resistant steel for high pressure pipelines and boiler components and their weld connections - ebookVGBE-S-517-00-2024-11-EN-ebookTo determine the microstructural condition and assess material fatigue, metallographic microstructural analyses are performed on power plant components that have been operated in the creep range for long periods of time. Real microstructural images, Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Fire and Explosion Protection in Biomass Power Plants - PrintVGB-S-018-00-2013-12-ENThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Availability of Power Plants 2013 – 2022, Edition 2023 (KISSY database evaluation) - ebookVGBE-TW-103Ve-2023-ebookSince 1970 vgbe/VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2023) presents the analysis about availability and u Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Availability of Power Plants 2014 – 2023, Edition 2024 (KISSY database evaluation) - ebookVGBE-TW-103Ve-2024-ebookSince 1970 vgbe/VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2024) presents the analysis about availability and u Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - ebookVGB-S-014-2011-EN-ebookAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Analysis of Unavailability of Power Plants 2012 – 2021, Edition 2022 (KISSY database evaluation) - ebookVGB-TW-103Ae-2022-ebookSince 1970 VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2022) presents the analysis about unavailability for the Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Coal Handling in Power Plants - ebookM211e-ebookThe VGB Instruction Sheet “Coal Handling in Power Plants” contains a collection of experience and recommendations which was prepared to the best of our knowledge but cannot always completely reproduce the state of the art. It provides a s Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Measurement Systems - ebookVGB-S-170-43-2015-07-EN-ebookMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Analysis of Unavailability of Power Plants 2013 – 2022, Edition 2023 (KISSY database evaluation) - ebookVGBE-TW-103Ae-2023-ebookSince 1970 vgbe/VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2023) presents the analysis about unavailability of Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Analysis of Unavailability of Power Plants 2014 – 2023, Edition 2024 (KISSY database evaluation) - ebookVGBE-TW-103Ae-2024-ebookSince 1970 vgbe/VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2024) presents the analysis about unavailability of Mehr erfahren340,00 €363,80 € Inkl. MwSt.