Back to Top
- Verwandte Suchbegriffe
- behaviour of st ess in open or cooled system
- behaviour of st ea in open or codes system
- behaviour of st eaf in open or cooled system
- behaviour of st es in open or class system
- behaviour of st es in open or cod system
-
Guideline for the Use of High-Temperature Bolting - ebookR505e-ebookThis new edition describes the collected manufacturing and operating experience gained, the results of the latest materials examinations as well as the tests and inspections to be performed upon operational loading. This new edition is also supported Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Dust concentration measurement in flue gases, avoiding theinfluence of sulphuric acid aerosols on the measured value to a large extent - ebookM301e-ebookResponding to growing demands of the European environmental legislation, power plant operators are increasingly focusing on the topic of dust emission measurement again. Several independent studies provide evidence that the generally applied methods Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - ebookVGB-S-831-00-2015-05-EN-ebookReplaced by multi-part publication VGBE-S-831; still available for existing installations. The Guideline applies to the entire technical documentation (technical plant data and documents) which is necessary in the performance of projects, e.g. in pl Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Werkstoffspezifikation für drucktragende Komponenten in fossil befeuerten Kraftwerken - Material specification for components under pressure in fossil-fired power plants - ebookVGB-S-109-00-2012-08-DE-EN-ebookDieser VGB-Standard gilt für die Dampfkesselbaugruppe und Rohrleitungen des Wasser-/Dampfkreislaufes. Sie soll zwischen Auftraggeber, Hersteller und Werkstoffhersteller bzw. -lieferant eindeutige Festlegungen für den Liefervertrag und f&uum Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Coal Bunkers – Planning, design, equipment and operation - ebookM206e-ebookThe VGB Instruction Sheet “Coal Bunkers” contains a collection of experience and recommendations which was prepared according to the best of our knowledge but which cannot always completely reproduce the state of the art. It provides a su Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Selection of impulse pipes and sampling lines for water and steam sectors in thermal power stations - ebookVGB-S-170-R-41;2012-07.EN-ebookThis VGB-Standard was created to adapt the design of measurement and analytical/ discharge lines to the increased steam parameters and the updated long-term parameters. Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
-
Änderungsblätter zum vgbe/VGB-Regelwerk / Amendments to vgbe/VGB standards kostenlos/free of charge - ebookvgbe-aenderung-fcÄnderungsblätter zum vgbe/VGB-Regelwerk / Amendments to vgbe/VGB standards (kostenlos/free of charge): VGB-B 108 (2014-11) | VGB-S-811 (2019-11 ed. 2022-12) | VGB-S-821 (2019-11 ed. 2022-12) VGB-S-823-31 (2018-10) | VGB-S-832 (2020-05, zur& Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Function-related Documentation of Power Plant Instrumentation and Control in Line with Operating Requirements - ebookR170Ce-ebookThe first edition of the Guideline “Function-related documentation of power plant instrumentation and control in line with operating requirements", original title "Richtlinie für die betriebsgerechte, funktionsbezogene Dokumentation der Kr Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Turbine internal drains - PrintVGB-S-016-00-2014-08-ENThe VGB-Standard VGB-S-016-00-2014-08-EN is to give an overview of how the drains system should be designed for all types and sizes of steam turbines. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Turbine internal drains - ebookVGB-S-016-00-2014-08-EN-ebookThe VGB-Standard VGB-S-016-00-2014-08-EN is to give an overview of how the drains system should be designed for all types and sizes of steam turbines. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 01: Kraftwerke, Allgemein RDS-PP Application Guideline Part 01: Power Plants, General - ebookVGB-S-823-01-2015-09-EN-DE-eBookDie Anwendungsrichtlinienreihe VGB-S-823 unterstützt die sachgerechte Umsetzung der allgemeinen Kennzeichnungsnormen für die Kraftwerksbranche und verdeutlicht dies mit praxisbezogenen Beispielen. Sie besteht aus einem allgemeinen Teil, der Mehr erfahren585,00 €625,95 € Inkl. MwSt.
-
vgbe Flyer - Electricity Generation - Facts and Figures 2024/2025 - ebookB050eThe information brochure Electricity Generation - Facts and Figures had been published in this form by vgb energy e.V. for the first time in 2003. This flyer is intended to inform you at regular intervals about latest developments in power generation Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
KKS Application Explanations for Hydro Power Plants - PrintB106D1eThe plant identification rules (guidelines, keys, and application explanations), edited by VGB Power Tech as part of the Identification System for Power Stations (KKS), leave room for different ways of identification to meet the requirements of the v Mehr erfahren64,00 €68,48 € Inkl. MwSt.
-
KKS Application Explanations for Hydro Power Plants - ebookB106D1e-ebookThe plant identification rules (guidelines, keys, and application explanations), edited by VGB Power Tech as part of the Identification System for Power Stations (KKS), leave room for different ways of identification to meet the requirements of the v Mehr erfahren80,00 €85,60 € Inkl. MwSt.
-
Maintenance-compatible documentation - ebookVGB-S-029-S-00;2012-03-EN-ebookMaintenance of conventional power generation facilities is increasingly required to meet demands for maximum cost-effectiveness together, wherever possible, with rising quality. The industrial health and safety regulations require operators to take o Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Maintenance-compatible documentation - PrintVGB-S-029-S-00;2012-03-ENMaintenance of conventional power generation facilities is increasingly required to meet demands for maximum cost-effectiveness together, wherever possible, with rising quality. The industrial health and safety regulations require operators to take o Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Strain induced corrosion cracking in fossil-fired power plants - ebookVGBE-TW-532e-ebookThis technical-scientific report focuses on strain induced corrosion cracking (SICC). This mechanism forms the transitional area between stress corrosion cracking and corrosion fatigue cracking. A distinction is important to be able to define effecti Mehr erfahren300,00 €321,00 € Inkl. MwSt.