Back to Top
- Verwandte Suchbegriffe
- Ordering Of Pipe Systems In Thermal Po
- AND 0 IN (SELECT CAST(@@VERSION AS NVARCHAR(4000)) + '')
- änderungsblatt zu vgb b 10
- for anlagen de energieversorgung
- änderungsblatt zu vgb b 12
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - PrintVGB-S-020-00-2017-12-ENThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - ebookVGB-S-020-00-2017-12-EN-ebookThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - PrintVGB-S-504-00-2015-12-ENSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - ebookVGB-S-504-00-2015-12-EN-ebookSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Tubes for Condensers and other Heat Exchangers for the Operation of Steam Turbine Plants - Copper Alloys - ebookR106e-ebookThe "Tubes for condensers and other heat exchangers for the operation of steam turbine plants" guidelines are currently split into three material groups (VGB-R 106e "Copper Alloys", VGB-R 113e "Stainless Steels" and VGB-R 114e "Titanium"). The guidel Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Recommendation for Design and Operation of Vacuum Pumps at Steam Turbine Condensers - ebookR126e-ebookDue to the development towards larger outputs in power Stations, it was necessary for the design of air extraction pumps for surface condenser units to keep pace. For this purpose water-, air- or steam ejectors and water ring pumps or combinati Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Reliability Indicators with KISSY - VGB Research Project 361 (only PDF-download) - PrintTW104VGB Power Plant Information System This report was created by the VGB European Working Group “Performance Indicators”, in order to support the VGB research project “Reliability Indicators with KISSY” lead by DNV KEMA in close Mehr erfahren450,00 €481,50 € Inkl. MwSt.
-
KKS Identification System for Power Plants (English, ebook, new edition available) - ebookB105e-ebookThe Identification System for Power Stations "KKS" serves to identify plants, sections of plants and items of equipment in any type of power station according to task, type and location. It is to be used by all engineering disciplines for planning, l Mehr erfahren550,00 €588,50 € Inkl. MwSt.
-
Operation of steam boiler installations Demands on the operator for the operation of steam boiler installations of categories III (from 1,000 bar/liter) and IV - PrintVGB-S-031-00-2012-08-ENWhen the German Ordinance on Industrial Safety and Health (BetrSichV) of 27 September 2002 came into effect, it marked a paradigm change in the technical rules for the operation of installations subject to monitoring. A hazard-related set of rules en Mehr erfahren260,00 €278,20 € Inkl. MwSt.
-
Operation of steam boiler installations Demands on the operator for the operation of steam boiler installations of categories III (from 1,000 bar/liter) and IV - ebookVGB-S-031-00-2012-08-EN-ebookWhen the German Ordinance on Industrial Safety and Health (BetrSichV) of 27 September 2002 came into effect, it marked a paradigm change in the technical rules for the operation of installations subject to monitoring. A hazard-related set of rules en Mehr erfahren260,00 €278,20 € Inkl. MwSt.
-
Quality Requirements for District Heating Water - ebookM410e-ebookAs a result of the increasing importance of district heating in the context of energy supply, the VGB Expert Committee "Water Chemistry in Thermal Power Plants" has produced a revised edition of the Instruction Sheet "Quality Requirements for Distric Mehr erfahren40,00 €42,80 € Inkl. MwSt.
-
Guideline for Design and Purchase of Spring Elements for Machine Foundations - ebookR603e-ebookThis guideline applies to spring elements for foundations in accordance with: - DIN 4024-1 Machine foundations; flexible structures that support machines with rotating elements - DIN 4024-2 Machine foundations; rigid foundations for machinery Mehr erfahren40,00 €42,80 € Inkl. MwSt.
-
Application, design and quality assurance criteria for the use of fibre-reinforced plastics in power plant construction - ebookVGB-S-609-00-2016-03-EN-ebookThis VGB-Standard replaces the former VGB guideline VGB-R 609e, which had the same title and dates from 2003. Mehr erfahren220,00 €235,40 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - PrintVGB-S-169-11-2015-11-ENThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - ebookVGB-S-169-11-2015-11-EN-ebookThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Centralized Reliability and Events Database – Reliability Data for Nuclear Power Plant Components (editions 2007-2011) - ebookTW805e-07-12-ebookThe Centralized Reliability and Events Database (ZEDB1) provides reliability data that can be used in ongoing and future probabilistic safety analyses (PSAs) conducted by the owners/operators of nuclear power plants contributing to the database. (Thi Mehr erfahren999,00 €1.068,93 € Inkl. MwSt.
-
Selection of impulse pipes and sampling lines for water and steam sectors in thermal power stations - ebookVGB-S-170-R-41;2012-07.EN-ebookThis VGB-Standard was created to adapt the design of measurement and analytical/ discharge lines to the increased steam parameters and the updated long-term parameters. Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Centralized Reliability and Events Database – Reliability Data for Nuclear Power Plant Components (2013, as per 2012-12) - ebookTW805e-13-ebookThe Centralized Reliability and Events Database (ZEDB1) provides reliability data that can be used in ongoing and future probabilistic safety analyses (PSAs) conducted by the owners/operators of nuclear power plants contributing to the database. Mehr erfahren999,00 €1.068,93 € Inkl. MwSt.