Back to Top
- Alternative Suchbegriffe
- 115 2025 nvopzp and 1 1 or iks
- 188 2025 nvopzp and 1 1 or iks
- Verwandte Suchbegriffe
- AND 0 IN (SELECT CAST(@@VERSION AS NVARCHAR(4000)) + '')
- änderungsblatt zu vgb b 10
- änderungsblatt zu vgb b 10e
- änderungsblatt zu vgb b 12e
- AND 0 IN (SELECT CAST(@@VERSION AS NVARCHAR(4000)) '')
-
Operation of steam boiler installations Demands on the operator for the operation of steam boiler installations of categories III (from 1,000 bar/liter) and IV - PrintVGB-S-031-00-2012-08-ENWhen the German Ordinance on Industrial Safety and Health (BetrSichV) of 27 September 2002 came into effect, it marked a paradigm change in the technical rules for the operation of installations subject to monitoring. A hazard-related set of rules en Mehr erfahren260,00 €278,20 € Inkl. MwSt.
-
Operation of steam boiler installations Demands on the operator for the operation of steam boiler installations of categories III (from 1,000 bar/liter) and IV - ebookVGB-S-031-00-2012-08-EN-ebookWhen the German Ordinance on Industrial Safety and Health (BetrSichV) of 27 September 2002 came into effect, it marked a paradigm change in the technical rules for the operation of installations subject to monitoring. A hazard-related set of rules en Mehr erfahren260,00 €278,20 € Inkl. MwSt.
-
Failures and Forced Unavailability of Power Plants Henk C. Wels, - ebookB035ebookPower plants are not functioning to the fullest 100 % of the time. Maintenance and inspection of some components require them to be off-line in time, however, this can be planned such that customers continue receiving power from the electrical grid, Mehr erfahren48,00 €51,36 € Inkl. MwSt.
-
Failures and Forced Unavailability of Power Plants (Henk C. Wels, print) - PrintB035Power plants are not functioning to the fullest 100 % of the time. Maintenance and inspection of some components require them to be off-line in time, however, this can be planned such that customers continue receiving power from the electrical grid, Mehr erfahren48,00 €51,36 € Inkl. MwSt.
-
Leitfaden für die Qualitätssicherung bei der Montage von Flanschverbindungen - ebookVGB-S-052-00-2020-06-DE-ebookIm Geltungsbereich der Betriebssicherheitsverordnungen werden in TRBS 2141 [1] die für die Sicherheit von lösbaren Verbindungen bei druckbeaufschlagten Arbeitsmitteln relevanten Einflussfaktoren genannt. Während für die Auslegung Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Recommendation for Design and Operation of Vacuum Pumps at Steam Turbine Condensers - ebookR126e-ebookDue to the development towards larger outputs in power Stations, it was necessary for the design of air extraction pumps for surface condenser units to keep pace. For this purpose water-, air- or steam ejectors and water ring pumps or combinati Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Hinweise zur Herstellungs-, Werkstoff- und Prüftechnik von Gussstücken für REA-Suspensionspumpen aus Duplex-Werkstoffen - ebookM502ebookDas vorliegende Merkblatt wurde von einer Arbeitsgruppe des Arbeitskreises "Korrosion von metallischen Komponenten in Rauchgasentschwefelungsanlagen (REA)" im VGBArbeitskreis - Werkstofftechnik konventionell" erarbeitet, wobei die herstellende Indust Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Termes fondamentaux du secteur de l'électricité - 10e édition 2015, gratuit, free of charge - ebookVGB-S-002-01-2015-10-FR-ebookAvec la libéralisation du marché de l’électricité et la transition qui en découle vers une production d’électricité axée sur le marché, de plus en plus de nouveaux termes font Mehr erfahren0,00 €0,00 € Inkl. MwSt.Nicht lieferbar
-
Calculation of Reliability Data using Two-Stage Bayesian Models T-Book - ZEDB Benchmark - ebookTW820e-ebookBoth the Swedish PSA database T-Book and the German PSA database ZEDB use two-stage Bayesian models to calculate plant specific and generic reliability data from operational experience (component event data and operating times) of nuclear power plant Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Electrical Generating Unit Protection - 1st revised edition - ebookVGB-S-162-00-2020-02-EN-ebookFive years after the first publication and based on the initiative of the VGB technical group “Electrical Equipment”, the necessity of a revision to the VGB Standards “Electrical Unit Protection” (VGB-SO25) was discussed. As a Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Elektrischer Blockschutz - PrintVGB-S-162-00-2020-02-DE5 Jahre nach der Erstveröffentlichung wurde auf Initiative der VGB-Fachgruppe „Elektrische Maschinen und Anlagen“ in einem Fachgespräch der Überarbeitungsbedarf des VGB-Standards „Elektrischer Blockschutz“ (VGB- Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - PrintVGB-S-013-00-2017-04-ENThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - ebookVGB-S-013-00-2017-04-EN-ebookThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
vgbe Flyer: Zahlen und Fakten zur Stromerzeugung 2025/2026 - ebook (only English version available)B050Die Informationsbroschüre "Zahlen und Fakten zur Stromerzeugung" wurde im Jahre 2003 erstmalig in dieser Form vom vgbe energy e.V. herausgegeben. Seitdem informiert dieser Flyer in regelmäßigen Abständen über Aktuelles rund um die Stromerzeugung Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Coal Bunkers – Planning, design, equipment and operation - ebookM206e-ebookThe VGB Instruction Sheet “Coal Bunkers” contains a collection of experience and recommendations which was prepared according to the best of our knowledge but which cannot always completely reproduce the state of the art. It provides a su Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Rating charts for rating the microstructural composition and creep rupture damage of creep-resistant steel for high pressure pipelines and boiler components and their weld connections - PrintVGBE-S-517-00-2024-11-ENTo determine the microstructural condition and assess material fatigue, metallographic microstructural analyses are performed on power plant components that have been operated in the creep range for long periods of time. Real microstructural images, Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Rating charts for rating the microstructural composition and creep rupture damage of creep-resistant steel for high pressure pipelines and boiler components and their weld connections - ebookVGBE-S-517-00-2024-11-EN-ebookTo determine the microstructural condition and assess material fatigue, metallographic microstructural analyses are performed on power plant components that have been operated in the creep range for long periods of time. Real microstructural images, Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - PrintVGB-S-033-00-2017-07-ENThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.