Back to Top
- Alternative Suchbegriffe
- s 01 03 2023 04 de
- s 010 03 202 04 de
- Verwandte Suchbegriffe
- 010 00 2023 12
- 010 00 2022 12
- 010 00 2014 12
- 010 00 2024 12
- 010 00 2015 12
-
Dehnungsrisskorrosion in fossil-befeuerten Kraftwerken - PrintVGBE-TW-532Der vorliegende technisch-wissenschaftliche Bericht VGBE-TW-532 stellt die Dehnungsrisskorrosion (DRK) in den Fokus. Dieser Mechanismus bildet den Übergangsbereich zwischen Spannungsrisskorrosion und Schwingungsrisskorrosion. Eine Abgrenzung ist wic Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Strain induced corrosion cracking in fossil-fired power plants - PrintVGBE-TW-532eThis technical-scientific report focuses on strain induced corrosion cracking (SICC). This mechanism forms the transitional area between stress corrosion cracking and corrosion fatigue cracking. A distinction is important to be able to define effecti Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - PrintVGB-S-133-00-2018-07-ENServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - ebookVGB-S-133-00-2018-07-EN-ebookServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Fire Protection in Onshore Wind Turbines - ebookVGB-S-017-00-2018-09-EN-ebookFire-fighting operations by fire brigades in onshore wind turbines are almost impossible because of their height and resulting difficulty of accessing them. For this reason, fire prevention, early detection and early fighting of a fire, and the self- Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - PrintVGB-S-014-2011-ENAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Heat exchangers and boilers in the steam-water cycle of thermal power plants - ebookVGB-S-110-R-00;2012-07.EN-ebookThis VGB standard is intended to enhance the service performance (equipment availability) of heat exchangers and boilers in the water/steam cycle of thermal power stations. The VGB standard consists of a general section for the order and a technical Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Fire Protection in Onshore Wind Turbines - PrintVGB-S-017-00-2018-09-ENFire-fighting operations by fire brigades in onshore wind turbines are almost impossible because of their height and resulting difficulty of accessing them. For this reason, fire prevention, early detection and early fighting of a fire, and the self- Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - PrintVGB-S-033-00-2017-07-ENThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Atbilstības novērtējuma un darba aizsardzības prasību savstarpējā iedarbība hidroelektrostacijās - PrintVGB-S-033-00-2017-07-LVVGB standarti, turpmāk tekstā saukti par "darbu", un visi darbā izmantotie materiāli un ilustrācijas ir aizsargātas ar autortiesībām. Izmantošanas tiesību piešķiršana ir tikai VGB PowerTech pārziņā. Termins "darbs i Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Atbilstības novērtējuma un darba aizsardzības prasību savstarpējā iedarbība hidroelektrostacijās - ebookVGB-S-033-00-2017-07-LV-ebookVGB standarti, turpmāk tekstā saukti par "darbu", un visi darbā izmantotie materiāli un ilustrācijas ir aizsargātas ar autortiesībām. Izmantošanas tiesību piešķiršana ir tikai VGB PowerTech pārziņā. Termins "darbs i Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - ebookVGB-S-014-2011-EN-ebookAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - PrintVGB-S-020-00-2017-12-ENThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - ebookVGB-S-020-00-2017-12-EN-ebookThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
VGB-Standard for the Water in Nuclear Power Plants with Light-Water Reactors Part 1: PWR Part 2: BWR - ebookVGB-S-401-00-2020-05-EN-ebookAlmost half a century after publication of the first edition of a VGB-Guideline for the Water in Nuclear Power Plants with Light-Water Reactors and approx. 13 years after the third edition in 2006, the task of a renewed adaptation of the Guideline fo Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
VGB-Standard for the Water in Nuclear Power Plants with Light-Water Reactors Part 1: PWR Part 2: BWR - PrintVGB-S-401-00-2020-05-ENAlmost half a century after publication of the first edition of a VGB-Guideline for the Water in Nuclear Power Plants with Light-Water Reactors and approx. 13 years after the third edition in 2006, the task of a renewed adaptation of the Guideline fo Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Condition Monitoring and Inspection of Components of Steam Boiler Plants, Pressure Vessel Installations and Water- or Steam-Pipes in Thermal Power Plants - 3rd edition 2019 - PrintVGB-S-506-00-2019-02-ENThis VGB Standard describes possibilities and methods for condition monitoring and performance of tests and inspections in due consideration of hazards especially arising from steam and pressure in components of steam boiler plants, pressure vessel i Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Condition Monitoring and Inspection of Components of Steam Boiler Plants, Pressure Vessel Installations and Water- or Steam-Pipes in Thermal Power Plants - 3rd edition 2019 - ebookVGB-S-506-00-2019-02-EN-ebookThis VGB Standard describes possibilities and methods for condition monitoring and performance of tests and inspections in due consideration of hazards especially arising from steam and pressure in components of steam boiler plants, pressure vessel i Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.