Back to Top
- Verwandte Suchbegriffe
- ebook download vgb s 517
- ebook download vgb s 513
- ebook download vgb s 510
- ebook download vgb s 503
- ebook download vgb s 504
-
Recommendations for the Inspection and Overhaul of Steam Turbines - ebookVGB-S-115-00-2016-01-EN-ebookThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Gas distributor plates in fluidized bed systems - ebookM218e-ebookSince about 1985, fluidized bed combustion (FBC) has greatly extended the possibilities for operating power plants on the basis of solid fuels economically and in an environmentally acceptable manner. In addition to the system-inherent possibilities Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Measures for the avoidance and handling of instrumentation and control equipment failures - ebookVGB-S-170-12-2018-08-EN-ebookThe former VGB Guideline VGB-R 170 A1e “Measures for the avoidance and handling of instrumentation and control equipment failures” was used since 2005 for the support during the specification and assessment of control and instrumentation Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Measurement Systems - ebookVGB-S-170-43-2015-07-EN-ebookMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Design Standards for Instrumentation and Control Equipment (B0 to B6) - ebookR170(B0-B6)e-ebookSections B1 to B6, present as a collection of data in VGB guideline VGB R 170 B, are to be understood as a catalogue of requirements for the specification of and/or the terms of reference for instrumentation and control equipment projects. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Concept of (recurrent) training for performance of non-routine activities in German NPPs - ebookVGB-S-043-00-2016-06-EN-ebookOn the basis of the established practices in German nuclear power plants, and making allowance from the VGB “Concept for the Implementation of Tools for Professional Conduct”, the WG has worked out the principles for such training (target Mehr erfahren150,00 €160,50 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - ebookVGB-S-170-42-2014-08-EN-eBookThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - ebookVGBE-S-455-00-2022-12-EN-ebookThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
KKS Identification System for Power Stations - Key Part: Function Keys, Equipment Unit Keys, Component Keys - Excel-table (English edition)KKS-Basis-EXCEL-ENKKS Identification System for Power Stations, VGB-Standard VGB-S-811-01-2018-01-EN. Excel-table of the Key Part (English edition, German edition available): Function Keys, Equipment Unit Keys, Component Keys Mehr erfahren2.950,00 €3.156,50 € Inkl. MwSt.
-
vgbe-Abkürzungskatalog für Anlagen der Energieversorgung / vgbe abbreviation-catalog for power supply units - ebook & Excel-ListeVGBE-S-891-00-2024-04-DE-EN-PLUS-ebookZiel des vorliegenden VGBE-Abkürzungskatalogs VGBE-S-891-00-2024-04-DE-EN ist es die Systematik zur Bildung von Abkürzungen zu regeln. Durch Festschreibung von Abkürzungen für Begriffe für Anlagen der Energieversorgung wird Planern, Errichtern u Mehr erfahren1.085,00 €1.160,95 € Inkl. MwSt.
-
Refractory Lining in Fluidised Bed Combustion Plant - ebookVGB-S-219-00-2015-03-EN-eBookAdvice for Ordering, Design, Construction and Operation of Refractory Lining in Fluidised Bed Combustion Plant Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Quality Requirements for District Heating Water - ebookM410e-ebookAs a result of the increasing importance of district heating in the context of energy supply, the VGB Expert Committee "Water Chemistry in Thermal Power Plants" has produced a revised edition of the Instruction Sheet "Quality Requirements for Distric Mehr erfahren40,00 €42,80 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - ebookVGB-S-020-00-2017-12-EN-ebookThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Recommendation for Design and Operation of Vacuum Pumps at Steam Turbine Condensers - ebookR126e-ebookDue to the development towards larger outputs in power Stations, it was necessary for the design of air extraction pumps for surface condenser units to keep pace. For this purpose water-, air- or steam ejectors and water ring pumps or combinati Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Avoidance of generator damage resulting from condensation on live parts - ebookVGB-S-164-12-2016-10-EN-ebookThe moisture contained in gaseous substances condenses on impact with colder surfaces to a greater of lesser extent, depending on the ambient conditions and in particular on pressure and temperature. If this occurs in the area of non-insulated electr Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Maintenance-compatible documentation - ebookVGB-S-029-S-00;2012-03-EN-ebookMaintenance of conventional power generation facilities is increasingly required to meet demands for maximum cost-effectiveness together, wherever possible, with rising quality. The industrial health and safety regulations require operators to take o Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Guideline for Acceptance Tests on Water-Electrolysis Plants - ebookVGBE-S-159-00-2024-07-EN-ebookTo develop the full potential of water electrolysis, it is crucial that the systems work reliably and efficiently. This requires a standardised and binding basis for proof of guaranteed performance of water electrolysis plants as a milestone on the w Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Dust concentration measurement in flue gases, avoiding theinfluence of sulphuric acid aerosols on the measured value to a large extent - ebookM301e-ebookResponding to growing demands of the European environmental legislation, power plant operators are increasingly focusing on the topic of dust emission measurement again. Several independent studies provide evidence that the generally applied methods Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Analysis of FGD Gypsum - ebookM701e-ebookThe first edition of the instruction sheet “Analysis of FGD gypsum” was elaborated and published by the joint Working Group of the "Bundesverbandes der Gipsindustrie e.V." and VGB PowerTech e.V. to assure a high quality of FDG gypsum in c Mehr erfahren60,00 €64,20 € Inkl. MwSt.