Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - ebookVGB-S-131-00-2017-07-EN-ebookThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Refractory Lining in Fluidised Bed Combustion Plant - PrintVGB-S-219-00-2015-03-ENAdvice for Ordering, Design, Construction and Operation of Refractory Lining in Fluidised Bed Combustion Plant Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Equipment for Cleaning of Heat Transfer Surfaces in Steam Raising Plants - Operation, Maintenance and Expert Systems - PrintVGB-S-221-00-2014-06-ENVery substantial advances have been made over the last couple of years in the field of heat transfer surface cleaning which are included in the present revision of the Standard (cf. first edition). New methods like explosion cleaning are now included Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Coal Bunkers – Planning, design, equipment and operation - ebookM206e-ebookThe VGB Instruction Sheet “Coal Bunkers” contains a collection of experience and recommendations which was prepared according to the best of our knowledge but which cannot always completely reproduce the state of the art. It provides a su Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
RDS-PP® Pocketbook, English, 2nd edition - PrintVGBE-S-821-91-2021-12-ENThe 2nd edition of the RDS-PP Pocketbook for conventional, nuclear, renewable energy plants, storage and power-2-x has been published as update VGBE-S-821-91-2021-09-EN.The 2019/11 additions to the system key are taken into account. The RDS-PP Pocket Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Protection Measures on Reinforced Concrete Cooling Towers and Chimneys against Operational and Environmental Impacts - ebookR612e-ebookAs a result of particular impacts and stresses affecting reinforced concrete cooling towers and chimneys and strengthend by their special structures and conditions of operation, adequate instructions are required for contractors initially applying or Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Fire Protection in Onshore Wind Turbines - ebookVGB-S-017-00-2018-09-EN-ebookFire-fighting operations by fire brigades in onshore wind turbines are almost impossible because of their height and resulting difficulty of accessing them. For this reason, fire prevention, early detection and early fighting of a fire, and the self- Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Fire Protection in Onshore Wind Turbines - PrintVGB-S-017-00-2018-09-ENFire-fighting operations by fire brigades in onshore wind turbines are almost impossible because of their height and resulting difficulty of accessing them. For this reason, fire prevention, early detection and early fighting of a fire, and the self- Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Gas distributor plates in fluidized bed systems - ebookM218e-ebookSince about 1985, fluidized bed combustion (FBC) has greatly extended the possibilities for operating power plants on the basis of solid fuels economically and in an environmentally acceptable manner. In addition to the system-inherent possibilities Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Preservation of Power Plants - PrintS-116-00-2016-04-ENThe VGB-Standard VGB-S116 shall apply to plants for firing fossil fuels and plants for firing substitute fuels. This standard comprises all essential process systems which are to be considered during plant outage or shutdown and have to be preserved. Mehr erfahren450,00 €481,50 € Inkl. MwSt.
-
Preservation of Power Plants - ebookVGB-S-116-00-2016-04-EN-ebookThe VGB-Standard VGB-S116 shall apply to plants for firing fossil fuels and plants for firing substitute fuels. This standard comprises all essential process systems which are to be considered during plant outage or shutdown and have to be preserved. Mehr erfahren450,00 €481,50 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - PrintVGB-S-033-00-2017-07-ENThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - ebookVGB-S-033-00-2017-07-EN-ebookThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Protective Measures Against Vehicle Impact - ebookM620e-ebookWithin this instruction sheet protective measures, based on relevant actual standards, against the actions of deviating vehicles (vehicle impact) on buildings, civil structural parts and mechanical components in conventional power plants and comparab Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Assessment of fatigue loaded components in hydro power plants - PrintVGB-S-034-00-2014-10-ENThe VGB-Standard VGB-S-034-00-2014-10-EN deals with mechanical components and steel hydraulic structures for hydro power plants. The VGB-Standard deals solely with the impact of mechanical and/or thermal loads on the fatigue life of the plant pa Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 01: Kraftwerke, Allgemein RDS-PP Application Guideline Part 01: Power Plants, General - PrintVGB-S-823-01-2015-09-EN-DEDie Anwendungsrichtlinienreihe VGB-S-823 unterstützt die sachgerechte Umsetzung der allgemeinen Kennzeichnungsnormen für die Kraftwerksbranche und verdeutlicht dies mit praxisbezogenen Beispielen. Sie besteht aus einem allgemeinen Teil, der Mehr erfahren585,00 €625,95 € Inkl. MwSt.
-
Fire and Explosion Protection in Biomass Power Plants - PrintVGB-S-018-00-2013-12-ENThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Fire and Explosion Protection in Biomass Power Plants - ebookVGB-S-018-00-2013-12-EN-ebookThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Part A: In-service monitoring of turbine oils in steam and gas turbines / Part B: In-service monitoring of fire-resistant fluids for steam and gas turbines - PrintVGB-S-416-00-2014-08-ENPart A describes effective in-service monitoring of oils in turbines. Due to thermal, chemical, physical and mechanical impacts, turbine oils are subject to change during operation. These changes normally lead to a deterioration in the oil characteri Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Organic Matter and Dissolved Carbon Dioxide in the Steam Water Circuit of Power Plant - ebookM418e-ebookAlthough no overwhelming evidence exists, organic acids and carbon dioxide have nevertheless been implicated as contributors to corrosion problems within the steam-water circuit. A dedicated group of international scientists, power plant chemists and Mehr erfahren200,00 €214,00 € Inkl. MwSt.