Back to Top
- Verwandte Suchbegriffe
- PROTECTION OF MECHANICAL EQUIPMENT IN POWER PLANT UNITS
- formelsammlung for de kraftwerksmeister
- for de planung von kühltürmen
- for anlagen de energieversorgung
- for de betriebsgerechte funktionsbezogene dokumentation
-
Heat exchangers and boilers in the steam-water cycle of thermal power plants - ebookVGB-S-110-R-00;2012-07.EN-ebookThis VGB standard is intended to enhance the service performance (equipment availability) of heat exchangers and boilers in the water/steam cycle of thermal power stations. The VGB standard consists of a general section for the order and a technical Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
VGB-Standard for the Water in Nuclear Power Plants with Light-Water Reactors Part 1: PWR Part 2: BWR - ebookVGB-S-401-00-2020-05-EN-ebookAlmost half a century after publication of the first edition of a VGB-Guideline for the Water in Nuclear Power Plants with Light-Water Reactors and approx. 13 years after the third edition in 2006, the task of a renewed adaptation of the Guideline fo Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
VGB-Standard for the Water in Nuclear Power Plants with Light-Water Reactors Part 1: PWR Part 2: BWR - PrintVGB-S-401-00-2020-05-ENAlmost half a century after publication of the first edition of a VGB-Guideline for the Water in Nuclear Power Plants with Light-Water Reactors and approx. 13 years after the third edition in 2006, the task of a renewed adaptation of the Guideline fo Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Condition Monitoring and Inspection of Components of Steam Boiler Plants, Pressure Vessel Installations and Water- or Steam-Pipes in Thermal Power Plants - 3rd edition 2019 - PrintVGB-S-506-00-2019-02-ENThis VGB Standard describes possibilities and methods for condition monitoring and performance of tests and inspections in due consideration of hazards especially arising from steam and pressure in components of steam boiler plants, pressure vessel i Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Sampling and Physico-Chemical Monitoring of Water and Steam Cycles - PrintVGB-S-006-00-2012-09-ENThis Standard VGB-S-006-00-2012-09-EN is intended to supplement VGB-S-010-T-00;2011-12.EN Standard for Feed Water, Boiler Water and Steam Quality for Power Plants / Industrial Plants (formerly VGB Standard VGB-R-450-Le) and to give recommendations fo Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Sampling and Physico-Chemical Monitoring of Water and Steam Cycles - ebookVGB-S-006-00-2012-09-EN-ebookThis Standard VGB-S-006-00-2012-09-EN is intended to supplement VGB-S-010-T-00;2011-12.EN Standard for Feed Water, Boiler Water and Steam Quality for Power Plants / Industrial Plants (formerly VGB Standard VGB-R-450-Le) and to give recommendations fo Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Elektrostaciju tehniskie un komerciālie pamatrādītāji (Latvian, Technical and Commercial Key Indicators for Power Plants, free of charge - ebook)VGB-S-002-03-2019-10-LV-ebookŠis VGB standarts ļauj lietotājam veikt elektrostaciju tehnisko un ekonomisko novērtējumu. Turklāt, izmantojot VGB standartu, var analizēt cenu ietekmes un tiesisko prasību ietekmi uz elektrostacijas darbību. Lietotājs saņem datu aps Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Avoidance of generator damage resulting from condensation on live parts - PrintVGB-S-164-12-2016-10-ENThe moisture contained in gaseous substances condenses on impact with colder surfaces to a greater of lesser extent, depending on the ambient conditions and in particular on pressure and temperature. If this occurs in the area of non-insulated electr Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Avoidance of generator damage resulting from condensation on live parts - ebookVGB-S-164-12-2016-10-EN-ebookThe moisture contained in gaseous substances condenses on impact with colder surfaces to a greater of lesser extent, depending on the ambient conditions and in particular on pressure and temperature. If this occurs in the area of non-insulated electr Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Analysis of FGD Gypsum - ebookM701e-ebookThe first edition of the instruction sheet “Analysis of FGD gypsum” was elaborated and published by the joint Working Group of the "Bundesverbandes der Gipsindustrie e.V." and VGB PowerTech e.V. to assure a high quality of FDG gypsum in c Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Guidelines for Ordering High-capacity Steam Boilers - ebookR101e-ebookThis guideline R 101 He gives guidance on writing the technical and commercial contract terms for the procurement of water tube boilers for use in electricity generating stations (power stations). Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
RDS-PP® – Application Guideline; Part 32: Wind Power Plants; Anwendungsrichtlinie, Teil 32: Windkraftwerke, 2nd Edition / 2. Ausgabe - ebookVGB-S-823-32-2021-12-EN-DE-ebookDie Anwendungsrichtlinie RDS-PP®, Teil 32: Windkraftwerke, umfasst die sachgerechte und anwendungsorientierte Umsetzung für den gesamten Bereich der Windenergienutzung auf Grundlage der allgemeinen Kennzeichnungsnorm für die Energi Mehr erfahren645,00 €690,15 € Inkl. MwSt.
-
Application, design and quality assurance criteria for the use of fibre-reinforced plastics in power plant construction - PrintVGB-S-609-00-2016-03-ENThis VGB-Standard replaces the former VGB guideline VGB-R 609e, which had the same title and dates from 2003. Mehr erfahren220,00 €235,40 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - PrintVGB-S-033-00-2017-07-ENThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - ebookVGB-S-033-00-2017-07-EN-ebookThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
RDS-PP® – Application Guideline; Part 32: Wind Power Plants; Anwendungsrichtlinie, Teil 32: Windkraftwerke, 2nd Edition / 2. Ausgabe - PrintVGB-S-823-32-2021-12-EN-DEDie Anwendungsrichtlinie RDS-PP®, Teil 32: Windkraftwerke, umfasst die sachgerechte und anwendungsorientierte Umsetzung für den gesamten Bereich der Windenergienutzung auf Grundlage der allgemeinen Kennzeichnungsnorm für die Energiebran Mehr erfahren645,00 €690,15 € Inkl. MwSt.
-
Termes fondamentaux du secteur de l'électricité - 10e édition 2015, gratuit, free of charge - ebookVGB-S-002-01-2015-10-FR-ebookAvec la libéralisation du marché de l’électricité et la transition qui en découle vers une production d’électricité axée sur le marché, de plus en plus de nouveaux termes font Mehr erfahren0,00 €0,00 € Inkl. MwSt.Nicht lieferbar
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - PrintVGB-S-020-00-2017-12-ENThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - ebookVGB-S-020-00-2017-12-EN-ebookThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Internal Cleaning of Water-Tube Steam Generating Plants and Associated Pipework - PrintVGB-S-513-00-2014-07-ENThe VGB-Standard shall apply to the cleaning of newly erected steam boiler plants and associated pipework, but, where required, e.g. after longer operational periods, it shall also apply to major repairs and inspections as well as in the case of othe Mehr erfahren320,00 €342,40 € Inkl. MwSt.