Back to Top
- Alternative Suchbegriffe
- 00 s 00 2023 03 en
- 00 s 00 2024 03 en
- Verwandte Suchbegriffe
- 2014 12 en
- 2014 00
- 2014 de
- 2014-08-DE
- 2014 08 de
-
Guide for the Procurement of Steam Turbine Plants - PrintVGB-S-145-00-2015-11-ENThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Guide for the Procurement of Steam Turbine Plants - ebookVGB-S-145-00-2015-11-EN-ebookThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Application of data reconciliation in accordance with VDI 2048 - ebookVGB-S-009-S-00;2012-03.EN-ebookData reconciliation is frequently discussed in connection with IT systems for optimization of technical processes in industry. Data reconciliation as set out in VDI 2048 is indeed an interesting and technically complex process with which the quality Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Recommendations for managing functional safety in steam boiler plants and systems of the water/steam cycle - 2nd revised edition (2020) - ebookVGB-S-008-00-2020-11-EN-ebookThe VGB standard addresses operators of thermal power plants as well as manufacturers and is intended to provide assistance in the application of the standards on functional safety. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Umsetzung des Alterungsmanagements in der Bautechnik nach KTA 1403 - PrintVGB-S-024-00-2014-01-DEDie Regel KTA 1403 „Alterungsmanagement in Kernkraftwerken“ in der Fassung von November 2010 regelt grundlegend, wie die Betreiber ein Alterungsmanagement durchzuführen haben. Dieser VGB-Standard ermöglicht ein einheitliches Vor Mehr erfahren65,00 €69,55 € Inkl. MwSt.
-
Umsetzung des Alterungsmanagements in der Bautechnik nach KTA 1403 - ebookVGB-S-024-00-2014-01-DE-ebookDie Regel KTA 1403 „Alterungsmanagement in Kernkraftwerken“ in der Fassung von November 2010 regelt grundlegend, wie die Betreiber ein Alterungsmanagement durchzuführen haben. Dieser VGB-Standard ermöglicht ein einheitliches Vor Mehr erfahren65,00 €69,55 € Inkl. MwSt.
-
Maintenance-compatible documentation - PrintVGB-S-029-S-00;2012-03-ENMaintenance of conventional power generation facilities is increasingly required to meet demands for maximum cost-effectiveness together, wherever possible, with rising quality. The industrial health and safety regulations require operators to take o Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
IT-Sicherheit für Erzeugungsanlagen - PrintVGB-S-175-00-2014-04-DEDer VGB-Standard "IT-Sicherheit für Erzeugungsanlagen" erläutert grundlegende Begriffe und stellt Bedrohungen und abgeleitete Anforderungen strukturiert und übersichtlich zusammen. Ergänzend sind Handlungsempfehlungen zu den einzelnen Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
IT-Sicherheit für Erzeugungsanlagen - ebookVGB-S-175-00-2014-04-DE-ebookDer VGB-Standard "IT-Sicherheit für Erzeugungsanlagen" erläutert grundlegende Begriffe und stellt Bedrohungen und abgeleitete Anforderungen strukturiert und übersichtlich zusammen. Ergänzend sind Handlungsempfehlungen zu den einzelnen Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Maintenance-compatible documentation - ebookVGB-S-029-S-00;2012-03-EN-ebookMaintenance of conventional power generation facilities is increasingly required to meet demands for maximum cost-effectiveness together, wherever possible, with rising quality. The industrial health and safety regulations require operators to take o Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Part A: In-service monitoring of turbine oils in steam and gas turbines / Part B: In-service monitoring of fire-resistant fluids for steam and gas turbines - PrintVGB-S-416-00-2014-08-ENPart A describes effective in-service monitoring of oils in turbines. Due to thermal, chemical, physical and mechanical impacts, turbine oils are subject to change during operation. These changes normally lead to a deterioration in the oil characteri Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
KKS Pocketbook, English, 4th edition - PrintVGBE-S-811-91-2021-12-EN/VGB-B-105-007.4eThe 4th edition of the KKS Pocketbook (KKS - Kraftwerk-Kennzeichensystem/Identification System for Power Stations) for conventional, nuclear, renewable energy plants, storage and power-2-x has been published as update VGBE-S-811-91-2021-09-EN.The 201 Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Lehrgangsempfehlung für die Weiterbildung zum/zur Geprüften Kraftwerker/Kraftwerkerin - PrintVGB-S-037-00-2015-09-DEIn der heutigen Zeit erwarten wir von dem Kraftwerker Fähigkeiten und Fertigkeiten in einem sehr breiten und heterogenen Handlungsspektrum. Der Rahmenstoffplan beinhaltet nicht nur die altbekannten „harten" technischen Kenntnisse sondern a Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Maßnahmen an Kühltürmen und Schornsteinen aus Stahlbeton zum Schutz gegen Betriebs- und Umgebungseinwirkungen - ebookR612ebookAufgrund spezieller Einwirkungen und Beanspruchungen sowie außergewöhnlicher Bauwerksstrukturen und Nutzungsbedingungen bei Kühltürmen und bei Schornsteinen aus Stahlbeton sind zur Erstausführung oder Erneuerung von Oberfl&a Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Leitfaden für das Lebensdauermanagement von Stahlbeton-Kühltürmen in Kraftwerken - ebookR613ebookDie vorliegende Richtlinie behandelt das Lebensdauermanagement von Stahlbeton-Kühltürmen. Dieses umfasst die Bauwerksunterhaltung mit den Maßnahmen, die die Sicherheit eines Kühlturmes gewährleisten. Ein wirkungsvolles Leben Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Prequalification of Partner Companies for High-Quality Maintenance - PrintVGB-S-040-00-2017-03-ENThis VGB-Standard for the prequalification of external/partner companies serves to ensure the quality expected or demanded by the client. The market situation forces the contractors (manufacturers and fabricators) to offer their products and service Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Innere Reinigung von Wasserrohr-Dampferzeugeranlagen und Rohrleitungen - PrintVGB-S-513-00-2014-07-DEDer VGB-Standard "Innere Reinigung von Wasserrohr-Dampferzeugeranlagen und Rohrleitungen" sollte Anwendung finden für die Reinigung von Dampfkesselanlagen und Rohrleitungen nach deren Neuerrichtung, aber auch bei Bedarf, z. B. nach längeren Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Werkstoffspezifikation für drucktragende Komponenten in fossil befeuerten Kraftwerken - Material specification for components under pressure in fossil-fired power plants - ebookVGB-S-109-00-2012-08-DE-EN-ebookDieser VGB-Standard gilt für die Dampfkesselbaugruppe und Rohrleitungen des Wasser-/Dampfkreislaufes. Sie soll zwischen Auftraggeber, Hersteller und Werkstoffhersteller bzw. -lieferant eindeutige Festlegungen für den Liefervertrag und f&uum Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Präqualifikation von Partnerfirmen für eine qualitätsgerechte Instandhaltung - PrintVGB-S-040-00-2017-03-DEDer Betrieb und der Anlagenerhalt und die damit verbundene laufende Instandhaltung und -setzung und darüber hinaus vorgeschriebene Überprüfungen und Optimierungsprozesse bilden einen relevanten Kostenfaktor im Betreiben von Energieerze Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Präqualifikation von Partnerfirmen für eine qualitätsgerechte Instandhaltung - ebookVGB-S-040-00-2017-03-DE-ebookDer Betrieb und der Anlagenerhalt und die damit verbundene laufende Instandhaltung und -setzung und darüber hinaus vorgeschriebene Überprüfungen und Optimierungsprozesse bilden einen relevanten Kostenfaktor im Betreiben von Energieerze Mehr erfahren320,00 €342,40 € Inkl. MwSt.