Back to Top
- Alternative Suchbegriffe
- analysis of fgd gypsum vgb m 701e 2023
- analysis of fgd gypsum vgb m 701e 2003
- Verwandte Suchbegriffe
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2:
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2
- VGB-R 108e Fire Protection in Power Plants %E2%80%93 2011 978-3-86875-544-2
- vgb r 10 anhang 3
- vgb r 10 anlag 3
-
Avoidance of generator damage resulting from condensation on live parts - PrintVGB-S-164-12-2016-10-ENThe moisture contained in gaseous substances condenses on impact with colder surfaces to a greater of lesser extent, depending on the ambient conditions and in particular on pressure and temperature. If this occurs in the area of non-insulated electr Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Avoidance of generator damage resulting from condensation on live parts - ebookVGB-S-164-12-2016-10-EN-ebookThe moisture contained in gaseous substances condenses on impact with colder surfaces to a greater of lesser extent, depending on the ambient conditions and in particular on pressure and temperature. If this occurs in the area of non-insulated electr Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Guideline for the Testing of DeNOx-catalysts - PrintVGB-S-302-00-2013-04-ENThe purpose of this VGB-Standard is to manifest a testing procedure, which can be employed by catalyst manufacturers, SCR equipment suppliers, power plant operatorsand independent testing institutions for determining the characteristics of SCR c Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Organic Matter and Dissolved Carbon Dioxide in the Steam Water Circuit of Power Plant - ebookM418e-ebookAlthough no overwhelming evidence exists, organic acids and carbon dioxide have nevertheless been implicated as contributors to corrosion problems within the steam-water circuit. A dedicated group of international scientists, power plant chemists and Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Sammlung von VGB-Richtlinien und VGB-Empfehlungen für die Leittechnik - Band I.2, Teile C2.1 – C2.10: Abnahme- und Kontrolluntersuchungen - ebookR123-C-I.2-ebookBand I.2 Abnahme- und Kontrolluntersuchungen Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Invitation to Tender Criteria for Heat Recovery Steam Generators Downstream of Gas Turbines - ebookM222e-ebookUpon the initiative of the VGB Committee “Steam Generators“ a special working group was founded to establish criteria for invitations to tender of heat recovery steam generators downstream of gas turbines. *Dieses Produkt ist ebenfalls i Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - PrintVGB-S-504-00-2015-12-ENSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - ebookVGB-S-504-00-2015-12-EN-ebookSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Industrial Chimneys - Evaluation of the Construction Methods, Notes on Design and Commissioning - ebookM642e-ebookThe VGB Instruction Sheet titled "Chimneys - Evaluation of the Construction Methods, Notes on Design and Commissioning", first edition, 1990, has assisted operators, designers and suppliers in the field of processes and design by conveying a wide ran Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - PrintVGB-S-014-2011-ENAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Application, design and quality assurance criteria for the use of fibre-reinforced plastics in power plant construction - ebookVGB-S-609-00-2016-03-EN-ebookThis VGB-Standard replaces the former VGB guideline VGB-R 609e, which had the same title and dates from 2003. Mehr erfahren220,00 €235,40 € Inkl. MwSt.
-
Sampling and Physico-Chemical Monitoring of Water and Steam Cycles - PrintVGB-S-006-00-2012-09-ENThis Standard VGB-S-006-00-2012-09-EN is intended to supplement VGB-S-010-T-00;2011-12.EN Standard for Feed Water, Boiler Water and Steam Quality for Power Plants / Industrial Plants (formerly VGB Standard VGB-R-450-Le) and to give recommendations fo Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Sampling and Physico-Chemical Monitoring of Water and Steam Cycles - ebookVGB-S-006-00-2012-09-EN-ebookThis Standard VGB-S-006-00-2012-09-EN is intended to supplement VGB-S-010-T-00;2011-12.EN Standard for Feed Water, Boiler Water and Steam Quality for Power Plants / Industrial Plants (formerly VGB Standard VGB-R-450-Le) and to give recommendations fo Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - ebookVGB-S-014-2011-EN-ebookAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - PrintVGB-S-044-00-2019-05-ENThe VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these re Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - ebookVGB-S-044-00-2019-05-EN-ebookThe VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these re Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
VGB-Richtlinie zur Prüfung von Krananlagen - ebookR631ebookFür eine wirtschaftliche Herstellung und einen einwandfreien Betrieb von Produktionseinrichtungen sind als eine wichtige Voraussetzung eindeutige und umfassende Vereinbarungen über Auslegung, Abmessungen und Errichtung zu treffen. Dies ist Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Thermal Behaviour of Steam Turbines - ebookR105e-ebooklt should always be remembered that placing excessive requirements on the start-up and loading behaviour of turbines will reduce the serve life of certain components . Mention is also made of the gentle mode of operation nowadays possible when suitab Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - PrintVGB-S-831-00-2015-05-ENReplaced by multi-part publication VGBE-S-831; still available for existing installations. The Guideline applies to the entire technical documentation (technical plant data and documents) which is necessary in the performance of projects, e.g. in pl Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - ebookVGB-S-831-00-2015-05-EN-ebookReplaced by multi-part publication VGBE-S-831; still available for existing installations. The Guideline applies to the entire technical documentation (technical plant data and documents) which is necessary in the performance of projects, e.g. in pl Mehr erfahren630,00 €674,10 € Inkl. MwSt.