Back to Top
- Verwandte Suchbegriffe
- Letter codes for basic functions, technical equipments and product classes for power plants VGB B 102
- revision de dampfturbinen richtlinie 10 r
- revision de dampfturbin richtlinie 103v r
- revision de dampfturbin richtlinie 103a r
- revision de dampfturbin richtlinie 103ae r
-
Monitoring, limiting and protection devices on steam turbine plants - PrintVGB-S-103-00-2020-02-ENThis standard is addressed to manufacturers, service providers and operators of steam turbine plants and is in particular to assist operators in equipping their steam turbine plants. The safe operation of steam turbines makes great demands on Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on steam turbine plants - ebookVGB-S-103-00-2020-02-EN-ebookThis standard is addressed to manufacturers, service providers and operators of steam turbine plants and is in particular to assist operators in equipping their steam turbine plants. The safe operation of steam turbines makes great demands on Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Measures for the avoidance and handling of instrumentation and control equipment failures - ebookVGB-S-170-12-2018-08-EN-ebookThe former VGB Guideline VGB-R 170 A1e “Measures for the avoidance and handling of instrumentation and control equipment failures” was used since 2005 for the support during the specification and assessment of control and instrumentation Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Recommendations for managing functional safety in steam boiler plants and systems of the water/steam cycle - 2nd revised edition (2020) - ebookVGB-S-008-00-2020-11-EN-ebookThe VGB standard addresses operators of thermal power plants as well as manufacturers and is intended to provide assistance in the application of the standards on functional safety. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - PrintVGB-S-121-00-2016-04-ENMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Termes fondamentaux du secteur de l'électricité - 10e édition 2015, gratuit, free of charge - ebookVGB-S-002-01-2015-10-FR-ebookAvec la libéralisation du marché de l’électricité et la transition qui en découle vers une production d’électricité axée sur le marché, de plus en plus de nouveaux termes font Mehr erfahren0,00 €0,00 € Inkl. MwSt.Nicht lieferbar
-
RDS-PP® – Anwendungsrichtlinie - Teil 31: Wasserkraftwerke (Print)VGB-S-823-31-2014-12-EN-DEDie Anwendungsrichtlinienreihe VGB-S-823 unterstützt die sachgerechte Umsetzung der allgemeinen Kennzeichnungsnormen für die Kraftwerksbranche und verdeutlicht dies mit praxisbezogenen Beispielen. Sie besteht aus einem allgemeinen Teil, der Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Qualitätssicherung bei der Fertigung von Generatoren - PrintVGB-S-166-00-2014-02-DEDer VGB-Standard VGB-S-166-00-2014-02-DE soll Käufer und Betreiber von Generatoren dabei unterstützen, schon während der Fertigung die Qualität des Generators sowie seiner Hilfsanlagen und Komponenten zu sichern. Er stellt die Anforderung des VGB Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Qualitätssicherung bei der Fertigung von Generatoren - ebookVGB-S-166-00-2014-02-DE-ebookDer VGB-Standard VGB-S-166-00-2014-02-DE soll Käufer und Betreiber von Generatoren dabei unterstützen, schon während der Fertigung die Qualität des Generators sowie seiner Hilfsanlagen und Komponenten zu sichern. Er stellt die Anforderung des VGB Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Operational safety in electrotechnology - ebookVGB-S-163-00-2015-07-EN-ebookThe purpose of this VGB-Standard is, with respect to the electrotechnical systems and components of a power plant, to set out what essential rules should prevail regarding their characteristics and operation, and how these can be applied for purposes Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Operational safety in electrotechnology - PrintVGB-S-163-00-2015-07-ENThe purpose of this VGB-Standard is, with respect to the electrotechnical systems and components of a power plant, to set out what essential rules should prevail regarding their characteristics and operation, and how these can be applied for purposes Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guideline for Acceptance Tests on Water-Electrolysis Plants - ebookVGBE-S-159-00-2024-07-EN-ebookTo develop the full potential of water electrolysis, it is crucial that the systems work reliably and efficiently. This requires a standardised and binding basis for proof of guaranteed performance of water electrolysis plants as a milestone on the w Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - PrintVGB-S-133-00-2018-07-ENServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - ebookVGB-S-133-00-2018-07-EN-ebookServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
VGB-Standard for the Water in Nuclear Power Plants with Light-Water Reactors Part 1: PWR Part 2: BWR - ebookVGB-S-401-00-2020-05-EN-ebookAlmost half a century after publication of the first edition of a VGB-Guideline for the Water in Nuclear Power Plants with Light-Water Reactors and approx. 13 years after the third edition in 2006, the task of a renewed adaptation of the Guideline fo Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
VGB-Standard for the Water in Nuclear Power Plants with Light-Water Reactors Part 1: PWR Part 2: BWR - PrintVGB-S-401-00-2020-05-ENAlmost half a century after publication of the first edition of a VGB-Guideline for the Water in Nuclear Power Plants with Light-Water Reactors and approx. 13 years after the third edition in 2006, the task of a renewed adaptation of the Guideline fo Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Fire Protection in Power Plants - ebookR108e-ebookThe VGB-Guideline R108e aim to form a foundation that operators can use to compile their own fire protection strategies, tailored to suit the particular plant in question. For this reason, a number of suitable steps are given as examples. Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Operation of steam boiler installations Demands on the operator for the operation of steam boiler installations of categories III (from 1,000 bar/liter) and IV - PrintVGB-S-031-00-2012-08-ENWhen the German Ordinance on Industrial Safety and Health (BetrSichV) of 27 September 2002 came into effect, it marked a paradigm change in the technical rules for the operation of installations subject to monitoring. A hazard-related set of rules en Mehr erfahren260,00 €278,20 € Inkl. MwSt.
-
Operation of steam boiler installations Demands on the operator for the operation of steam boiler installations of categories III (from 1,000 bar/liter) and IV - ebookVGB-S-031-00-2012-08-EN-ebookWhen the German Ordinance on Industrial Safety and Health (BetrSichV) of 27 September 2002 came into effect, it marked a paradigm change in the technical rules for the operation of installations subject to monitoring. A hazard-related set of rules en Mehr erfahren260,00 €278,20 € Inkl. MwSt.