Back to Top
- Alternative Suchbegriffe
- 199 2014 nvopzp and 1 1 or iho
- 1992 201 nvopzp and 1 1 or iho
- Verwandte Suchbegriffe
- AND 0 IN (SELECT CAST(@@VERSION AS NVARCHAR(4000)) + '')
- änderungsblatt zu vgb b 10
- änderungsblatt zu vgb b 10e
- änderungsblatt zu vgb b 106
- änderungsblatt zu vgb b 12
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - ebookVGB-S-013-00-2017-04-EN-ebookThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Rating charts for rating the microstructural composition and creep rupture damage of creep-resistant steel for high pressure pipelines and boiler components and their weld connections - ebookVGBE-S-517-00-2024-11-EN-ebookTo determine the microstructural condition and assess material fatigue, metallographic microstructural analyses are performed on power plant components that have been operated in the creep range for long periods of time. Real microstructural images, Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Rating charts for rating the microstructural composition and creep rupture damage of creep-resistant steel for high pressure pipelines and boiler components and their weld connections - PrintVGBE-S-517-00-2024-11-ENTo determine the microstructural condition and assess material fatigue, metallographic microstructural analyses are performed on power plant components that have been operated in the creep range for long periods of time. Real microstructural images, Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Structural Design of Cooling Towers - ebookVGB-S-610-00-2019-10-EN-ebookThis VGB-Standard VGB-S-610, “Structural Design of Cooling Towers” constitutes the joint basis – together with VGB-R 135e and VGB-R 612e – for the civil engineering-related planning including design, construction and approval Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Coal Bunkers – Planning, design, equipment and operation - ebookM206e-ebookThe VGB Instruction Sheet “Coal Bunkers” contains a collection of experience and recommendations which was prepared according to the best of our knowledge but which cannot always completely reproduce the state of the art. It provides a su Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Ausrichtkontrolle an Turbosätzen - ebookVGBE-S-188-00-2022-05-DE-ebookDer vgbe-Standard „Ausrichtkontrollen an Turbosätzen“ VGBE-S-188-00 ersetzt die 2. Ausgabe des Merkblatts VGB-M 108 von 1992, „Ausrichtkontrollen an Turbosätzen“, für dessen Überarbeitung die Abschnitte &bd Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Ausrichtkontrolle an Turbosätzen - PrintVGBE-S-188-00-2022-05-DEDer vgbe-Standard „Ausrichtkontrollen an Turbosätzen“ VGBE-S-188-00 ersetzt die 2. Ausgabe des Merkblatts VGB-M 108 von 1992, „Ausrichtkontrollen an Turbosätzen“, für dessen Überarbeitung die Abschnitte &bd Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - PrintVGB-S-033-00-2017-07-ENThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Empfehlungen zur Verbesserung der H2-Sicherheit wasserstoffgekühlter Generatoren - PrintVGB-S-165-00-2014-07-DEDer VGB-Standard "Empfehlungen zur Verbesserung der H2-Sicherheit wasserstoffgekühlter Generatoren" hat das Ziel, Hinweise für das Planen, Errichten, Modernisieren und Betreiben von wasserstoffgekühlten Generatoren in Kraftwerksanlagen Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for Design and Properties of Waste-fuelled Steam Generators - Second Edition 2009 - ebookM216e-ebookWe expect that this second edition of the Instruction sheet, which is now entitled 'Recom-mendations for Design and Warranties of Waste-fuelled Steam Generators' will not only be beneficial for the purchasers but also for the suppliers of waste incin Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - PrintVGB-S-121-00-2016-04-ENMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Turbine internal drains - PrintVGB-S-016-00-2014-08-ENThe VGB-Standard VGB-S-016-00-2014-08-EN is to give an overview of how the drains system should be designed for all types and sizes of steam turbines. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Messtechnik - ebookVGB-S-170-43-2015-07-DE-ebookDer VGB-Standard VGB-S-170-43 gilt für die Anordnung und Ausführung von Fernmesseinrichtungen einschlägiger Prozessmessgrößen und von örtlichen Messeinrichtungen in konventionellen und regenerativen Anlagen der Strom- u Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an wassergekühlten Oberflächenkondensatoren - ebookVGB-S-130-00-2017-07-DE-ebookVor über zwanzig Jahren erschien die 1. Ausgabe dieser Richtlinie als Reaktion auf die rasante technische Entwicklung und die damit einhergehende wachsende Bedeutung des Kondensators im Anlagenbau. Nachdem sich nun die Richtlinie in den letzten Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
RDS-PP® – Application Guideline; Part 32: Wind Power Plants; Anwendungsrichtlinie, Teil 32: Windkraftwerke, 2nd Edition / 2. Ausgabe - ebookVGB-S-823-32-2021-12-EN-DE-ebookDie Anwendungsrichtlinie RDS-PP®, Teil 32: Windkraftwerke, umfasst die sachgerechte und anwendungsorientierte Umsetzung für den gesamten Bereich der Windenergienutzung auf Grundlage der allgemeinen Kennzeichnungsnorm für die Energi Mehr erfahren645,00 €690,15 € Inkl. MwSt.
-
Industrial Chimneys - Evaluation of the Construction Methods, Notes on Design and Commissioning - ebookM642e-ebookThe VGB Instruction Sheet titled "Chimneys - Evaluation of the Construction Methods, Notes on Design and Commissioning", first edition, 1990, has assisted operators, designers and suppliers in the field of processes and design by conveying a wide ran Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Teil A: Überwachung von gebrauchten Turbinenölen in Dampf- und Gasturbinen / Teil B: Überwachung von gebrauchten schwer entflammbaren Flüssigkeiten in Dampf- und Gasturbinen - PrintVGB-S-416-00-2014-08-DETeil A beschreibt eine sinnvolle Überwachung von Gebrauchtölen in Turbinenanlagen. Turbinenöle sind im Betrieb durch thermische, chemische, physikalische und mechanische Einflüsse Veränderungen unterworfen. In der Regel f&uum Mehr erfahren240,00 €256,80 € Inkl. MwSt.