Back to Top
- Alternative Suchbegriffe
- 108 2012 nvopzp and 1 1 or iso
- 100 2010 nvopzp and 1 1 or iso
- Verwandte Suchbegriffe
- AND 0 IN (SELECT CAST(@@VERSION AS NVARCHAR(4000)) + '')
- änderungsblatt zu vgb b 100
- änderungsblatt zu vgb b 101
- änderungsblatt zu vgb b 10e
- AND 0 IN (SELECT CAST(@@VERSION AS NVARCHAR(4000)) '')
-
Hinweise zur Herstellungs-, Werkstoff- und Prüftechnik von Gussstücken für REA-Suspensionspumpen aus Duplex-Werkstoffen - ebookM502ebookDas vorliegende Merkblatt wurde von einer Arbeitsgruppe des Arbeitskreises "Korrosion von metallischen Komponenten in Rauchgasentschwefelungsanlagen (REA)" im VGBArbeitskreis - Werkstofftechnik konventionell" erarbeitet, wobei die herstellende Indust Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - ebookVGB-S-831-00-2015-05-EN-ebookReplaced by multi-part publication VGBE-S-831; still available for existing installations. (https://shop.vgbe.energy/vgbe-s-831-01-2025-04-de-en-ebook.html) The Guideline applies to the entire technical documentation (technical plant data and docume Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - PrintVGB-S-831-00-2015-05-ENReplaced by multi-part publication VGBE-S-831; still available for existing installations. (https://shop.vgbe.energy/vgbe-s-831-01-2025-04-de-en-ebook.html) The Guideline applies to the entire technical documentation (technical plant data and docume Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Recommendation for Design and Operation of Vacuum Pumps at Steam Turbine Condensers - ebookR126e-ebookDue to the development towards larger outputs in power Stations, it was necessary for the design of air extraction pumps for surface condenser units to keep pace. For this purpose water-, air- or steam ejectors and water ring pumps or combinati Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Leitfaden zur Einführung von Qualitätsmanagementsystemen in EVU - ebookR150ebookDieser Leitfaden soll für alle Lieferungen und Leistungen eines Versorgungsunternehmens eine praxisnahe Interpretation des QM-Regelwerks bieten. Er gibt somit Anregungen und Hilfestellung beim Aufbau eines unternehmensspezifischen QM-System Mehr erfahren80,00 €85,60 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - PrintVGB-S-013-00-2017-04-ENThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - ebookVGB-S-013-00-2017-04-EN-ebookThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Rohre für Kondensatoren und andere Wärmeaustauscher - Kupferlegierungen - ebookR106ebookDie VGB-Richtlinien „Rohre für Kondensatoren und andere Wärmeaustauscher“ sind derzeit in drei Werkstoffgruppen (R 106 „Kupferlegierungen“, R 113 „Nichtrostende Stähle“ und R 114 „Titan“) Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Structural Design of Cooling Towers - PrintVGB-S-610-00-2019-10-ENThis VGB-Standard VGB-S-610, “Structural Design of Cooling Towers” constitutes the joint basis – together with VGB-R 135e and VGB-R 612e – for the civil engineering-related planning including design, construction and approval Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Coal Bunkers – Planning, design, equipment and operation - ebookM206e-ebookThe VGB Instruction Sheet “Coal Bunkers” contains a collection of experience and recommendations which was prepared according to the best of our knowledge but which cannot always completely reproduce the state of the art. It provides a su Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Monitoring concept for oil-cooled transformers in nuclear power plants - ebookM160e-ebookIn order to ensure their high availability, oil-cooled transformers are monitored continuous-ly and subjected to a very wide variety of tests at regular intervals. In an exchange of ex-perience, the operators of all nuclear power plant sites in Germa Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - PrintVGB-S-033-00-2017-07-ENThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Recommendations for Design and Properties of Waste-fuelled Steam Generators - Second Edition 2009 - ebookM216e-ebookWe expect that this second edition of the Instruction sheet, which is now entitled 'Recom-mendations for Design and Warranties of Waste-fuelled Steam Generators' will not only be beneficial for the purchasers but also for the suppliers of waste incin Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Equipment for Cleaning of Heat Transfer Surfaces in Steam Raising Plants - Operation, Maintenance and Expert Systems - PrintVGB-S-221-00-2014-06-ENVery substantial advances have been made over the last couple of years in the field of heat transfer surface cleaning which are included in the present revision of the Standard (cf. first edition). New methods like explosion cleaning are now included Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
RDS-PP® Reference Designation System for Power Plants - Letter Code for Power Plant Systems (System Key) - Excel-table (English edition)RDS-PP-EXCEL-ENThe basic international standards for reference designation provide users with gen-erally applicable general rules and letter codes for main classes for the designation of technical objects and their documentation. The standard for power plants esta Mehr erfahren2.950,00 €3.156,50 € Inkl. MwSt.
-
KKS Kraftwerk-Kennzeichensystem - Schlüsselteil: Funktionsschlüssel, Aggregateschlüssel, Betriebsmittelschlüssel - als Excel-Liste (Deutschsprachige Ausgabe)KKS-Basis-EXCEL-DEDurch den nationalen und internationalen Normungsprozess wird das Kraftwerk-Kennzeichen-System (nachfolgend KKS) durch das, auf DIN ISO 81346-10 basierende RDS-PP®, abgelöst. RDS-PP® gilt damit „als anerkannte Regel der Technik&ldq Mehr erfahren2.950,00 €3.156,50 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an wassergekühlten Oberflächenkondensatoren - ebookVGB-S-130-00-2017-07-DE-ebookVor über zwanzig Jahren erschien die 1. Ausgabe dieser Richtlinie als Reaktion auf die rasante technische Entwicklung und die damit einhergehende wachsende Bedeutung des Kondensators im Anlagenbau. Nachdem sich nun die Richtlinie in den letzten Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Tubes for Condensers and other Heat Exchangers for the Operation of Steam Turbine Plants - Copper Alloys - ebookR106e-ebookThe "Tubes for condensers and other heat exchangers for the operation of steam turbine plants" guidelines are currently split into three material groups (VGB-R 106e "Copper Alloys", VGB-R 113e "Stainless Steels" and VGB-R 114e "Titanium"). The guidel Mehr erfahren140,00 €149,80 € Inkl. MwSt.