Back to Top
- Alternative Suchbegriffe
- analysis of fgd gypsum vgb m 701e 2023
- analysis of fgd gypsum vgb m 701e 2024
- Verwandte Suchbegriffe
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2:
- vgb r 10 anhang 3
- vgb r 10 anlag 3
- vgb r 12 anhang 3
- vgb r 12 anlag 3
-
Fire Protection in Onshore Wind Turbines - PrintVGB-S-017-00-2018-09-ENFire-fighting operations by fire brigades in onshore wind turbines are almost impossible because of their height and resulting difficulty of accessing them. For this reason, fire prevention, early detection and early fighting of a fire, and the self- Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Fire Protection in Onshore Wind Turbines - ebookVGB-S-017-00-2018-09-EN-ebookFire-fighting operations by fire brigades in onshore wind turbines are almost impossible because of their height and resulting difficulty of accessing them. For this reason, fire prevention, early detection and early fighting of a fire, and the self- Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - ebookVGB-S-026-00-2013-04-EN-ebookThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - PrintVGB-S-026-00-2013-04-ENThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
KKS Pocketbook, English, 4th edition - PrintVGBE-S-811-91-2021-12-EN/VGB-B-105-007.4eThe 4th edition of the KKS Pocketbook (KKS - Kraftwerk-Kennzeichensystem/Identification System for Power Stations) for conventional, nuclear, renewable energy plants, storage and power-2-x has been published as update VGBE-S-811-91-2021-09-EN.The 201 Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Termes fondamentaux du secteur de l'électricité - 10e édition 2015, gratuit, free of charge - ebookVGB-S-002-01-2015-10-FR-ebookAvec la libéralisation du marché de l’électricité et la transition qui en découle vers une production d’électricité axée sur le marché, de plus en plus de nouveaux termes font Mehr erfahren0,00 €0,00 € Inkl. MwSt.Nicht lieferbar
-
Monitoring concept for oil-cooled transformers in nuclear power plants - ebookM160e-ebookIn order to ensure their high availability, oil-cooled transformers are monitored continuous-ly and subjected to a very wide variety of tests at regular intervals. In an exchange of ex-perience, the operators of all nuclear power plant sites in Germa Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - PrintVGB-S-121-00-2016-04-ENMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Maintenance-compatible documentation - ebookVGB-S-029-S-00;2012-03-EN-ebookMaintenance of conventional power generation facilities is increasingly required to meet demands for maximum cost-effectiveness together, wherever possible, with rising quality. The industrial health and safety regulations require operators to take o Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Maintenance-compatible documentation - PrintVGB-S-029-S-00;2012-03-ENMaintenance of conventional power generation facilities is increasingly required to meet demands for maximum cost-effectiveness together, wherever possible, with rising quality. The industrial health and safety regulations require operators to take o Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
RDS-PP® – Anwendungsrichtlinie - Teil 31: Wasserkraftwerke (Print)VGB-S-823-31-2014-12-EN-DEDie Anwendungsrichtlinienreihe VGB-S-823 unterstützt die sachgerechte Umsetzung der allgemeinen Kennzeichnungsnormen für die Kraftwerksbranche und verdeutlicht dies mit praxisbezogenen Beispielen. Sie besteht aus einem allgemeinen Teil, der Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Guideline for Acceptance Tests on Water-Electrolysis Plants - ebookVGBE-S-159-00-2024-07-EN-ebookTo develop the full potential of water electrolysis, it is crucial that the systems work reliably and efficiently. This requires a standardised and binding basis for proof of guaranteed performance of water electrolysis plants as a milestone on the w Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Guidelines for Ordering High-capacity Steam Boilers - ebookR101e-ebookThis guideline R 101 He gives guidance on writing the technical and commercial contract terms for the procurement of water tube boilers for use in electricity generating stations (power stations). Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
RDS-PP® Pocketbook, English, 2nd edition - PrintVGBE-S-821-91-2021-12-ENThe 2nd edition of the RDS-PP Pocketbook for conventional, nuclear, renewable energy plants, storage and power-2-x has been published as update VGBE-S-821-91-2021-09-EN.The 2019/11 additions to the system key are taken into account. The RDS-PP Pocket Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 01: Kraftwerke, Allgemein RDS-PP Application Guideline Part 01: Power Plants, General - PrintVGB-S-823-01-2015-09-EN-DEDie Anwendungsrichtlinienreihe VGB-S-823 unterstützt die sachgerechte Umsetzung der allgemeinen Kennzeichnungsnormen für die Kraftwerksbranche und verdeutlicht dies mit praxisbezogenen Beispielen. Sie besteht aus einem allgemeinen Teil, der Mehr erfahren585,00 €625,95 € Inkl. MwSt.
-
Lernzielkontrollen in der Aus- und Weiterbildung von Kernkraftwerkspersonal - PrintVGB-S-028-00-2012-03-DELernzielkontrollen sollen grundsätzlich fester Bestandteil jeder Schulungsmaßnahme sein. Deshalb richtet sich dieser VGB-Standard an die Ausbilder/Referenten, die Lernenden und das für die Schulungsmaßnahme verantwortliche Personal. Bei der Erst Mehr erfahren65,00 €69,55 € Inkl. MwSt.
-
Lernzielkontrollen in der Aus- und Weiterbildung von Kernkraftwerkspersonal - ebookVGB-S-028-00-2012-03-DE-ebookLernzielkontrollen sollen grundsätzlich fester Bestandteil jeder Schulungsmaßnahme sein. Deshalb richtet sich dieser VGB-Standard an die Ausbilder/Referenten, die Lernenden und das für die Schulungsmaßnahme verantwortliche Personal. Bei der Erst Mehr erfahren65,00 €69,55 € Inkl. MwSt.