Oil system cleaning for gas and steam turbine plants - PrintVGB-S-030-00-2013-06-ENBy collecting and evaluating the vast experience gained during the operation, installation, modification and revision of gas and steam turbine oil plants and incorporating them into this VGB-Standard, the intention is to contribute to the operational Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Guideline for the Testing of DeNOx-catalysts - ebookVGB-S-302-00-2013-04-EN-ebookThe purpose of this VGB-Standard is to manifest a testing procedure, which can be employed by catalyst manufacturers, SCR equipment suppliers, power plant operatorsand independent testing institutions for determining the characteristics of SCR c Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - PrintVGB-S-169-11-2015-11-ENThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - ebookVGB-S-169-11-2015-11-EN-ebookThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - PrintVGB-S-115-00-2016-01-ENThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - ebookVGB-S-115-00-2016-01-EN-ebookThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - PrintVGB-S-131-00-2017-07-ENThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - ebookVGB-S-131-00-2017-07-EN-ebookThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Internal Cleaning of Water-Tube Steam Generating Plants and Associated Pipework - PrintVGB-S-513-00-2014-07-ENThe VGB-Standard shall apply to the cleaning of newly erected steam boiler plants and associated pipework, but, where required, e.g. after longer operational periods, it shall also apply to major repairs and inspections as well as in the case of othe Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Preservation of Power Plants - PrintS-116-00-2016-04-ENThe VGB-Standard VGB-S116 shall apply to plants for firing fossil fuels and plants for firing substitute fuels. This standard comprises all essential process systems which are to be considered during plant outage or shutdown and have to be preserved. Mehr erfahren450,00 €481,50 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - PrintVGB-S-013-00-2017-04-ENThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - ebookVGB-S-013-00-2017-04-EN-ebookThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - PrintVGB-S-044-00-2019-05-ENThe VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these re Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - ebookVGB-S-044-00-2019-05-EN-ebookThe VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these re Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Preservation of Power Plants - ebookVGB-S-116-00-2016-04-EN-ebookThe VGB-Standard VGB-S116 shall apply to plants for firing fossil fuels and plants for firing substitute fuels. This standard comprises all essential process systems which are to be considered during plant outage or shutdown and have to be preserved. Mehr erfahren450,00 €481,50 € Inkl. MwSt.
-
Process Quality in Power Engineering - PrintVGB-S-012-00-2016-02-ENIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Operational safety in electrotechnology - ebookVGB-S-163-00-2015-07-EN-ebookThe purpose of this VGB-Standard is, with respect to the electrotechnical systems and components of a power plant, to set out what essential rules should prevail regarding their characteristics and operation, and how these can be applied for purposes Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Operational safety in electrotechnology - PrintVGB-S-163-00-2015-07-ENThe purpose of this VGB-Standard is, with respect to the electrotechnical systems and components of a power plant, to set out what essential rules should prevail regarding their characteristics and operation, and how these can be applied for purposes Mehr erfahren240,00 €256,80 € Inkl. MwSt.