Back to Top
- Alternative Suchbegriffe
- 12 2014 nvopzp and 1 1 or is
- 12 201 nvopzp and 1 1 or iks
- Verwandte Suchbegriffe
- AND 0 IN (SELECT CAST(@@VERSION AS NVARCHAR(4000)) + '')
- änderungsblatt zu vgb b 10
- änderungsblatt zu vgb b 106
- änderungsblatt zu vgb b 12e
- änderungsblatt zu vgb b 12
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - PrintVGB-S-013-00-2017-04-ENThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - ebookVGB-S-013-00-2017-04-EN-ebookThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - PrintVGB-S-504-00-2015-12-ENSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - ebookVGB-S-504-00-2015-12-EN-ebookSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Structural Design of Cooling Towers - ebookVGB-S-610-00-2019-10-EN-ebookThis VGB-Standard VGB-S-610, “Structural Design of Cooling Towers” constitutes the joint basis – together with VGB-R 135e and VGB-R 612e – for the civil engineering-related planning including design, construction and approval Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - PrintVGB-S-033-00-2017-07-ENThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Empfehlungen zur Verbesserung der H2-Sicherheit wasserstoffgekühlter Generatoren - PrintVGB-S-165-00-2014-07-DEDer VGB-Standard "Empfehlungen zur Verbesserung der H2-Sicherheit wasserstoffgekühlter Generatoren" hat das Ziel, Hinweise für das Planen, Errichten, Modernisieren und Betreiben von wasserstoffgekühlten Generatoren in Kraftwerksanlagen Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
RDS-PP® – Anwendungsrichtlinie - Teil 31: Wasserkraftwerke (Print)VGB-S-823-31-2014-12-EN-DEDie Anwendungsrichtlinienreihe VGB-S-823 unterstützt die sachgerechte Umsetzung der allgemeinen Kennzeichnungsnormen für die Kraftwerksbranche und verdeutlicht dies mit praxisbezogenen Beispielen. Sie besteht aus einem allgemeinen Teil, der Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - PrintVGB-S-121-00-2016-04-ENMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Messtechnik - ebookVGB-S-170-43-2015-07-DE-ebookDer VGB-Standard VGB-S-170-43 gilt für die Anordnung und Ausführung von Fernmesseinrichtungen einschlägiger Prozessmessgrößen und von örtlichen Messeinrichtungen in konventionellen und regenerativen Anlagen der Strom- u Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Turbine internal drains - PrintVGB-S-016-00-2014-08-ENThe VGB-Standard VGB-S-016-00-2014-08-EN is to give an overview of how the drains system should be designed for all types and sizes of steam turbines. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an wassergekühlten Oberflächenkondensatoren - ebookVGB-S-130-00-2017-07-DE-ebookVor über zwanzig Jahren erschien die 1. Ausgabe dieser Richtlinie als Reaktion auf die rasante technische Entwicklung und die damit einhergehende wachsende Bedeutung des Kondensators im Anlagenbau. Nachdem sich nun die Richtlinie in den letzten Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Avoidance of generator damage resulting from condensation on live parts - ebookVGB-S-164-12-2016-10-EN-ebookThe moisture contained in gaseous substances condenses on impact with colder surfaces to a greater of lesser extent, depending on the ambient conditions and in particular on pressure and temperature. If this occurs in the area of non-insulated electr Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Measures for the avoidance and handling of instrumentation and control equipment failures - ebookVGB-S-170-12-2018-08-EN-ebookThe former VGB Guideline VGB-R 170 A1e “Measures for the avoidance and handling of instrumentation and control equipment failures” was used since 2005 for the support during the specification and assessment of control and instrumentation Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an wassergekühlten Oberflächenkondensatoren - PrintVGB-S-130-00-2017-07-DEVor über zwanzig Jahren erschien die 1. Ausgabe dieser Richtlinie als Reaktion auf die rasante technische Entwicklung und die damit einhergehende wachsende Bedeutung des Kondensators im Anlagenbau. Nachdem sich nun die Richtlinie in den letzten Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Teil A: Überwachung von gebrauchten Turbinenölen in Dampf- und Gasturbinen / Teil B: Überwachung von gebrauchten schwer entflammbaren Flüssigkeiten in Dampf- und Gasturbinen - PrintVGB-S-416-00-2014-08-DETeil A beschreibt eine sinnvolle Überwachung von Gebrauchtölen in Turbinenanlagen. Turbinenöle sind im Betrieb durch thermische, chemische, physikalische und mechanische Einflüsse Veränderungen unterworfen. In der Regel f&uum Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Fire and Explosion Protection in Biomass Power Plants - PrintVGB-S-018-00-2013-12-ENThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.