Back to Top
- Alternative Suchbegriffe
- s 01 00 201 12
- s 01 00 215 12
- Verwandte Suchbegriffe
- 2015 12 en
- 2015 00
- 2015 de
- 2015 heat 8
- 2015 08 de
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - ebookVGB-S-013-00-2017-04-EN-ebookThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - PrintVGB-S-044-00-2019-05-ENThe VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these re Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - ebookVGB-S-044-00-2019-05-EN-ebookThe VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these re Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Auswahl von Mess- und Probenahmeleitungen für die Wasser- und Dampfbereiche im Wärmekraftwerk - PrintVGB-S-170-R-41;2012-07.DEDieser VGB-Standard wurde aufgestellt, um die Auslegung von Mess- und Analyse-/ Entnahmeleitungen an die erhöhten Dampfparameter und die aktualisierten Zeitstandkennwerte anzupassen. Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Auswahl von Mess- und Probenahmeleitungen für die Wasser- und Dampfbereiche im Wärmekraftwerk - ebookVGB-S-170-R-41;2012-07.DE-ebookDieser VGB-Standard wurde aufgestellt, um die Auslegung von Mess- und Analyse-/ Entnahmeleitungen an die erhöhten Dampfparameter und die aktualisierten Zeitstandkennwerte anzupassen. Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Process Quality in Power Engineering - PrintVGB-S-012-00-2016-02-ENIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Entnahmestellen für verfahrenstechnische Messungen an wasser- und dampfführenden Systemen - Ausführung, Auswahl und Auslegung - PrintVGB-S-170-42-2014-08-DEDer VGB-Standard wurde aufgestellt, um die konstruktive Ausbildung der Entnahmestellen für verfahrenstechnische Messungen an wasser- und dampfführenden Systemen zu vereinheitlichen, die Anforderungen zu spezifizieren und den Austausch von S Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Process Quality in Power Engineering - ebookVGB-S-012-00-2016-02-EN-ebookIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Type, Operation and Maintenance of Flue Gas Desulphurisation Plants (FGD) - PrintVGB-S-015-2011-ENThis VGB-Standard deals with flue gas desulphurisation (FGD) in large combustion plants. At this point, no additive processes, which can be employed in combustion, are considered. Here, only plants downstream of combustion are considered. The aim of Mehr erfahren160,00 €171,20 € Inkl. MwSt.
-
Selection of impulse pipes and sampling lines for water and steam sectors in thermal power stations - ebookVGB-S-170-R-41;2012-07.EN-ebookThis VGB-Standard was created to adapt the design of measurement and analytical/ discharge lines to the increased steam parameters and the updated long-term parameters. Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Prequalification of Partner Companies for High-Quality Maintenance - PrintVGB-S-040-00-2017-03-ENThis VGB-Standard for the prequalification of external/partner companies serves to ensure the quality expected or demanded by the client. The market situation forces the contractors (manufacturers and fabricators) to offer their products and service Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Type, Operation and Maintenance of Flue Gas Desulphurisation Plants (FGD) - ebookVGB-S-015-2011-EN-ebookThis VGB-Standard deals with flue gas desulphurisation (FGD) in large combustion plants. At this point, no additive processes, which can be employed in combustion, are considered. Here, only plants downstream of combustion are considered. The aim of Mehr erfahren160,00 €171,20 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - PrintVGB-S-121-00-2016-04-ENMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - PrintVGB-S-014-2011-ENAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Einphasig gekapselte Generatorableitung - PrintVGB-S-164-13-2021-03-DEDie in der VGB-Fachgruppe „Elektrische Maschinen und Anlagen“ vertretenen Betreiber veranlassten die Bildung einer Projektgruppe „Generatorableitung“, um konkrete Vorgaben für Auslegung, Errichtung, Modifizierung, Betrieb Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Heat exchangers and boilers in the steam-water cycle of thermal power plants - ebookVGB-S-110-R-00;2012-07.EN-ebookThis VGB standard is intended to enhance the service performance (equipment availability) of heat exchangers and boilers in the water/steam cycle of thermal power stations. The VGB standard consists of a general section for the order and a technical Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - ebookVGB-S-014-2011-EN-ebookAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Einphasig gekapselte Generatorableitung - ebookVGB-S-164-13-2021-03-DE-ebookDie in der VGB-Fachgruppe „Elektrische Maschinen und Anlagen“ vertretenen Betreiber veranlassten die Bildung einer Projektgruppe „Generatorableitung“, um konkrete Vorgaben für Auslegung, Errichtung, Modifizierung, Betrieb Mehr erfahren300,00 €321,00 € Inkl. MwSt.