Back to Top
- Alternative Suchbegriffe
- s 01 00 2014 12
- s 013 00 2023 12
-
Process Quality in Power Engineering - PrintVGB-S-012-00-2016-02-ENIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Qualitätsanforderungen für Mineralöle in Leistungstransformatoren - ebookVGB-S-169-11-2015-11-DE-ebookZielsetzung des VGB-Standards ist es, die erforderlichen Qualitätskriterien für die gesamten Fertigungsprozesse bis einschließlich der Inbetriebsetzung sicher zu stellen. Er soll ein pragmatisches Hilfsmittel für die Anwender sei Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - PrintVGB-S-169-11-2015-11-ENThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Process Quality in Power Engineering - ebookVGB-S-012-00-2016-02-EN-ebookIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Type, Operation and Maintenance of Flue Gas Desulphurisation Plants (FGD) - PrintVGB-S-015-2011-ENThis VGB-Standard deals with flue gas desulphurisation (FGD) in large combustion plants. At this point, no additive processes, which can be employed in combustion, are considered. Here, only plants downstream of combustion are considered. The aim of Mehr erfahren160,00 €171,20 € Inkl. MwSt.
-
Selection of impulse pipes and sampling lines for water and steam sectors in thermal power stations - ebookVGB-S-170-R-41;2012-07.EN-ebookThis VGB-Standard was created to adapt the design of measurement and analytical/ discharge lines to the increased steam parameters and the updated long-term parameters. Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Basic Terms of the Electric Utility Industry, 11th edition, free of charge - ebookVGB-S-002-01-2019-05-EN-ebookAs a result of the now almost global energy transition and the associated requirements for the ever-increasing regulation of the markets while securing competition, the number of terms used and their definitions continues to increase. In&nb Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - ebookVGB-S-169-11-2015-11-EN-ebookThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Prequalification of Partner Companies for High-Quality Maintenance - PrintVGB-S-040-00-2017-03-ENThis VGB-Standard for the prequalification of external/partner companies serves to ensure the quality expected or demanded by the client. The market situation forces the contractors (manufacturers and fabricators) to offer their products and service Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Termes fondamentaux du secteur de l'électricité - 10e édition 2015, gratuit, free of charge - ebookVGB-S-002-01-2015-10-FR-ebookAvec la libéralisation du marché de l’électricité et la transition qui en découle vers une production d’électricité axée sur le marché, de plus en plus de nouveaux termes font Mehr erfahren0,00 €0,00 € Inkl. MwSt.Nicht lieferbar
-
Type, Operation and Maintenance of Flue Gas Desulphurisation Plants (FGD) - ebookVGB-S-015-2011-EN-ebookThis VGB-Standard deals with flue gas desulphurisation (FGD) in large combustion plants. At this point, no additive processes, which can be employed in combustion, are considered. Here, only plants downstream of combustion are considered. The aim of Mehr erfahren160,00 €171,20 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - PrintVGB-S-121-00-2016-04-ENMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - PrintVGB-S-014-2011-ENAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Einphasig gekapselte Generatorableitung - PrintVGB-S-164-13-2021-03-DEDie in der VGB-Fachgruppe „Elektrische Maschinen und Anlagen“ vertretenen Betreiber veranlassten die Bildung einer Projektgruppe „Generatorableitung“, um konkrete Vorgaben für Auslegung, Errichtung, Modifizierung, Betrieb Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Qualitätsanforderungen für Mineralöle in Leistungstransformatoren - PrintVGB-S-169-11-2015-11-DEZielsetzung des VGB-Standards ist es, die erforderlichen Qualitätskriterien für die gesamten Fertigungsprozesse bis einschließlich der Inbetriebsetzung sicher zu stellen. Er soll ein pragmatisches Hilfsmittel für die Anwender sei Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Heat exchangers and boilers in the steam-water cycle of thermal power plants - ebookVGB-S-110-R-00;2012-07.EN-ebookThis VGB standard is intended to enhance the service performance (equipment availability) of heat exchangers and boilers in the water/steam cycle of thermal power stations. The VGB standard consists of a general section for the order and a technical Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - ebookVGB-S-014-2011-EN-ebookAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Einphasig gekapselte Generatorableitung - ebookVGB-S-164-13-2021-03-DE-ebookDie in der VGB-Fachgruppe „Elektrische Maschinen und Anlagen“ vertretenen Betreiber veranlassten die Bildung einer Projektgruppe „Generatorableitung“, um konkrete Vorgaben für Auslegung, Errichtung, Modifizierung, Betrieb Mehr erfahren300,00 €321,00 € Inkl. MwSt.