Back to Top
- Alternative Suchbegriffe
- 10 00 2023 01 en
- 10e 00 2023 01 en
- Verwandte Suchbegriffe
- 100 210 nvopzp and 1 1 or is
- 100 2015 nvopzp and 1 1 or is
- 100 2016 nvopzp and 1 1 or is
- 100 2024 nvopzp and 1 1 or is
- 100 2012 nvopzp and 1 1 or is
-
Failures and Forced Unavailability of Power Plants (Henk C. Wels, print) - PrintB035Power plants are not functioning to the fullest 100 % of the time. Maintenance and inspection of some components require them to be off-line in time, however, this can be planned such that customers continue receiving power from the electrical grid, Mehr erfahren48,00 €51,36 € Inkl. MwSt.
-
Failures and Forced Unavailability of Power Plants Henk C. Wels, - ebookB035ebookPower plants are not functioning to the fullest 100 % of the time. Maintenance and inspection of some components require them to be off-line in time, however, this can be planned such that customers continue receiving power from the electrical grid, Mehr erfahren48,00 €51,36 € Inkl. MwSt.
-
KKS Pocketbook, Deutsch, 4. Auflage - PrintVGBE-S-811-91-2021-12-DE - VGB-B-105-007.4Das KKS-Pocketbook (KKS - Kraftwerk-Kennzeichensystem) für konventionelle, nukleare und erneuerbare Energieanlagen sowie Speicher und Power-2-X ist in 4. Auflage als Aktualisierung VGBE-S-811-91-2021-12-DE erschienen. Berücksichtigt sind di Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
KKS Pocketbook, English, 4th edition - PrintVGBE-S-811-91-2021-12-EN/VGB-B-105-007.4eThe 4th edition of the KKS Pocketbook (KKS - Kraftwerk-Kennzeichensystem/Identification System for Power Stations) for conventional, nuclear, renewable energy plants, storage and power-2-x has been published as update VGBE-S-811-91-2021-09-EN.The 201 Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Band 08: Kohlecharakterisierung und Kohleverbrennung - PrintB008NEUAUFLAGE Kohlecharakterisierung und Kohleverbrennung Kohle als Brennstoff, Physik und Theorie der Kohleverbrennung Von Professor Dr.-Ing. Jacek Zelkowski 2. Ausgabe 2004; DIN C5; ~ 500 Seiten, mehr als 350 Bilder und Tafeln Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Reliability indicators with KISSY new data 2009 to 2020 - A vgbe & DNV project - ebookDNV-VGBE-23-0027Failures in power plants can be costly and efforts should be directed to prevent such events. Methods using Reliability Availability Maintainability (RAM) tools are well known to answer questions on target values for reliability and availability of a Mehr erfahren500,00 €535,00 € Inkl. MwSt.