Back to Top
- Alternative Suchbegriffe
- industry guide 2024
- industry guide 201
- Verwandte Suchbegriffe
- Guideline da VGB PowerTech Alemã VBG-B 107 “Abbreviation Catalogue for Power Plant Engineering
- Guideline Acceptance Test Measurements and Operation Monitoring of Air-Cooled Condensers under Vacuum
- guideline for acceptance tests on water electrolysis plants (VGBE-S-159-00-2024-07-DE)
- Guideline for Acceptance Tests on Water-Electrolysis Plants - Print
- guideline for acceptance tests on water electrolysis plants print
-
An Engineer‘s Guide to Desalination (Joachim Gebel and Süleyman Yüce) - PrintB030An Engineer‘s Guide to Desalination Joachim Gebel, PhD, and Süleyman Yüce, PhD Within the next years keywords such as water scarcity, water pollution and water aid projects will become more and more familiar to the broad public as well as put int Mehr erfahren176,64 €189,00 € Inkl. MwSt.
-
Guide for the Procurement of Steam Turbine Plants - PrintVGB-S-145-00-2015-11-ENThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Guide for the Procurement of Steam Turbine Plants - ebookVGB-S-145-00-2015-11-EN-ebookThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
RDS-PP® – Application Guideline; Part 32: Wind Power Plants; Anwendungsrichtlinie, Teil 32: Windkraftwerke, 2nd Edition / 2. Ausgabe - ebookVGB-S-823-32-2021-12-EN-DE-ebookDie Anwendungsrichtlinie RDS-PP®, Teil 32: Windkraftwerke, umfasst die sachgerechte und anwendungsorientierte Umsetzung für den gesamten Bereich der Windenergienutzung auf Grundlage der allgemeinen Kennzeichnungsnorm für die Energi Mehr erfahren645,00 €690,15 € Inkl. MwSt.
-
RDS-PP® – Application Guideline; Part 32: Wind Power Plants; Anwendungsrichtlinie, Teil 32: Windkraftwerke, 2nd Edition / 2. Ausgabe - PrintVGB-S-823-32-2021-12-EN-DEDie Anwendungsrichtlinie RDS-PP®, Teil 32: Windkraftwerke, umfasst die sachgerechte und anwendungsorientierte Umsetzung für den gesamten Bereich der Windenergienutzung auf Grundlage der allgemeinen Kennzeichnungsnorm für die Energiebran Mehr erfahren645,00 €690,15 € Inkl. MwSt.
-
Verfügbarkeit von Kraftwerken 2014 - 2023, Ausgabe 2024 (KISSY Datenbank-Auswertung) - ebookVGBE-TW-103V-2024-ebookMit dem Ziel, den Betrieb von Kraftwerksanlagen und die Anlagen selbst zu bewerten, zu vergleichen und zu optimieren, sammelt vgbe/VGB seit 1970 nach einheitlichen Definitionen und Ermittlungsverfahren Daten über die Verfügbarkeit und Ausnutzung vo Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Availability of Power Plants 2014 – 2023, Edition 2024 (KISSY database evaluation) - ebookVGBE-TW-103Ve-2024-ebookSince 1970 vgbe/VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2024) presents the analysis about availability and u Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Basic Terms of the Electric Utility Industry, 11th edition, free of charge - ebookVGB-S-002-01-2019-05-EN-ebookAs a result of the now almost global energy transition and the associated requirements for the ever-increasing regulation of the markets while securing competition, the number of terms used and their definitions continues to increase. In&nb Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Analyse der Nichtverfügbarkeit von Kraftwerken 2014 – 2023, Ausgabe 2024 (KISSY Datenbank-Auswertung) - ebookVGBE-TW-103A-2024-ebookMit dem Ziel, den Betrieb von Kraftwerksanlagen und die Anlagen selbst zu bewerten, zu vergleichen und zu optimieren, sammelt VGB seit 1970 nach einheitlichen Definitionen und Ermittlungsverfahren Daten über die Verfügbarkeit und Ausnutzung von Kra Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Analysis of Unavailability of Power Plants 2014 – 2023, Edition 2024 (KISSY database evaluation) - ebookVGBE-TW-103Ae-2024-ebookSince 1970 vgbe/VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2024) presents the analysis about unavailability of Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Empfehlungen zum Betrieb und zur Überwachung von Kesselumwälzpumpen - Basierend auf den umfangreichen Nachuntersuchungen zum Schadensereignis 2014 - ebookTW530ebookAm 12. Mai 2014 kam es im kohlebefeuerten, überkritisch betriebenen 510 MWel Steinkohlekraftwerk Staudinger Block 5 zum Versagen des drucktragenden Gehäuses einer Kesselumwälzpumpe (KUP), das zu erheblichen Schäden im Kraftwerk f& Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Empfehlungen zum Betrieb und zur Überwachung von Kesselumwälzpumpen - Basierend auf den umfangreichen Nachuntersuchungen zum Schadensereignis 2014 - PrintTW530Am 12. Mai 2014 kam es im kohlebefeuerten, überkritisch betriebenen 510 MWel Steinkohlekraftwerk Staudinger Block 5 zum Versagen des drucktragenden Gehäuses einer Kesselumwälzpumpe (KUP), das zu erheblichen Schäden im Kraftwerk f& Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Recommendations for the operation and monitoring of boiler circulating pumps - Based on extensive follow-up examinations relating to the damage event in 2014 - ebookTW530e-ebookOn 12th May 2014 the pressure casing of a boiler circulating pump (BCP) in the hard coal-fired supercritical power station Staudinger, unit 5, failed which led to considerable damage in the power plant [1/1]. As is customary following such severe dam Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - PrintVGB-S-169-11-2015-11-ENThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - ebookVGB-S-169-11-2015-11-EN-ebookThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Zentrale Zuverlässigkeits- und Ereignisdatenbank - Zuverlässigkeitskenngrößen für Kernkraftwerkskomponenten (2015, Stand: 2014-12) - ebookTW805-15-ebookDie Zentrale Zuverlässigkeits- und Ereignisdatenbank (ZEDB) stellt Zuverlässigkeitsdaten für die probabilistischen Sicherheitsanalysen (PSA) bereit, die die Betreiber von Kernkraftwerke durchführen bzw. fortschreiben. In dieser Da Mehr erfahren999,00 €1.068,93 € Inkl. MwSt.
-
Design Standards for Instrumentation and Control Equipment (B0 to B6) - ebookR170(B0-B6)e-ebookSections B1 to B6, present as a collection of data in VGB guideline VGB R 170 B, are to be understood as a catalogue of requirements for the specification of and/or the terms of reference for instrumentation and control equipment projects. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Application of data reconciliation in accordance with VDI 2048 - PrintVGB-S-009-S-00;2012-03.ENData reconciliation is frequently discussed in connection with IT systems for optimization of technical processes in industry. Data reconciliation as set out in VDI 2048 is indeed an interesting and technically complex process with which the quality Mehr erfahren190,00 €203,30 € Inkl. MwSt.