Back to Top
- Alternative Suchbegriffe
- kks and 864 978 and plant plant
- Verwandte Suchbegriffe
- 978 3 86875 2010 2
- 978 3 86875 00 5
- 978 3 86875 07 5
- 978 3 96284 2010 1
- 978 3 96284 268 0 print
-
Industrial Chimneys - Evaluation of the Construction Methods, Notes on Design and Commissioning - ebookM642e-ebookThe VGB Instruction Sheet titled "Chimneys - Evaluation of the Construction Methods, Notes on Design and Commissioning", first edition, 1990, has assisted operators, designers and suppliers in the field of processes and design by conveying a wide ran Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - ebookVGB-S-033-00-2017-07-EN-ebookThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - ebookVGB-S-130-00-2017-07-EN-ebookMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Guideline for the Inspection and Evaluation of In-Service Rotors and Casings of Steam and Gas Turbine Generator Sets - ebookR512e-ebookThe necessity of uniformly representing the inspection and evaluation of inservice components in due consideration of damage reported as well as the improvement of manufacturing technology and examination techniques led to the establishment of this g Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - ebookVGB-S-115-00-2016-01-EN-ebookThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - ebookVGB-S-042-00-2018-01-EN-ebookThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
VGB-Standard for the Water in Nuclear Power Plants with Light-Water Reactors Part 1: PWR Part 2: BWR - ebookVGB-S-401-00-2020-05-EN-ebookAlmost half a century after publication of the first edition of a VGB-Guideline for the Water in Nuclear Power Plants with Light-Water Reactors and approx. 13 years after the third edition in 2006, the task of a renewed adaptation of the Guideline fo Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
KKS-Anwendungs-Erläuterungen - ebookB106-ebookDie Erläuterungen zeigen die vielfältigen Möglichkeiten des KKS, die unterschiedlichen Kennzeichnungsbedürfnisse der Fachbereiche zu erfüllen. Entsprechend diesen Bedürfnissen sind auch die Erläuterungen aufgebaut. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Measures for the avoidance and handling of instrumentation and control equipment failures - ebookVGB-S-170-12-2018-08-EN-ebookThe former VGB Guideline VGB-R 170 A1e “Measures for the avoidance and handling of instrumentation and control equipment failures” was used since 2005 for the support during the specification and assessment of control and instrumentation Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Particularities of Fire Protection of Waste to Energy Plants - ebookVGB-S-217-00-2012-11-EN-ebookWith this VGB-Standard options are demonstrated to reduce fire hazards by constructional means and to respond to them by appropriate procedures, to detect a fire that has already started as soon as possible, and to fight the fire effectively taking i Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Soft Rubber Linings in Flue Gas Desulphurization Test Procedures to Determine Suitability testing Criteria and Standard Values for the Assessment of Service Life - ebookM417e-ebookThis Instruction Sheet is subdivided into two sections. The first section describes the test procedures employed to determine the suitability of soft rubber linings in flue gas desulphurization plants while the second section deals with the testing c Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Equipment for Cleaning of Heat Transfer Surfaces in Steam Raising Plants - Operation, Maintenance and Expert Systems - ebookVGB-S-221-00-2014-06-EN-ebookVery substantial advances have been made over the last couple of years in the field of heat transfer surface cleaning which are included in the present revision of the Standard (cf. first edition). New methods like explosion cleaning are now included Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - ebookVGBE-S-455-00-2022-12-EN-ebookThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - ebookVGB-S-170-42-2014-08-EN-eBookThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
KKS Begriffszuordnungsliste zum Aggregate- und Betriebsmittelschlüssel (Deutsch) - ebookB105.1-ebookDie Sprache der Kraftwerkstechnik kennt für Aggregate, Komponenten, Einrichtungen, Geräte unterschiedliche Begriffe. Sowohl im Aggregate- als auch im Betriebsmittelschlüssel des KKS sind jedoch den einzelnen klassifizierenden Kennbuchs Mehr erfahren30,00 €32,10 € Inkl. MwSt.
-
Elektrostaciju tehniskie un komerciālie pamatrādītāji (Latvian, Technical and Commercial Key Indicators for Power Plants, free of charge - ebook)VGB-S-002-03-2019-10-LV-ebookŠis VGB standarts ļauj lietotājam veikt elektrostaciju tehnisko un ekonomisko novērtējumu. Turklāt, izmantojot VGB standartu, var analizēt cenu ietekmes un tiesisko prasību ietekmi uz elektrostacijas darbību. Lietotājs saņem datu aps Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Protection Measures on Reinforced Concrete Cooling Towers and Chimneys against Operational and Environmental Impacts - ebookR612e-ebookAs a result of particular impacts and stresses affecting reinforced concrete cooling towers and chimneys and strengthend by their special structures and conditions of operation, adequate instructions are required for contractors initially applying or Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
KKS Kraftwerk-Kennzeichensystem - 8. überarbeitete Ausgabe 2018 (DEUTSCH) - ebookVGB-S-811-01-2018-01-DE-ebookDurch den nationalen und internationalen Normungsprozess wird das Kraftwerk-Kennzeichen-System (nachfolgend KKS) durch das, auf DIN ISO 81346-10 basierende RDS-PP®, abgelöst. RDS-PP® gilt damit „als anerkannte Regel der Technik&ldq Mehr erfahren680,00 €727,60 € Inkl. MwSt.
-
Code of Practice for Lifecycle Management of Reinforced Concrete Cooling Towers in Power Plants - ebookR613e-ebookThis Guideline addresses the lifecycle management of reinforced concrete cooling towers. Lifecycle management comprises maintenance of the structure and measures to ensure the safety of a cooling tower. Effective lifecycle management must be preventi Mehr erfahren110,00 €117,70 € Inkl. MwSt.