Back to Top
- Alternative Suchbegriffe
- kks and 864 978 and plant plat
- kks and 864 978 and plants plus
- Verwandte Suchbegriffe
- 978 3 86875 2010 2
- 978 3 86875 00 5
- 978 3 86875 07 5
- 978 3 96284 2010 1
- 978 3 96284 268 0 print
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - PrintVGB-S-042-00-2018-01-ENThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - ebookVGB-S-042-00-2018-01-EN-ebookThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - ebookVGB-S-026-00-2013-04-EN-ebookThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - PrintVGB-S-026-00-2013-04-ENThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - PrintVGB-S-130-00-2017-07-ENMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - ebookVGB-S-130-00-2017-07-EN-ebookMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - ebookVGBE-S-455-00-2022-12-EN-ebookThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - PrintVGBE-S-455-00-2022-12-ENThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Guide for the Procurement of Steam Turbine Plants - PrintVGB-S-145-00-2015-11-ENThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Guide for the Procurement of Steam Turbine Plants - ebookVGB-S-145-00-2015-11-EN-ebookThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Assessment of fatigue loaded components in hydro power plants - PrintVGB-S-034-00-2014-10-ENThe VGB-Standard VGB-S-034-00-2014-10-EN deals with mechanical components and steel hydraulic structures for hydro power plants. The VGB-Standard deals solely with the impact of mechanical and/or thermal loads on the fatigue life of the plant pa Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
RDS-PP® Reference Designation System for Power Plants - Letter Code for Power Plant Systems (System Key / ENGLISH) - PrintVGB-S-821-00-2016-06-ENThe basic international standards for reference designation provide users with generally applicable general rules and letter codes for main classes for the designation of technical objects and their documentation. The standard for power plants estab Mehr erfahren680,00 €727,60 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Equipment for Cleaning of Heat Transfer Surfaces in Steam Raising Plants - Operation, Maintenance and Expert Systems - PrintVGB-S-221-00-2014-06-ENVery substantial advances have been made over the last couple of years in the field of heat transfer surface cleaning which are included in the present revision of the Standard (cf. first edition). New methods like explosion cleaning are now included Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - PrintVGB-S-504-00-2015-12-ENSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - ebookVGB-S-504-00-2015-12-EN-ebookSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Coal Handling in Power Plants - ebookM211e-ebookThe VGB Instruction Sheet “Coal Handling in Power Plants” contains a collection of experience and recommendations which was prepared to the best of our knowledge but cannot always completely reproduce the state of the art. It provides a s Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
IT Security for Generating Plants - PrintVGB-S-175-00-2014-04-ENThe present VGB Standard S-175 explains fundamental concepts and compiles the threats and the security requirements derived from them in a structured and clear manner. In addition, recommendations for actions regarding the individual requirements hav Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
IT Security for Generating Plants - ebookVGB-S-175-00-2014-04-EN-ebookThe present VGB Standard S-175 explains fundamental concepts and compiles the threats and the security requirements derived from them in a structured and clear manner. In addition, recommendations for actions regarding the individual requirements hav Mehr erfahren280,00 €299,60 € Inkl. MwSt.