Back to Top
- Alternative Suchbegriffe
- kks and 8964 978 and puls plant
- kks and 8964 978 and puls plus
- Verwandte Suchbegriffe
- 978 3 86875 2024 2
- 978 3 86875 00 5
- 978 3 86875 07 5
- 978 3 96284 12 9
- 978 3 96284 268 0 print
-
Protection Measures on Reinforced Concrete Cooling Towers and Chimneys against Operational and Environmental Impacts - ebookR612e-ebookAs a result of particular impacts and stresses affecting reinforced concrete cooling towers and chimneys and strengthend by their special structures and conditions of operation, adequate instructions are required for contractors initially applying or Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
RDS-PP® Reference Designation System for Power Plants - Letter Code for Power Plant Systems (System Key) - Excel-table (English edition)RDS-PP-EXCEL-ENThe basic international standards for reference designation provide users with gen-erally applicable general rules and letter codes for main classes for the designation of technical objects and their documentation. The standard for power plants esta Mehr erfahren2.950,00 €3.156,50 € Inkl. MwSt.
-
Feed Water, Boiler Water and Steam Quality for Power Plants/Industrial Plants - ebookVGBE-S-010-00-2023-08-EN-ebookvgbe energy e.V. hereby presents a revised version of the VGB-Standard VGB-S-010 for "Feed Water, Boiler Water and Steam Quality for Power Plants/Industrial Plants". This revised vgbe-Standard replaces the former edition 2011.This vgbe-Standard is av Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
Feed Water, Boiler Water and Steam Quality for Power Plants/Industrial Plants - PrintVGBE-S-010-00-2023-08-ENvgbe energy e.V. hereby presents a revised version of the VGB-Standard VGB-S-010 for "Feed Water, Boiler Water and Steam Quality for Power Plants/Industrial Plants". This revised vgbe-Standard replaces the former edition 2011.This vgbe-Standard is av Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - PrintVGB-S-170-42-2014-08-ENThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Selection of impulse pipes and sampling lines for water and steam sectors in thermal power stations - ebookVGB-S-170-R-41;2012-07.EN-ebookThis VGB-Standard was created to adapt the design of measurement and analytical/ discharge lines to the increased steam parameters and the updated long-term parameters. Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Conception, Specifications and Performance Verification for Demineralization Plants - ebookM407e-ebookThe Instruction Sheet on hand is intended to replace Instruction Sheet M 407 G, "Bases for Planning, Ordering and Verification of Warranted Performance for Demineralization Plants with Ion Exchangers", the first and latest edition of which was publis Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Coal Bunkers – Planning, design, equipment and operation - ebookM206e-ebookThe VGB Instruction Sheet “Coal Bunkers” contains a collection of experience and recommendations which was prepared according to the best of our knowledge but which cannot always completely reproduce the state of the art. It provides a su Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Oil system cleaning for gas and steam turbine plants - ebookVGB-S-030-00-2013-06-EN-ebookBy collecting and evaluating the vast experience gained during the operation, installation, modification and revision of gas and steam turbine oil plants and incorporating them into this VGB-Standard, the intention is to contribute to the operational Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Oil system cleaning for gas and steam turbine plants - PrintVGB-S-030-00-2013-06-ENBy collecting and evaluating the vast experience gained during the operation, installation, modification and revision of gas and steam turbine oil plants and incorporating them into this VGB-Standard, the intention is to contribute to the operational Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - ebookVGBE-S-455-00-2022-12-EN-ebookThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - PrintVGBE-S-455-00-2022-12-ENThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - PrintVGB-S-115-00-2016-01-ENThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - ebookVGB-S-115-00-2016-01-EN-ebookThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Fire and Explosion Protection in Biomass Power Plants - ebookVGB-S-018-00-2013-12-EN-ebookThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Fire and Explosion Protection in Biomass Power Plants - PrintVGB-S-018-00-2013-12-ENThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Condition Monitoring and Inspection of Components of Steam Boiler Plants, Pressure Vessel Installations and Water- or Steam-Pipes in Thermal Power Plants - 3rd edition 2019 - PrintVGB-S-506-00-2019-02-ENThis VGB Standard describes possibilities and methods for condition monitoring and performance of tests and inspections in due consideration of hazards especially arising from steam and pressure in components of steam boiler plants, pressure vessel i Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Application, design and quality assurance criteria for the use of fibre-reinforced plastics in power plant construction - ebookVGB-S-609-00-2016-03-EN-ebookThis VGB-Standard replaces the former VGB guideline VGB-R 609e, which had the same title and dates from 2003. Mehr erfahren220,00 €235,40 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - PrintVGB-S-121-00-2016-04-ENMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.