Back to Top
- Alternative Suchbegriffe
- 202 vor 91 no 11
- 222 vor 91 no 11
- Verwandte Suchbegriffe
- vorschrift for de sicherung
- vorschrift fur de sicherung
- vortrag chemie im kraftwerk 2014
- 2022 de
- 2022 08 de
-
Coal Bunkers – Planning, design, equipment and operation - ebookM206e-ebookThe VGB Instruction Sheet “Coal Bunkers” contains a collection of experience and recommendations which was prepared according to the best of our knowledge but which cannot always completely reproduce the state of the art. It provides a su Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Coal Handling in Power Plants - ebookM211e-ebookThe VGB Instruction Sheet “Coal Handling in Power Plants” contains a collection of experience and recommendations which was prepared to the best of our knowledge but cannot always completely reproduce the state of the art. It provides a s Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Corrosion Protection for Offshore Wind Structures - Part 1 to Part 3 (2023), and Part 4 (2018) [free of charge] - ebookVGBE-S-021-XX-YYYY-MM-EN-ebookCorrosion Protection for Offshore Wind Structures - Part 1: General. Part 2: Requirements for Corrosion Protection Systems. Part 3: Application of Coating Systems. Part 4: Cathodic Protection (CP) Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Richtreihen zur Bewertung der Gefügeausbildung und Zeitstandschädigung warmfester Stähle für Hochdruckrohrleitungen und Kesselbauteile und deren Schweißverbindungen - ebookVGBE-S-517-00-2024-11-DE-ebookZur Ermittlung des Gefügezustandes und Feststellung der Werkstofferschöpfung werden an langzeitig im Kriechbereich betriebenen Kraftwerkskomponenten bauteilmetallografische Gefügeuntersuchungen durchgeführt. Reale Gefügebilder, Teil dieses vgbe- Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Richtreihen zur Bewertung der Gefügeausbildung und Zeitstandschädigung warmfester Stähle für Hochdruckrohrleitungen und Kesselbauteile und deren Schweißverbindungen - PrintVGBE-S-517-00-2024-11-DEZur Ermittlung des Gefügezustandes und Feststellung der Werkstofferschöpfung werden an langzeitig im Kriechbereich betriebenen Kraftwerkskomponenten bauteilmetallografische Gefügeuntersuchungen durchgeführt. Reale Gefügebilder, Teil dieses vgbe- Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Rating charts for rating the microstructural composition and creep rupture damage of creep-resistant steel for high pressure pipelines and boiler components and their weld connections - ebookVGBE-S-517-00-2024-11-EN-ebookTo determine the microstructural condition and assess material fatigue, metallographic microstructural analyses are performed on power plant components that have been operated in the creep range for long periods of time. Real microstructural images, Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Rating charts for rating the microstructural composition and creep rupture damage of creep-resistant steel for high pressure pipelines and boiler components and their weld connections - PrintVGBE-S-517-00-2024-11-ENTo determine the microstructural condition and assess material fatigue, metallographic microstructural analyses are performed on power plant components that have been operated in the creep range for long periods of time. Real microstructural images, Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Empfehlungen für den maschinentechnischen Generatorschutz - ebookVGB-S-164-11-2016-08-DE-ebookUm Schäden an Generatoren in Kraftwerken bereits im Entstehungsstadium zu erfassen, werden Schutzeinrichtungen eingebaut. Der VGB-Standard S-164-11 zeigt die Schutzmaßnahmen auf, die sich aus der Überschreitung thermischer Grenzen, de Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Methodik für das Vorgehen bei Qualifizierung von zerstörungsfreien Prüfungen (VGB-ENIQ-Richtlinie) - ebookR516ebookDiese Richtlinie beinhaltet die allgemeine Vorgehensweise bei Qualifizierungen und legt die Schritte für die Qualifizierung (Eignungsnachweis) einer zerstörungsfreien Prüfung fest. Die Qualifizierung soll sicherstellen, dass die Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Recommendations for thermal/mechanical generator protection - PrintVGB-S-164-11-2016-08-ENTo detect incipient damage to generators in power plants, protective equipment is installed. For electrical protection, in 2012 VGB published recommendations in the VGB-Standard VGB-S-025 “Electrical Generating Unit Protection”. The VGBSt Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Recommendations for thermal/mechanical generator protection - ebookVGB-S-164-11-2016-08-EN-ebookTo detect incipient damage to generators in power plants, protective equipment is installed. For electrical protection, in 2012 VGB published recommendations in the VGB-Standard VGB-S-025 “Electrical Generating Unit Protection”. The VGBSt Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
RDS-PP® Referenzkennzeichensystem für Kraftwerke - Kennbuchstaben für Kraftwerkssysteme (Systemschlüssel / DEUTSCH) - PrintVGB-S-821-00-2016-06-DEDie internationalen Grundnormen zur Referenzkennzeichnung bieten den Anwendern allgemeingültige Grundregeln und Kennbuchstaben für Hauptklassen zur Kennzeichnung von technischen Objekten und deren Dokumentation. Die Fachnorm für Kraft Mehr erfahren680,00 €727,60 € Inkl. MwSt.
-
RDS-PP® Referenzkennzeichensystem für Kraftwerke - Kennbuchstaben für Kraftwerkssysteme (Systemschlüssel / DEUTSCH) - ebookVGB-S-821-00-2016-06-DE-ebookDie internationalen Grundnormen zur Referenzkennzeichnung bieten den Anwendern allgemeingültige Grundregeln und Kennbuchstaben für Hauptklassen zur Kennzeichnung von technischen Objekten und deren Dokumentation. Die Fachnorm für Kraft Mehr erfahren680,00 €727,60 € Inkl. MwSt.
-
Innere Reinigung von Wasserrohr-Dampferzeugeranlagen und Rohrleitungen - PrintVGB-S-513-00-2014-07-DEDer VGB-Standard "Innere Reinigung von Wasserrohr-Dampferzeugeranlagen und Rohrleitungen" sollte Anwendung finden für die Reinigung von Dampfkesselanlagen und Rohrleitungen nach deren Neuerrichtung, aber auch bei Bedarf, z. B. nach längeren Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Internal Cleaning of Water-Tube Steam Generating Plants and Associated Pipework - PrintVGB-S-513-00-2014-07-ENThe VGB-Standard shall apply to the cleaning of newly erected steam boiler plants and associated pipework, but, where required, e.g. after longer operational periods, it shall also apply to major repairs and inspections as well as in the case of othe Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Measurement Systems - PrintVGB-S-170-43-2015-07-ENMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Measurement Systems - ebookVGB-S-170-43-2015-07-EN-ebookMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
RDS-PP® Reference Designation System for Power Plants - Letter Code for Power Plant Systems (System Key / ENGLISH) - PrintVGB-S-821-00-2016-06-ENThe basic international standards for reference designation provide users with generally applicable general rules and letter codes for main classes for the designation of technical objects and their documentation. The standard for power plants estab Mehr erfahren680,00 €727,60 € Inkl. MwSt.
-
VGB-Standard for the Water in Nuclear Power Plants with Light-Water Reactors Part 1: PWR Part 2: BWR - ebookVGB-S-401-00-2020-05-EN-ebookAlmost half a century after publication of the first edition of a VGB-Guideline for the Water in Nuclear Power Plants with Light-Water Reactors and approx. 13 years after the third edition in 2006, the task of a renewed adaptation of the Guideline fo Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
VGB-Standard for the Water in Nuclear Power Plants with Light-Water Reactors Part 1: PWR Part 2: BWR - PrintVGB-S-401-00-2020-05-ENAlmost half a century after publication of the first edition of a VGB-Guideline for the Water in Nuclear Power Plants with Light-Water Reactors and approx. 13 years after the third edition in 2006, the task of a renewed adaptation of the Guideline fo Mehr erfahren270,00 €288,90 € Inkl. MwSt.