Back to Top
- Alternative Suchbegriffe
- kks and 86 978 and puls plus
- kks and 864 978 and puls plat
- Verwandte Suchbegriffe
- 978 3 86875 2012 2
- 978 3 86875 2024 2
- 978 3 86875 07 5
- 978 3 96284 12 9
- 978 3 96284 2014 1
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - PrintVGB-S-042-00-2018-01-ENThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - ebookVGB-S-042-00-2018-01-EN-ebookThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Implementation guideline for motors and variable-speed power drive systems - PrintVGB-S-168-00-2013-12-ENThe aim of this VGB Standard is to provide an effective aid to the parties involved in the planning and specification of motors and variable-speed power drive systems (especially design engineers, operators and manufacturers) by means of extensive ha Mehr erfahren250,00 €267,50 € Inkl. MwSt.
-
Implementation guideline for motors and variable-speed power drive systems - ebookVGB-S-168-00-2013-12-EN-ebookThe aim of this VGB Standard is to provide an effective aid to the parties involved in the planning and specification of motors and variable-speed power drive systems (especially design engineers, operators and manufacturers) by means of extensive ha Mehr erfahren250,00 €267,50 € Inkl. MwSt.
-
Corrosion Protection for Offshore Wind Structures - Part 1 to Part 3 (2023), and Part 4 (2018) [free of charge] - ebookVGBE-S-021-XX-YYYY-MM-EN-ebookCorrosion Protection for Offshore Wind Structures - Part 1: General. Part 2: Requirements for Corrosion Protection Systems. Part 3: Application of Coating Systems. Part 4: Cathodic Protection (CP) Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on steam turbine plants - PrintVGB-S-103-00-2020-02-ENThis standard is addressed to manufacturers, service providers and operators of steam turbine plants and is in particular to assist operators in equipping their steam turbine plants. The safe operation of steam turbines makes great demands on Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on steam turbine plants - ebookVGB-S-103-00-2020-02-EN-ebookThis standard is addressed to manufacturers, service providers and operators of steam turbine plants and is in particular to assist operators in equipping their steam turbine plants. The safe operation of steam turbines makes great demands on Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Indication and Application of Actions on Buildings in Power Plants - PrintVGB-S-602-00-2016-04-ENThe aim of this VGB standard is to provide a consistent procedure for the definition, classification and processing of actions on load-bearing structures for the construc-tion of power plants. It is also intended to cover significant influences of op Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Indication and Application of Actions on Buildings in Power Plants - ebookVGB-S-602-00-2016-04-EN-ebookThe aim of this VGB standard is to provide a consistent procedure for the definition, classification and processing of actions on load-bearing structures for the construc-tion of power plants. It is also intended to cover significant influences of op Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - PrintVGB-S-020-00-2017-12-ENThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - ebookVGB-S-020-00-2017-12-EN-ebookThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - PrintVGB-S-130-00-2017-07-ENMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - ebookVGB-S-130-00-2017-07-EN-ebookMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Preservation of Steam and Gas Turbo-Generator Sets - 2nd edition - PrintVGB-S-036-00-2017-04-ENThe editorial team has decided to take the steam turbine and the generator from the VGB-R 116 “Preservation of Power Plants” (republished as VGB-S-116-00-2016-04- EN “Preservation of Power Plants”), to add a section on the gas Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Preservation of Steam and Gas Turbo-Generator Sets - 2nd edition - ebookVGB-S-036-00-2017-04-EN-ebookThe editorial team has decided to take the steam turbine and the generator from the VGB-R 116 “Preservation of Power Plants” (republished as VGB-S-116-00-2016-04- EN “Preservation of Power Plants”), to add a section on the gas Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Internal Cleaning of Water-Tube Steam Generating Plants and Associated Pipework - PrintVGB-S-513-00-2014-07-ENThe VGB-Standard shall apply to the cleaning of newly erected steam boiler plants and associated pipework, but, where required, e.g. after longer operational periods, it shall also apply to major repairs and inspections as well as in the case of othe Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Messtechnik - ebookVGB-S-170-43-2015-07-DE-ebookDer VGB-Standard VGB-S-170-43 gilt für die Anordnung und Ausführung von Fernmesseinrichtungen einschlägiger Prozessmessgrößen und von örtlichen Messeinrichtungen in konventionellen und regenerativen Anlagen der Strom- u Mehr erfahren280,00 €299,60 € Inkl. MwSt.